|
COMMERCE BUSINESS DAILY ISSUE OF AUGUST 31,1999 PSA#2422184th LS/LGC -- KS ANG, 57330 Mustang Dr, Suite 13, McConnell AFB, KS
67221-9013 J -- REPAIR/MODIFY HYDRAULIC GROUND POWER UNITS (HGPU) SOL
DAHA14-99-Q8065 DUE 100899 POC Point Of Contact -- Bill Phillips,
Contract Specialist, see description for fax and e-mail. E-MAIL:
Contract Specialist, william.phillips@ksmcco.ang.af.mil. THIS IS A
COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS PREPARED IN
ACCORDANCE WITH THE FORMAT IN SUBPART 12.6, AS SUPPLEMENTED WITH
ADDITIONAL INFORMATION INCLUDED IN THIS NOTICE. THIS ANNOUNCEMENT
CONSTITUTES THE ONLY SOLICITATION; WRITTEN QUOTES ARE BEING REQUESTED
AND A WRITTEN SOLICITATION WILL NOT BE ISSUED. This solicitation is
DAHA14-99-Q-8065 and is being issued as a Request for Quotation. This
solicitation document and incorporated provisions and clauses are those
in effect through Federal Acquisition Circular 97-13. This procurement
is being issued unrestriced as to business size due to no known small
business sources. The Standard Industrial Code (SIC) is 3699 and or
with a size standard of 750 employees. Repair/modify five (5) Hydraulic
Ground Power Units (hpgu) in accordance with the Statement of Work as
follows: General: Five (5) HGPU units will be located on covered,
government provided pads adjacent to building 1107. Four (4) adjacent
HGPU units will be placed in a selected location to support the north
east aircraft position within bldg. 1107. One (1) HGPU will remain in
reserve and function as a back-up. Facility support will be programmed
and designed by the government (A-E firm) This facility support will
not be in-place prior to completion of the equipment refurbishment
contract. The contract will be accomplished in 3 phases or negotiated
phases as agreed to by the government: Phase I : During a 4-day on-site
visit by the Contractor, the following will occur: 1) Demonstrate the
full capability of the proposed Allen Bradley PanelView900 or approved
equal to control hangar assets as well as HGPU 2) Demonstrate
potential interface with the base DDC control system, provide advice on
siting clearances, optimum siting conditions, facility power
requirement, cooling load and any other required structural,
electrical, HVAC, civil engineering data needed to support the unit 3)
Obtain user inputs as to full scope of control pages, monitoring, etc
required 4) Thoroughly inspect each of ten on-site units to determine
the optimum 5 that require the least amount of labor to refurbish, 6)
Provide a detailed statement of work and systems checklist that
includes all work to be accomplished on the HGPUs . Provide a detailed
cost spreadsheet the includes all costs including but not limited to
labor, material, per diem, travel, shipping to result in completely
refurbished HGPU units to be accomplished in Phases II and III. Provide
cost of work accomplishment at contractor's home station with shipping
vs. cost of performing work at McConnell AFB. 7) Contractor will
submit a detailed test procedure that will be used to insure the
capability of the units upon delivery after refurbishment. 8) Negotiate
the fee for the proposed Phase I and Phase II services. Phase II:
(assumes it is more economical to refurbish units at contractor's
facility). 1) The contractor will transport the units to the
contractor's location at Palmdale, California. A complete inspection of
the condition of each unit with close-up pictures will be accomplished
at McConnell using detailed checklist. 2) The Contractor will
refurbish the units at the Contractor's site, notify the government
when transportation will occur. The government will be provided an
option to inspect the units prior to shipping and to transport the
units. If the government does not exercise this option, the contractor
will deliver the units to McConnell AFB. Contractor delivery is to be
assumed as part of the cost of this project. Phase III: Within 7 days
of delivery, the contractor will inspect the units at McConnell AFB
with McConnell 184th Maintenance personnel and make any repairs,
adjustments needed at contractor expense. The contractor is responsible
for any additional on-site expenses associated with failure to delivery
complete, usable units. The contractor will demonstrate the
acceptability of each unit by conducting an observable on-site run-up
and systems check on each unit in accordance with test procedure
accepted as part of Phase I. Equipment:The Contractor shall perform
(but not be limited to) the following generally described requirements:
1. Inspect HGP units: a. Replace the existing control system in each
unit with Allen Bradley control b. Re-work/overhaul the main pumps, new
level sensors, lower level cutoffs, flow and pressure controllers and
any other parts identified when units are checked. c. Provide
software/hardware interface that allows user to troubleshoot the system
and establish pre-set shut-down to prevent damage to aircraft equipment
as recommended by the contractor and as selected by the equipment users
after demonstration of options. Displays and controls will be
customized to user requirements and include the following: 1) Fill,
drain, service, circulate for aircraft hydraulic fluid 2) Pretest on
HGPU's, with diagnostics 3) Gallons per minute per system 4)
Temperature per system with flashing screen for overtemp condition 5)
Pressure reading per unit 6) On/off button for elect, and cooling air
7) Emergency shutdown d. Perform complete systems check on each unit.
Replace seals, gaskets, wiring, controls, fluids, any other components
subject to degradation with continued use in order to result in usable
units that should not require major overhaul or disassembly for the
foreseeable future. Functions such as aircraft fill, drain, closed loop
and open loop testing at 4000 psi are some of the control requirements.
The Panelview control box (described later) will be programmed to
control and monitor aircraft cooling and power from the same control
page. 2. Provide an Allen Bradley Panel View 900 operator terminal or
equal. This will allow remote control of the HGPU units from the
working location in the hangar. 3. Provide one Allen Bradley 13-slot
SLC 500 modular controller with power supply for each HGPU and modify
control system for each HGPU as necessary for the new modular
controller and control panel. Provide SLC 500 AI Series, DOS based
programming software. 4. Supply all necessary material to accomplish
the work includingAllen Bradley control heads, hoses, lines, power
adapters, logic controllers, etc. 5. Provide a listing of
parts/components (with necessary information to order) that are subject
to recurring maintenance replacement or common breakage. 6. Provide
control diagram schematics for the units, complete parts listings. 7.
Provide a listing of recurring maintenance required -- actions and
recommended recurrence intervals. Also provide a listing of
recommendations associated with long-term non-use of the units. (in the
event of long lead between equipment refurbishment and facility
alteration to support the use of the units. 8. Provide 4 days of
on-site training in the operation and maintenance of the units. 9.
Contractor shall list all required government support needed to test
the units upon delivery such as: a. Desired on-base testing location.
b. Temp power requirement c. Temp cooling requirement d. Piping
connections/valves, indicators to simulate head conditions under load.
The contractor shall be responsible for any additional cost including
but not limited to time, travel, shipping, parts, etc needed to render
the units completely usable in the event of failure to meet all
performance requirements at the time of acceptance testing. As part of
a follow-on contract, not included in this contract will be a
follow-on visit to McConnell AFB to make all equipment connections to
supporting power, HVAC, etc. when facility support is installed and
available 10. Warranty: The contractor shall warrant the operation of
the units for a period of one year following acceptance testing and
contract completion. Prospective contractors are encouraged to visit
the unit and inspect the units prior to submitting a quote with company
terms and conditions subject to a negotiated agreement. Delivery date
is negoiatable, but performance shall begin within 20 days of the
contract/purchase order document. Delivery destination is: KANSAS AIR
NATIONAL GUARD, 57330 MUSTANG DRIVE, MCCONNELL AFB, KS, 67221-9013,
with freight being anegotiable item. Delivery acceptance will be FOB
Destination. EVALUATION FACTORS: Quotes will be evaluated on price,
ability to meet or exceed the technical requirements as outlined in the
sow, and demonstrated past performance on contracts of similar size and
complexity to this requirement. Information provided must demonstrate
the ability to meet the stated characteristics. The Government
anticipates one award to the responsive, responsible quoter that is
considered most advantageous to the Government. The provision FAR
52.212-1, Instructions to Quoters -- Commercial Items applies; clauses
52.212-4, Contract Terms and Conditions -- Commercial Items and
52.212-5 Contract Terms and Conditions Required to Implement Statutes
or Executive Orders -- Commercial Items also apply. The contractor may
be required to sign Purchase order document and agreeing to additional
terms and conditions as directed by the contracting officer. The clause
appliciable will be based on competitive quotes received. QUOTES ARE
DUE in the 184 BW Contracting Office Sep 8, 1999, 1:00 p.m. local
prevailing time(cst). The quote acceptance period shall be at least 30
days. Faxed quotes are acceptable and encouraged. Acknowledgment of
solicitation amendments, if any, and completed Representations and
Certifications -- Commercial Items, FAR 52.212-3 must accompany quote.
SPECIAL NOTE The Director, Defense Procurement has revised DFARS to
require contractors to be registered in the Central Contractor
Registration (CCR) as a condition for receipt of contract award
effective 1 June 1998. Quoters may obtain information on registration
and annual confirmation requirements by calling 1-888-227-2423, or vial
the Internet at http://ccr.edi.disa.mil. For further detains regarding
the requirements of CCR, quoters are advised to review the
requirements of DFAR 252.204-7004 contained herein. 252.204-7004
Required Central Contractor Registration. [As prescribed in 204.703],
use the following clause: Required Central Contractor Registration (MAR
98) (a) Definitions. As used in this clause (1) Central Contractor
Registration (CCR database means the primary DOD repository for
contractor information required to the conduct of business with DOD.
(2) Data Universal Numbering System (DUNS) number means the 9-digit
number assigned by Dun and Bradstreet Information Services to identify
unique business entities. (3) Data Universal Numbering System
+4(DUNS+4) number means the DUNS number assigned by Dun and Bradstreet
plus a 4-digit suffix that may be assigned by a parent (controlling)
business concern. This 4-digit suffix may be assigned at the discretion
of the parent business concern for such purposes as identifying
sub-units or affiliates of the parent business concern. (4) Registered
in the CCR database means that all mandatory information, including
the DUNS number or the DUNS+4 number, if applicable, and the
corresponding Commercial and Government Entity (CAGE) code, is in the
CCR database; the DUNS number and the CAGE code have been validated;
and all edits have been successfully completed. (b)(1) By submission of
an offer, the offeror acknowledges the requirement that a prospective
awardee must be registered in the CCR database prior to award, during
performance, and through final payment of any contract resulting from
this solicitation, except for awards to foreign vendors for work to be
performed outside the United States. (2) The offeror shall provide it
DUNS or, if applicable, its DUNS+4 number with its offer, which will
be used by the Contracting Officer to verify that the offeror is
registered in the CCR database. (3) Lack of registration in the CCR
database will make an offeror ineligible for award. (4) DOD has
established a goal of registering an applicant in the CCR database
within 48 hours after receipt of a complete and accurate application
via the Internet. However, registration of an applicant submitting an
application through a method other than the Internet may take up to 30
days. Therefore, quoters that are not registered should consider
applying for registration immediately upon receipt of this
solicitation. (c) The Contractor is responsible for the accuracy and
completeness of the data within the CCR, and for any liability
resulting from the Government's reliance on inaccurate or incomplete
data. To remain registered in the CCR database after the initial
registration, the Contractor is required to confirm on an annual basis
that its information in the CCR database is accurate and complete. (d)
Quoters and contractors may obtain information on registration and
annual confirmation requirements by calling 1-888-227-2423, or via the
Internet at http://ccr.edi.disa.mil. SUBMIT ALL INFORMATION TO: 184
Bomb Wing Contracting Office, 57330 Mustang Dr Suite 13, McConnell AFB,
Ks 67221-9013. Award of a purchase order is anticipated on or about 15
september 1999 . Information regarding this notice can be obtained
from Bill Phillips, by fax at (316)687-7925, or by email at
william.phillips@ksmcco.ang.af.mil. All responsible sources may submit
a response, which shall be considered by the Agency. Posted 08/27/99
(W-SN373152). (0239) Loren Data Corp. http://www.ld.com (SYN# 0081 19990831\J-0030.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|