|
COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 9,1999 PSA#2428Talisman Partners, Ltd., 5460 South Quebec St., Suite 100, Englewood,
Co 80111-1916 M -- PRIVATIZATION UNDER 10 USC 2688, UTILITY SYSTEMS: CONVEYANCE
AUTHORITY AT GRISSOM ARB, GRISSOM, IN. DUE 101999 POC Carie Lowry or
Bill Gruen, 303/771-3103 E-MAIL: email to POC, clowry@talpart.com. The
Air Force seeks to identify responsible potential sources and obtain
information in regards to privatization of utility systems in
accordance with 10 USC 2688, "Utility Systems: Conveyance Authority".
The Air Force is seeking interest and information specifically for the
potential privatization of the electrical and natural gas distribution
systems at Grissom ARB, Indiana. OBJECTIVE: Should privatization
result, the ownership of the Grissom ARB electrical and natural gas
distribution systems, operation and maintenance and obligation to
continue to provide utility service for an indefinite and ongoing
period will transfer to a utility service provider. All responsibility
for maintaining reliable utility service, including such items as
environmental compliance, maintenance costs, major system renovations,
construction, equipment, manpower and overhead costs will become the
utility service provider's responsibility. It is intended that the
privatization will ultimately reduce the Air Force's life-cycle costs
for operating and maintaining utility systems and services. SYSTEM
DESCRIPTIONS: The following is provided only to give an approximation
of the size, scope and general description of the system(s). Any
numbers should only be used for estimating purposes. The following
system parameters are approximations: Grissom ARB: Base Size: 1,233
acres, 98 Buildings. Grissom ARB Electrical System: Single 12.47 kV
feeder from Miami Cass County REMC. Primary Distribution (Underground):
24,700 LF. Primary Distribution (Overhead): 15,500 LF. Secondary
Distribution (Underground): 9,600 LF. Secondary Distribution
(Overhead): 8,500 LF. Peak Demand (Annual): 3,503 kW. Total Demand
(Annual): 17,694,528 kWh. Grissom ARB Natural Gas System: System
installed 1989 through 1996. Approximately 13,500 LF of assumed HDPE,
sdr 11 ranging from 8" to 1". No cathodic protection. Natural gas
delivered to base via 8" main and distribution at 50 psig. Annual
consumption: 3,279,600 MCF PROCEDURES: This request to interested
partiesis for gathering information and is a required component of a
systematic process to evaluate the interested parties under the Air
Force's utilities privatization program. In order to minimize costs
both to potentially interested parties and the government, this notice
is being issued to determine the interest and feasibility of
proceeding with a formal request for proposal. Should insufficient
credible interest be identified for a privatization action, it is
highly likely that no formal solicitation will be issued. SHOULD
INTEREST BE DETERMINED SUFFICIENT, A FORMAL REQUEST FOR PROPOSALS MAY
BE FORTHCOMING. Small Business interests shall note the FAR Part 19
Standard Industrial Codes (SIC) and Size Standards for the utility
systems identified in this announcement. Some, all, or any combination
of the following may apply. SIC/SS: 4911/4 Million (M) Megawatt hours,
4922/$5M, 4923/$5M, 4924/500, 4925/$5M, 4931/$5M, 4932/$5M, 4939/$5M,
4941/$5M, 4952/$5M, 4953/$6M, 4959/$5M, 4961/$9M, 4971/$5M. REQUESTED
RESPONSE: Interested parties should provide a statement of interest on
company letterhead (not to exceed 20 pages in length). The statement
should include as a minimum the following criteria: (1) capability and
experience in ownership, operation and maintenance of similar utility
systems, (2) financial capacity to purchase, expand and operate the
utility systems; (3) statement detailing the understanding of the
obligation to serve in regards to continuous utility service; (4)
statement detailing the legal right to serve, own, operate, and
maintain utility systems within state laws and an understanding of any
applicable federal, territorial and local utility laws, regulations or
franchise requirements affecting utilities in the territory, and
capability of complying with such requirements; and (5) statement
detailing the understanding of federal, territorial, and local
environmental laws and regulations and familiarity and experience with
environmental compliance procedures and regulations for the State of
Indiana andthe U. S. Environmental Protection Agency. Elaborate
proposals or pricing information is neither required nor desired. Under
no circumstances will cost data for the existing systems be provided.
Any innovative and new conceptual ideas to achieve the stated objective
are encouraged. If a site visit and the provision of additional data
are later determined necessary, notification will be provided by way of
an amendment to this announcement. It should be noted that RFIs for
different utility systems may be issued in the same time frame. A
separate response to each RFI is required. The point of contact is
Carie Lowry or Bill Gruen, 303/771-3103. Posted 09/07/99 (W-SN377115).
(0250) Loren Data Corp. http://www.ld.com (SYN# 0069 19990909\M-0001.SOL)
M - Operation of Government-Owned Facilities Index Page
|
|