Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 13,1999 PSA#2430

Commanding Officer, NCTAMS LANT, 9625 Moffett Avenue, Norfolk, VA 23511-2784

70 -- ATM TEST EQUIPMENT SOL N68057-99-Q-0007 DUE 091599 POC SYLVIA SUTTON, 757-445-4096, SuttonS@nctamslant.navy.mil ATM Test Equipment Requirements The Department of Navy information technology architectures evolve around asynchronous transfer mode (ATM). ATM technologies converge voice, video, and data. The ATM equipment shall perform detailed tests that measure performance, standard conformance, and quality of service. The listed equipment; hardware/ software enables the Technical Support Team to access, evaluate, analyze and test the latest ATM networking technology releases. EQUIPMENT SHALL CONTAIN: a. Modular chassis with up to 16 slots; 4 slot minimum b. Ethernet 10baseT remote control access c. Windows NT Based Controller Software d. 622MBps (OC-12) and 155MBps (OC-3) generation & analysis e. ATM Cell generation capabilities -- AAL0, AAL1, AAL2, AAL3/4, AAL5 f. Able to generate up to 7 independent streams of mixed Constant Bit Rate (CBR) & Variable Bit Rate (VBR) cell traffic per port g. Traffic shaping capability on all cell streams h. UNI 3.0/3.1/4.0 SVC signaling emulation capability i. OAM Cell generation & analysis j. Quality of Service (QoS) Analysis for 2000+ simultaneous cell streams at FULL LINE RATE 100% utilization. QoS Performance Measurements to include: Cell sequence number Transmission time stamp Single cell or cross cell PRBS pattern Payload CRC k. Automatic sub stream filtering by VPI/VCI and AAL type l. Substream Analysis and Statistics to include: Cell count, cell loss and cell loss ratio Misinsertion cell count and rate Errored cell count and rate Block count and severely erred block count and ratio Out-of-sequence cell count Mean, minimum, and maximum cell transfer delay Mean, minimum, and maximum cell interarrival time Cell transfer capacity and rate PRBS bit error count and rate PRBS synch error count Number of outages, longest outage, accumulated outages CLP=1 cell count and ration AAL CPCS PDU and error counts m. Protocol decodes for TCP/IP, LANE, PNNI, SVC Signaling, & Frame Relay n. Support OC-48 -2.4Gbps o. Supports Frame Relay DS-3 frame generation& analysis p. Supports Gigabit Ethernet frame generation & analysis q. Supports ABR emulation & analysis r. The contractor shall certify all hardware/software and/or accessories offered for this requirement are year 2000 compliant for Information Technology (IT) required to perform date/time processing involving dates subsequent to 31 Dec 1999. Posted 09/08/99 (W-SN377896). (0251)

Loren Data Corp. http://www.ld.com (SYN# 0489 19990913\70-0024.SOL)


70 - General Purpose ADP Equipment Software, Supplies and Support Eq. Index Page