COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 13,1999 PSA#2430Fluor Daniel Fernald, P.O. Box 538704, Cincinnati, OH 45253-8704 Y -- CONSTRUCTION OF STRUCTURES AND FACILITIES -- MODULAR LABORATORY
DUE 092999 POC James Reuter (513) 648-5166 Fluor Daniel Fernald (FDF)
and the Department of Energy (DOE) have prepared and approved a plan to
construct a 4872 square foot modular laboratory at the Fernald
Environmental Management Project (FEMP) located in Fernald, Ohio. In
addition, the modular laboratory facility will utilize three existing
DOE owned road transportable analytical laboratories (RTAL's) to
provide analytical service to the site during final remediation
activities. Work will include but is not limited to: site clearing and
grubbing; excavation and installation of underground piping;
foundation installation; design, system, fume hoods, case work, utility
piping, and countertops; fire alarm installation, HEPA filters;
Compressed air system; 13.2KV overhead electrical extension;
communication systems including telephone, evacuation, and computer;
utility piping installation; ramps, stairways, and walkway
installation. Potential proposers must meet the pre-qualification
criteria listed below; 1. Proposers or lower tier subcontractor must
possess (5) years experience in the set-up and installation of modular
structures. 2. The proposer must possess (5) years experience in the
performance of government contracts ranging in price from 1-5 million
dollars. 3. The proposer or lower tier subcontractor must be familiar
with excavation and installation of foundations, sanitary sewer, lift
stations, and domestic water. 4. The proposer or lower tier
subcontractor must possess (5) years experience in the installation of
13.2KV overhead electric, transformers, pole lines, disconnects, fire
alarm, and communications systems. 5. The proposer or lower tier
subcontractor must possess (5) years experience in the design,
fabrication, and installation of modular laboratory buildings including
HVAC design, fume hood ventilation, case work and finishings,
specification, HEPA Filter and installation of mechanical and utility
systems. 6. Safety Performance Information A. Proposers and their lower
tier subcontractors shall have a record of good safety performance to
be determined responsible and, therefore, eligible for any award on
projects managed by Fluor Daniel at the Fernald Environmental
Management Project in Fernald, Ohio. B. To be considered responsible,
a proposer must be able to demonstrate to the satisfaction of Fluor
Daniel that it has a record of safe performance as demonstrated by a
current workers compensation insurance experience modification rate
(EMR) of less than or equal to 1.00; or the trend for the past three
years is downward and none of the past three years had an EMR greater
than 1.15; or for proposers that are too small, too new or
self-insured, has an OSHA recordable incident rate of less than or
equal to 10 injuries and illnesses per 200,000 man hours for the past
calendar year. Each proposer shall submit the information required with
their qualifications. C. Firms who cannot meet the safety rates or
special criteria described in paragraph B above, but nevertheless
desire to submit their qualifications may do so on the following
conditions: 1. Include a narrative statement as to the reason(s) for
not being able to meet the criteria and request Fluor Daniel
consideration of any special circumstances that relate to its rating.
2. Fluor Daniel will evaluate the firm's request for special
consideration and acceptability of the bid. 3. The firm (proposer)
agrees that the Fluor Daniel evaluation and decision as to
acceptability for this solicitation is final and is not subject to
discussions of any type between Fluor Daniel and the proposer and is
not subject to any appeal or dispute. Proposer should send their resume
of qualifications to: James Reuter Fluor Daniel Fernald P. O. Box
538704 Cincinnati, Ohio 45253 Telephone: (513) 648-5166 Posted 09/08/99
(W-SN377892). (0251) Loren Data Corp. http://www.ld.com (SYN# 0195 19990913\Y-0008.SOL)