|
COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 14,1999 PSA#2431311th HSW/PKO, 8005 9th St, Bldg 625, Brooks AFB, TX 78235-5353 J -- ELEVATOR MAINTENANCE/REPAIR ON BROOKS AFB TX SOL 99QO944 DUE
102099 POC Ms Abbe Guerra, abbe.guerra@brooks.af.mil E-MAIL: Click here
to contact the contract specialist or contracting, Contract Specialist:
abbe.guerra@brooks.af.mil Contracting Officer: john.king@brooks.af.mil.
This is a combined synopsis/solicitation for commercial item prepared
in accordance with the format in FAR Subpart 12.6, as supplemented with
additional information included in this notice. This announcement
constitutes the only solicitation; proposals are being requested and a
written solicitation will not be issued. This is a Request for
Quotation (RFQ) for Solicitation #99QP044. Note 1. This award is being
set-aside for small businesses under SIC Code 7699. The standard for
small businesses is $5.0 million or less in annual receipts. STATEMENT
OF NEED 1.1 SCOPE. The contractor shall provide all qualified
personnel (labor), materials, tools, equipment, transportation,
supervision and other items necessary to perform all operations in
connection with the inspection and complete maintenance and reapir of
elevators as defined in this Statement of Need. 1.2 LOCATION. The work
sites are located at various buildings on Brooks AFB TX. Building
numbers are located on the bid schedule provided below. 1.3 The
contractor shall be a certified service representative (minimum of five
(5) years experience) of the particular system(s) and all work
accomplished shall be in accordance with the manufacturer's
recommendations for that system and applicable Safety and Health
Standards. 1.4 HOURS OF OPERATION. All inspections and
maintenance/repairs shall be performed during normal duty hours, 7:30
am to 4:15 pm, Monday through Friday. Brooks AFB Civil Engineering
Flight (311 CES/CECS) shall be notified three (3) days in advance of
any scheduled testing, inspections and maintenance. Emergency work
involving other than normal working hours shall be cleared through the
Contracting Officer. 1.5 ON-CALL SERVICE. The contractor shall provide
a designated point of contact and make necessary arrangements to insure
a point of contact is available within one (1) hour after verbal
notification by 311 CES/CECS or the Contracting Officer. (See para
1.5.1 for exceptions) 1.5.1 The contractor shall not honor requests for
on-call service from sources other than 311 CES/CECS or the Contracting
Officer. The only exceptions to this shall be calls made by Brooks
Security Forces Squadron and Fire Protection Flight in emergency
situations (trapped passenger). The contractor shall refer other calls
to 311 CES/CECS, 536-2317 during normal duty hours and to the 311
Civil Engineer Service Call Unit, 536-1856 after duty hours. 1.6
INSPECTION AND ACCEPTANCE. The Office having responsibility for
inspection and acceptance is the 311 Civil Engineer Squdron,
Engineering Flight. 1.6.1 Elevators may be added or deleted to this SON
as needed. When a building is added or deleted, the Contracting Officer
or Administrator will verbally notify the contractor followed by a
modification. 1.6.2 The Government will furnish the contractor all
reasonable amounts of electricity and other utilities necessary to
perform the services required in this SON. Mechanical equipment
controls for heating, ventilation, and air condition systems shall not
be adjusted by the contractor's employees. 2. SERVICE TICKET. After
service has been accomplished, the Contractor shall provide a service
ticket containing, at a minimum: date of service, nature of service
performed, name and signature of Contractor's personnel performing
service, certification of calibration and signature of the building
manager/inspector. 3. SPECIFIC TASKS. 3.1. The Contractor shall
inspect, maintain and repair elevators in accordance with the
requirement set forth in Safety Codes for Elevators and Escalators,
Inspector's Manual for Elevators and Escalators and manufacturer's
recommendations. 3.2. SCHEDULING: The Contractor shall coordinate with
the Government Quality Assurance Evaluator (QAE) and the building
manager when scheduling maintenance and repair operations. 3.3. Initial
inspections/maintenance shall be completed within ten (10) working days
from the contract start date. 3.3.1. The Contractor shall perform
quarterly, semi-annual and annual inspections as required in the ANSI
Codes 17.1 and ANSI 17.2.3.3.2. During the initial and monthly
inspections the Contractor shall thoroughly clean the entire hoistway
(pit areas) of all accumulated dirt, grease, dust and debris. 3.3.3.
Repairs shall be made by the Contractor as soon as possible, but NLT 24
hours after scheduled inspection unless otherwise authorized by the
Contracting Officer. 3.3.4. The Contractor shall notify the inspector
and building manager immediately of any unsafe conditions. The
Contractor shall disconnect the main power supply for the elevators,
then post an "Out of Order" sign on each applicable elevator door.
3.3.5. Job sites shall be kept neat and clean at all times. Storage of
oily rags, lubricants, paints, equipment, etc., on Government property
will not be permitted. 3.3.6. The Contractor shall not perform labor
that is outside the scope of this SON without prior approval from the
Contracting Officer. No additional charges may be accrued without the
prior consent of the Contracting Officer. 4. REPLACEMENT/REPAIR PARTS:
Replacement parts and materials having a value as defined below
$150.00 or less per item, per job, per service call, shall be furnished
and installed by the Contractor at no cost to the Government. 4.1.
Replacement parts and materials having a value as defined in excess of
$150.00 per item, per job, per service call, SHALL BE SUBJECT TO
APPROVAL OF THE CONTRACTING OFFICER PRIOR TO PLACEMENT. Such parts and
materials shall be furnished and installed at a cost to the Government
of their value as defined below. 4.2. Value shall be defined as 100% of
the item cost to the Contractor from his supplier as determined by the
latest supplier's price list and EXCLUSIVE OF SHIPPING COST. 4.3. The
Contractor is required to furnish the inspector an itemized list
showing parts and materials needed for any repair(s) within five (5)
working days after inspection. The Contractor shall provide parts that
are new or reconditioned to equal or exceed the original
manufacturer's parts and shall carry a part number. PROPOSALS SHALL
INCLUDE MONTHLY AMOUNTS FOR THE FOLLOWING LINE ITEMS: BLDG 110 ELEVATOR
CLIN 0001 Hydraulic Passenger (SN CW14248) BLDG 125 ELEVATORS
(Electric) CLIN 0002 Passenger, Operatorless Control Montgomery (SN
12309) CLIN 0003 Passenger, Operatorless Control Montgomery (SN 12310)
CLIN 0004 Freight (SN 12311) CLIN 0005 Freight (SN 12312) BLDG 150 --
ELEVATOR CLIN 0006 Oildraulic Passenger Dover BLDG 155 -- ELEVATOR
CLIN 0007 Hydraulic Freight BLDG 170 -- ELEVATOR CLIN 0008 Hydraulic
Passenger (Westinghouse C156) BLDG 186 -- ELEVATOR CLIN 0009 Hydraulic
Freight BLDG 532 -- ELEVATOR CLIN 0010 Oildraulic Passenger Dover (SN
25K474) BLDG 578 -- ELEVATORS CLIN 0011 Hydraulic Passenger Dover
(B2696) CLIN 0012 Electric Dumbwaiter (SN 11893) BLDG 1150 -- ELEVATORS
CLIN 0013 Passenger, Dover CP-60-15, (SN 80113) CLIN 0014 Passenger,
Dover CP-60-15, (SN 80120) BLDG 1156 -- ELEVATOR CLIN 0015 Hydraulic
Passenger Dover A completed copy of Offeror Representations and
Certifications -- Commercial Itms (FAR 52.212-3) shall be included with
all offers. The following contract clauses are applicable to this
acquisition: FAR 52.212-4 Contract Terms and Conditions-Commercial
Items; FAR 52.212-5 Contract Terms and Conditions Required to Implement
Statutes or Executive Orders-Commercial Items. Please submit offers to
Abbe Guerra by e-mail at abbe.guerra@brooks.af.mil or by fax at
210-536-4253/4450 by Monday 20 Sep 99. Posted 09/10/99 (W-SN379114).
(0253) Loren Data Corp. http://www.ld.com (SYN# 0052 19990914\J-0019.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|