|
COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 24,1999 PSA#2440Basile Baumann Prost & Associates, Inc., Nichols Center, Suite 10, 177
Defense Highway, Annapolis, MD 21401-7006 E -- PRIVATIZATION UNDER 10 USC 2688, UTILITY SYSTEMS: CONVEYANCE
AUTHORITY AT HANCOCK AIR NATIONAL GUARD BASE, SYRACUSE, NEW YORK DUE
101199 POC Contact: Burns & McDonnell Engineering Co. (Contractor for
the U.S. Air Force), 9400 Ward Parkway, Kansas City, MO 64114. POC:
Randy Foster, Tel (816) 822-3852. E-MAIL: click here to contact Randy
Foster via e-mail, rfoster@burnsmcd.com. PRIVATIZATION UNDER 10 USC
2688, UTILITY SYSTEMS: CONVEYANCE AUTHORITY AT HANCOCK AIR NATIONAL
GUARD BASE, NEW YORK, SOL: N/A, DUE: 10/11/99 POTENTIAL SOURCES
SOUGHT-PURPOSE: Burns & McDonnell Engineering Co., as a contractor to
The Air Force seeks to identify responsible potential sources and
obtain information in regards to privatization of utility systems in
accordance with 10 USC 2688, "Utility Systems: Conveyance Authority".
The Commander of Hancock Air National Guard Base is seeking interest
and information specifically for the potential privatization of the
potable water, wastewater, natural gas, and electrical utility systems
at Hancock Air National Guard Base, New York. OBJECTIVE: Should
privatization result, the ownership of Hancock Air National Guard
Base's potable water, wastewater, natural gas, and electrical utility
systems, operation and maintenance and obligation to continue to
provide utility service for an indefinite and ongoing period will
transfer to a utility service provider. All responsibility for
maintaining reliable utility service, including such items as
environmental compliance, maintenance costs, major system renovations,
construction, equipment, manpower and overhead costs will become the
utility service provider's responsibility. It is intended that the
privatization will ultimately reduce the Air Force's life-cycle costs
for operating and maintaining utility systems and services. SYSTEM
DESCRIPTIONS: Hancock ANGB has 73 buildings with 536,707 square feet,
and has 169 acres of real estate which the ANG controls. The utility
systems consist of distribution systems only. The base does not
generate its own electricity or natural gas, and does not have water or
wastewater treatment plants. Additional utility system information is
available electronically (in Microsoft Word 6.0) by submitting an
e-mail request to Camille Mermis (cmermis@burnsmcd.com). PROCEDURES:
This request to interested parties is for gathering information and is
a required component and systematic process to evaluate the interested
parties under the Air Force's utilities privatization program. In order
to minimize costs both to potentially interested parties and the
government, this notice is being issued to determine the interest and
feasibility of proceeding with a formal request for proposals. Should
insufficient credible interest be identified for a privatization
action, it is highly likely that no formal solicitation will be issued.
SHOULD INTEREST BE DETERMINED SUFFICIENT, A FORMAL REQUEST FOR
PROPOSALS MAY BE FORTHCOMING. Small Business interests shall note the
FAR Part 19 Standard Industrial Codes (SIC) and Size Standards for the
utility systems identified in this announcement. Some, all, or any
combination of the following may apply. SIC/SS: 4911/4Million (M)
Megawatt hours, 4922/$5M, 4923/$5M, 4924/500, 4925/$5M, 4931/$5M,
4932/$5M, 4939/$5M, 4941/$5M, 4952/$5M, 4953/$6M, 4959/$5M, 4961/$9M,
4971/$5M. REQUESTED RESPONSE: Interested parties should provide a
statement of interest on company letterhead (not to exceed 20 pages in
length). The statement should include as a minimum the following
criteria: (1) specific utility system(s) of interest and desired
packaging/grouping of utilities to purchase; (2) capability and
experience in ownership, operation and maintenance of similar utility
systems; (3) financial capacity to purchase, expand and operate the
utility systems; (4) statement detailing the legal right to serve, own,
operate, and maintain utility systems within state laws; (5) conceptual
rate plan (excluding numerical analysis or proposed rates), i.e. will
charges for utility service be made from existing rates or from rates
developed specifically for service at the individual base(s); (6) ideas
regarding conjunctive metering and billing for service on base
excluding numerical analysis or proposed rates); (7) discussion of your
conceptual basis (excluding numerical analysis or proposed prices) for
a proposed purchase price (capitalized earnings value, replacement
cost new less depreciation, originalcost less depreciation, or other
(8) statement detailing your understanding of applicable state and
local utility laws and regulations and your compliance capability; (9)
statement detailing your understanding of any existing franchises and
your ability to provide service given these conditions; (10) statement
detailing your understanding of federal, territorial, and local
environmental laws and regulations and familiarity and experience with
environmental compliance procedures and regulations for the (State)
and the U. S. Environmental Protection Agency; and (11) business size
large, small, small-disadvantage, 8(a), women-owned. Elaborate
proposals or pricing information is neither required nor desired. Under
no circumstances will cost data for the existing systems be provided.
Any innovative and new conceptual ideas to achieve the stated objective
are encouraged. If a site visit and the provision of additional data
are later determined necessary, notification will be provided by way of
an amendment to thisannouncement. Elaborate proposals or pricing
information is neither required nor desired. Under no circumstances
will cost data for the existing systems be provided. Any innovative and
new conceptual ideas to achieve the stated objective are encouraged.
Posted 09/22/99 (W-SN383069). (0265) Loren Data Corp. http://www.ld.com (SYN# 0024 19990924\E-0001.SOL)
E - Purchase of Structures and Facilities Index Page
|
|