|
COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 1,1999 PSA#2445Department of the Air Force, Air Mobility Command, HQ AMC/DOY Contract
Airlift, 402 Scott Drive, Unit 3A1, Scott AFB, IL, 62225-5302 V -- INDUSTRY BRIEFING FOR AIRLIFT CONTRACTUAL SUPPORT FOR THE NAVAL
AIR WARFARE CENTER -- WEAPONS DIVISION, POINT MUGU, CA SOL
Reference-Number-101999 POC Richard Santanello, Contracting Officer,
Phone (618) 256-4407, Fax (618) 256-2804, Email
dick.santanello@scott.af.mil -- Richard Santanello, Contracting
Officer, Phone (618) 256-4407, Fax (618) 256-2804, Email WEB: Visit
this URL for the latest information about this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=R&ProjID=Reference-Num
ber-101999&LocID=470. E-MAIL: Richard Santanello,
dick.santanello@scott.af.mil. The Naval Test Wing Pacific, Naval
Weapons Test Squadron Point Mugu, CA, together with the Air Mobility
Command, Scott AFB, IL, plans to hold an Industry Briefing on 19
October 1999, from 0900 -- 1700 at the Naval Air Warfare Center Weapons
Division, Point Mugu, CA. The anticipated procurement will be in
accordnce with Federal Acquisition Regulation (FAR) Part 12 --
Acquisition of Commercial Items. The requirement is for airlift
services (FAR Part 121 and 135) to support the Naval Air Warfare Center
-- Weapons Division (NAWCWPNS), Point Mugu in the movement of
passengers and cargo from the Point Mugu Naval Air Station to the Navy
Outlying Field at San Nicholas Island, CA and return. The anticipated
solicitation will be performance based to meet the following core
requirements: PASSENGER CARRIAGE CAPABILITY Point Mugu -- San Nicholas
Shuttle: The aircraft proposed must be capable of meeting the
following passenger transport requirements: Monday (or first working
day of the week): 130 passengers from Point Mugu to San Nicholas Island
within two hours of the initial scheduled morning departure. Sixty (60)
passengers back from San Nicholas to Point Mugu on Monday after 1300.
Tuesday, Wednesday and Thursday, a total of 60 passengers to San
Nicholas each morning. A total of 60 passengers back to Point Mugu
during each afternoon. Friday (or the last day of the work week) a
total of 60 passengers to San Nicholas during the morning. A total of
130 passengers from San Nicholas within two hours during the afternoon.
The aircraft capcity should be capable of accommodating passengers and
baggage in the amount of 250 lbs. per person (210+40). CARGO CARRIAGE
CAPABILITY: Move 12,000 lbs. of cargo within 3 hours, as required.
Government cargo container size 43"x66"x54", (89 cubic ft.) Container
tare weight = 250 lbs., HazMat capability required. The purpose of the
briefing is to inform prospective contractors of the Government's core
requirements, invite industry participation in defining or improving
the solicitation Statement of Agency Need and to determine if
sufficient competition exists among qualified, capable and interested
contractors. Attendance at the briefing will be limited to three
representatives from each responding company. The briefing will be
unclassified. Please submit names of attendees or request for
information to Stu Hoffman, Contract Specialist, (805) 989-1947,
hoffmanso@navair.navy.mil Naval Air Warfare Center Weapons Division,
Code 220000E, 521 N. 9th Street, Point Mugu, CA 93042-5001 no later
than 8 October 1999. Written and electronic information packages will
be provided for attendees prior to the brief. Posted 09/29/99
(D-SN386180). (0272) Loren Data Corp. http://www.ld.com (SYN# 0086 19991001\V-0002.SOL)
V - Transportation, Travel and Relocation Services Index Page
|
|