COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 12,1999 PSA#2452Officer in Charge of Construction, Naval Facilities Engineering
Command, Contracts Marianas (Guam), PSC 455 Box 175, FPO 96540-2200 Z -- REPLACE WASH WATER TROUGHS AT FENA WATER TREATMENT PLANT
FACILITY, U.S. NAVY PUBLIC WORKS CENTER, GUAM, M.I. SOL
N62766-99-B-2931 POC Laura T. Wilhite, Contract Specialist, (671)
339-4130 or B. Terlaje, Contracting Officer, (671) 339-8387 THIS IS A
PRESOLICITATION NOTICE FOR SOURCES SOUGHT to Replace Wash Water Troughs
at Fena Water Treatment Plant Facility. The work includes: (1) Remove
existing precast concrete was water trough, eight (8) per filter tank
cell, 48 total. (2) Remove existing access ladder, platform grating and
cover plate one each per filter cell, six total. (3) Remove existing
manhole access cover in gullet, one (1) each per filter cell, six
total. (4) Prepare and resurface existing deteriorated filter tank cell
concrete wall surfaces with epoxy coating. (5) Remove and replace
approx. 550 linear feet of existing 4" diameter header piping. (6)
Remove and replace existing rotating agitator assembly, four each. (7)
Remove and replace approx. 200 linear feet of existing 6" diameter
wash piping, control gatae valves, valve extension rod and floor stand
assembly six total. The dates for availability of solicitation and bid
opening date will be announced at a later date. Estimated cost of
construction: $500,000.00 -- $1,000,000.00. SIC 1629. Business Size:
$17.0 Mil. THIS PROJECT IS 100% SET-ASIDE FOR SMALL BUSINESS. Posted
10/07/99 (W-SN390145). (0280) Loren Data Corp. http://www.ld.com (SYN# 0120 19991012\Z-0008.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|