|
COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 19,1999 PSA#2457REQUEST FOR INFORMATION -- MEDICARE MANAGED CARE SYSTEM REDESIGN The
Health Care Financing Administration (HCFA) seeks contractor support to
develop and implement a new Medicare Managed Care System (MMCS) that
meets the MMCS business requirements for beneficiary enrollment and
beneficiary payment functions. This is referred to as Stage 1. The
purpose of this Request for Information is to obtain industry feedback
about potential contract types that are appropriate for this effort
and innovative approaches that may be used to accomplish Stage 1. This
RFI solicits industry comment to help HCFA develop an acquisition
strategy. HCFA will review the information and will incorporate
beneficial suggestions into an RFP for this effort. (NOTE: HCFA intends
to develop Stage 1 only at this time. Stages 2 and 3 are not the focus
of this acquisition effort.) This project is the first stage of an
incremental approach for replacing the current group of Medicare
Managed Care systems that currently utilize COBOL and Model 204
programming languages to process transactions on IBM OS390 hardware.
One of the major operational functions associated with the Medicare
managed care program is enrollment and beneficiary payment calculation
currently supported by the Group Health Plan (GHP) system. The GHP
system, a batch model process of approximately 240K SLOC, is the
crucial component of the legacy MMCS for processing beneficiary
transactions: enrollments and disenrollments, changes in beneficiary
status, and calculation of the capitated amount to be paid to MCOs for
each enrolled beneficiary, as well as any retroactive payment
adjustments resulting from beneficiary status changes. The GHP system
also disseminates reports to the plan providers, notices to the
beneficiaries, and interacts with other systems. HCFA has selected an
approach that is comprised of three major stages:  Stage 1:
Redesign of the current beneficiary enrollment and beneficiary payment
calculation modules -- this is the functionality provided by the
current GHP system. This system will need to interface with the
Automated Plan Payment System (APPS) and with other systems (to include
the Beneficiary Database and Health Plan Management System (formerly
the Plan Information Control System)) that are to be implemented prior
to Stage 1. Stage 1 is expected to begin in April 2000 and be
completed no later than July 2003 (which includes a 6-month parallel
operational testing period).  Stage 2: Redesign of the current
MCO payment module -- this is the functionality provided by the
current APPS system. Stage 2 is expected to be completed no later than
September of 2003. (Stage 2 is not part of this acquisition.) 
Stage 3: Develop a Medicare managed care data warehouse, designed to
better integrate the information available to HCFA (e.g., utilization,
quality of care, payment), thereby providing improved management of
the Medicare managed care program. (Stage 3 is not part of this
acquisition.) The major objectives of MMCS Stage 1 are to: (1) Clearly
understand the MMCS business requirements required for Stage 1
development; (2) Develop a detailed system design which shall: (a)Meet
the set of MMCS business requirements for Stage 1, (b) Allow for a
flexible means of an incremental development of MCO payment, and a data
warehouse in a later stage, (c) Be based on the high-level design from
the MMCS Implementation Recommendation Report dated June 15, 1999, (d)
Support HCFAs IT Architectures guiding principles and
objectives, and be consistent with the ITA constraints and standards;
(3) Create a validation plan, and link test scenarios to the
requirements in HCFAs requirements management software tool
(QSS DOORS); (4) Produce and implement a conversion plan for converting
from the existing GHP system to the new MMCS; (5) Develop the
interfaces with MMCS and the existing legacy systems; (6) Develop a
user training manual and conduct training on MMCS (7) Produce system
documentation regarding MMCS; (8) Conduct parallel operational testing
between the new MMCS and legacy system to verify beneficiary level
payments over a six month period; and (9) Integrate the new MMCS into
the HCFA Data Center environment to support production. The contractor
shall provide the facilities to develop and test the new system prior
to parallel operation at HCFA. This will require use of test data
subject to the restrictions in the Privacy Act. The development
facility and contractor will need to adhere to system security
guidelines, as developed by HCFA. HCFA requires an experienced partner
to perform the software development on this project. HCFA will require
the development contractor to be performing, at a minimum, at a
Software Development Capability Maturity Model level 2 (ref SEI SCE
methodology V.3.0), and will require potential contractors to
demonstrate, through appropriate means, that they are performing at
this level (or higher). HCFA also requires that the partner selected
for this project be experienced in the use of Earned Value Management
techniques on software development projects. HCFA will require that the
development contractor possess, and utilize on this project, an Earned
Value Management System (EVMS) that is compliant with: (1) DoD
5000.2-R, Mandatory Procedures for Major Defense Acquisition Programs
and Major Automated Information Systems Acquisition Programs, (2) NASA
Policy Directive 9501.3, Earned Value Management, or (3)
ANSI/EIA-748-1998, Earned Value Management Systems. HCFA will be
requiring potential contractors to demonstrate how they have applied EV
methods (e.g., report formats and contents, analyses and reporting,
software used, etc.) on similar software development projects. HCFA
intends to use performance-based contracting methods and performance
incentives on this project. HCFA is exploring the possible contracting
options and existing contract vehicles available to accomplish this
effort. HCFA anticipates a Request For Proposal (RFP) release in
November 1999 and a bidders conference in December 1999 with an
anticipated contract award in April 2000. The contract is expected to
contain the following phases: analysis (4/2000 through 8/2000), design
(9/2000 through 8/2001), development (7/2001 through 5/2002),
integration (6/2002 through 12/2002), and parallel operation and
testing (1/2003 through 6/2003) with initial operational capability
beginning 7/2003. HCFA also intends to monitor technical performance by
using technical metrics. Please provide information related to
technical performance metrics that you have used effectively on similar
software development projects. HCFA is currently evaluating software
development methodologies. HCFA is interested in getting comments on
the considerations of using a model-driven development versus a more
traditional structured development approach for this project. If HCFA
were to specify one of these approaches, how would this impact your
proposal? How would this decision impact EV requirements, technical
performance metrics, and performance incentives? How would the design
artifacts be affected? How does the preferred method impact overall
project schedule and cost? The following information is available on
the Internet (http://www.hcfa.gov/stats/mmcsweb): 1) A sample of the
business requirements. 2) The MMCS Implementation Recommendation Report
(dated June 15, 1999). 3) A general overview of HCFAs IT
Architecture policies and procedures. In the RFP, HCFA will provide a
validated set of MMCS business requirements required for Stage 1
development and the detailed documentation on the architecture. What
other information would help you estimate cost and schedule? It is not
HCFA's intent to disclose proprietary information to the public.
Interested parties are invited to submit written information addressing
the following topics: 1) How you have applied EVM methods on similar
software development projects, 2) Suggested contract types and
contracting vehicles (e.g., GWACs), and pricing strategies for the
work, 3) Technical performance metrics suitable for this type of
effort, 4) Considerations concerningthe development methodology, 5) How
the development methodology might impact earned value requirements,
technical performance metrics, and performance incentives, 6) How the
design artifacts are affected by the selected development method, 7)
Impacts of the development method on schedule and cost, and 8) Other
information that would help you estimate cost and schedule. Submit your
written information to HCFA by COB 5 November 1999 to HCFA, ATTN:
Andrew Mummert, 7500 Security Blvd, Mailstop C2-21-15, Baltimore, MD
21244. Comments can also be e-mailed to Andrew Mummert at
amummert@hcfa.gov. WEB: click here to download reference information,
http://www.hcfa.gov/stats/mmcsweb. E-MAIL: click here to contact the
contract specialist via, amummert@hcfa.gov. Posted 10/15/99
(W-SN392067). Loren Data Corp. http://www.ld.com (SYN# 0317 19991019\SP-0005.MSC)
SP - Special Notices Index Page
|
|