|
COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 4,1999 PSA#2469U.S. Department of Labor, ETA, Division of Contracting Services, 200
Constitution Ave., NW, Room S-4203, Washington, DC 20210 C -- ARCHITECTURAL AND ENGINEERING DESIGN SERVICES AT THE PHOENIX JOB
CORPS CENTER LOCATED IN PHOENIX, ARIZONA SOL JC-02-00 DUE 120899 POC
Contact: Ms. Marissa Dela Cerna, (202) 219-8706 WEB: JC-02-00,
http://cbdnet.access.gpo.gov. E-MAIL: JC-02-00, mdelacerna@doleta.gov.
This project involves A/E services for design and construction
administration services for a new Vocational Training/Property Storage
Building at the Phoenix Job Corps Center located in Phoenix, Arizona.
This building shall be a conventionally constructed, two-story
structure of approximately 34,000 gross square feet (GSF). The work
shall include demolition of two one-story, CMU warehouse structures,
each approximately 5,000 GSF, and miscellaneous site improvements such
as general landscaping, installation of utility lines, parking area,
site/security lighting, fire protection and sidewalks. The estimated
cost of construction if $4 million. Required disciplines are:
Architectural, Civil, Structural, Mechanical (HVAC & Plumbing),
Electrical, and Fire Protection. Firms must be capable of producing the
design documents on AUTOCAD release 12 or higher. Specifications shall
be provided in CSA format and "WordPerfect" compatible. Total Design
Time is 28 calendar weeks, including time for submittal review. Firms
that meet the requirements described in this announcement are invited
to submit one copy of a completed SF-255 (Architect-Engineer and
Related Questionnaire for Specific Projects) to include brief resumes
of key personnel expected to have major responsibilities for the
project. One current cop of SF-254 is required for the prime to include
projects related to the type and nature of work for which the firm was
responsible, and one copy of SF-254 for each of its individual
consulting firms, if applicable. The SF 255 and SF 254's are to be
submitted even if they are currently on file. Facsimile copies will not
be accepted. Only firms which submit the forms by the deadline date of
December 8, 1999, will be considered for review of qualifications.
Failure to submit SF 255 and SF 254's will render the submission
unacceptable. Pertinent factors for consideration of qualifications,
listed in order of importance, for the Project Team are: (1)
Qualifications of Assigned Project Personnel, which considers
designcapability, project management skills, and construction
administration capability; (2) Past Performance in terms of cost
control, quality of work, and compliance with performance schedules for
similiar type projects, including past Job Corps Center projects, on
contracts with Government agencies and private industry; (3) Capacity
to Perform Work in the Required Time; (4) Location (preference shall be
given to Project Team located in the general geographical area of the
project, with knowledge of the locality of the project; (5) Specialized
Experience of Assigned Project Personnel; and (6) Energy
Efficiency/Waste Reduction Capabilities. Applicants are required to
include with their submittal a list of three references with names and
telephone numbers of contact persons. The Project Teams considered the
most highly qualified will have references checked. Following the
reference checks, Project Teams still considered the most qualified
will be interviewed. Applicants should include the Solicitation No.
JC-02-00of this CBD Notice with the location/center name in Block No.
1 of the SF 255. Women-owned, Minority-owned and Small-disadvantaged
business concerns are encouraged to submit. This is a 100% Small
Business Set-Aside. The SIC Code is 8712 and the Small Business Size
Standard is $4.0 million. The firm should indicate in Block 10 of the
SF-255 that it is a small business concern as defined in the FAR. THIS
IS NOT A REQUEST FOR PROPOSAL. Posted 11/02/99 (W-SN397155). (0306) Loren Data Corp. http://www.ld.com (SYN# 0032 19991104\C-0007.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|