COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 17,1999 PSA#2477OIC/ROICC Camp Lejeune, NAVFACENGCOM Contracts, 1005 Michael Rd, Camp
Lejeune, NC 28547-2521 C -- INDEFINITEQUANTITY CONTRACTS FOR GENERAL ARCHITECTURAL AND
ENGINEERING DESIGN SERVICES FOR VARIOUS PROJECTS AT MARINE CORPS BASE,
CAMP LEJEUNE, NORTH CAROLINA SOL N62470-00-D-4650/4651 DUE 011200 POC
Jerry T. Williams, (910) 451-5606, FAX (910) 451-5629, E-Mail
williamsjt@lejeune.efdlant.navfac.navy.mil E-MAIL:
williamsjt@lejeune.efdlant.navfac.navy.mil,
williamsjt@lejeune.efdlant.navfac.navy.mil. Solicitation includes,
design and engineering services for preparation of construction
documents including plans, specifications, cost estimates, record
drawings, and review of shop drawings. Projects could include total
renovation of the interior and exterior of existing buildings,
including the evaluation, repair and replacement of the structural,
mechanical, electrical, and communication systems. Projects may
include: Administrative buildings; industrial type facilities,
warehouses, maintenance facilities, communications, training/education;
personnel support type facilities, schools, recreation facilities,
clubs, food services and similar type facilities. Projects could also
include minor new construction of buildings of the same type referenced
above. The new construction and repair/renovation projects will require
the following services; civil site work, extensions to the existing
high voltage electrical distribution system, extensions to the existing
high pressure steam distribution system, extensions to the potable
water distribution system; extensions to the sanitary sewer system, and
additional storm water control systems. The contract scope may require
evaluation and definition of asbestos materials and lead paint
containing materials. The firm must demonstrate qualifications (with
respect to the evaluation factors stated herein) to perform design of
the projects listed above. Firms must be prepared to accept the
aforementioned as a part of their contract responsibility. Two contract
awards will be made from this synopsis; N62470-00-D-4650 and
N62470-00-D-4651. The contract will be of the Firm Fixed Price --
Indefinite Quantity type. The duration of the contract will be for one
(1) year from the date of the initial contract award. The proposed
contract includes one (1) one year Government option for the same basic
professional skills. The total A&E fee that may be paid under this
contract will not exceed $500,000.00. The A-E must demonstrate his and
each key consultant's qualifications with respect to the published
evaluation factors for design and all option services. Evaluation
factors (1) through (6) are of equal importance; factors (7) and (8)
are of lesser importance than factors (1) through (6). Specific
evaluation factors include: (1) Professional qualifications of firm and
staff proposed for the design of total renovation of the interior and
exterior of existing buildings, including the evaluation, repair and
replacement of the structural, mechanical, electrical, and
communication systems. Projects may include: Administrative buildings;
industrial type facilities, warehouses, maintenance facilities,
communications, training/education; personnel support type facilities,
schools, recreation facilities, clubs, food services and similar type
facilities. Projects could also include minor new construction of
buildings of the same type referenced above. The new construction and
repair/renovation projects will require the following services; civil
site work, extensions to the existing high voltage electrical
distribution system, extensions to the existing high pressure steam
distribution system, extensions to the potable water distribution
system; extensions to the sanitary sewer system, and additional storm
water control systems. The contract scope may require evaluation and
definition of asbestos materials and lead paint containing materials.
Firms will be evaluated in terms of the design staff's following
qualifications: (a) active professional registration in the state in
which the design services will be performed; and (b) experience (with
present and other firms) and roles of staff members, specifically on
the projects listed in section 8 of the SF255. Each project should
clearly indicate the personnel involved and those personnel should be
listed by each project. (2) Specialized recent experience demonstrating
the technical competence of particular staff members to design the
projects addressed in evaluation factor number one. Each project listed
should indicate key staff members involved. Firms will also be
evaluated upon: (a) specific knowledge of the construction materials
and practices of Eastern North Carolina; and the Federal and State of
North Carolina laws, regulations, codes, and permits applicable to
projects of this nature; (b) project experience as listed in section 8
of the SF255 (provide design schedule, estimate vs. bid amount, and
design team for each). (3) Capacity of the proposed design team to
accomplish the following schedules: Submission of proposal 15 days
following RFP. Final design submittal within 120 days of contract
award. Project design schedules should be given for the same projects
listed above for evaluation factors 1 and 2. (4) Past performance on
the same projects listed above with Government agencies and private
industry in terms of the following: (a) cost control techniques
employed by the firm as demonstrated by the ability to establish an
accurate project construction budget and design to this budget as
evidenced by the low bid amount; (b) quality of workas demonstrated by
the history of design related change orders issued during
construction; (c) demonstrated long term business relationships and
repeat business with Government and private customers; and (d)
demonstrated compliance with performance schedules. Project information
for this evaluation factor should be for the same projects listed above
for evaluation factors 1 and 2. (5) Specific internal quality control
procedures proposed for projects of this nature. Firm will be evaluated
on the acceptability of their internal quality control program used to
ensure technical accuracy and discipline coordination of plans and
specifications. (6) Knowledge in prescribing the use of recovered
materials and achieving waste reduction and energy efficiency in
facility design. (7) Location in the general geographical area of the
project. (8) The volume of work previously awarded to the firm by the
Department of Defense shall also be considered, with the object of
effecting an equitable distribution of Department of Defense
architect-engineer firms, including small and small disadvantaged
business firms, and firms that have not had Department of Defense
contracts. Architect-Engineer (A-E) firms which meet the requirements
described in this announcement are invited to submit complete, updated
Standard Forms 254, Architect-Engineer and Related Services
Questionnaire, and 255, Architect-Engineer Related Services for
Specific Project, to the office shown above. Those firms that submit
Standard Forms 254 and 255 will only have to submit one copy to be
considered for all three contracts. A-E firms utilized by the prime
must also submit completed Standard Form 254. All SF 254's should be
bound together. Submit one consolidated Standard Form 255 for the
project design team that includes sub-consultants. Do not submit one SF
255 for each sub-consultant. We need only one copy of all forms. In
block 10 of the SF255, discuss why the design team (firm and
sub-consultants) is especially qualified based upon synopsized
evaluation factors and provide evidence that your firm is permitted by
law to practice the professions of architecture or engineering (i.e.
state registration number). Clearly show the office location where work
will be done and the experience of those that will do the work and
their locations. The closing date for this announcement is January 12,
2000. Firms must submit forms to this office by 4:00 p.m. on the
closing date. Late responses will be handled in accordance with FAR
52.215-10. See Note 24. This is not a request for proposal, and there
is no solicitation document or package or plans and specifications to
be issued as a result of this announcement or a planholders'/bidders'
list. Posted 11/15/99 (W-SN400736). (0319) Loren Data Corp. http://www.ld.com (SYN# 0011 19991117\C-0001.SOL)