|
COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 23,1999 PSA#2481CO ENGFLDACT MW, 201 Decatur Avenue, Great Lakes, IL 60088-5600 Y -- DESIGN/BUILD (TWO-PHASE) / WHOLEHOUSE REVITALIZATION, FORRESTAL
VILLAGE -- PHASE 6 (H-1-88-6) & PHASE 8 (CONGRESSIONAL ADD)(H-1-98),
NTC GREAT LAKES, IL SOL N68950-00-R-0209 POC Ms. Lolita L. Batis-McCoy,
Contract Specialist, 847-688-2600 X122 E-MAIL: Contact the Contract
Specialist via e-mail., batisll@pwcgl.navfac.navy.mil. THIS IS A
PRE-SOLICITATION NOTICE AND ISSUED FOR INFORMATION ONLY. DO NOT REQUEST
SOLICITATION DOCUMENTS UNTIL PHASE I RFP IS ISSUED. THE PHASE I RFP CBD
NOTICE WILL HAVE ALL THE NECESSARY INFORMATION FOR REQUESTING THE
DOCUMENTS AND WILL BE ISSUED ON OR ABOUT 12/6/99. APPROXIMATE RELEASE
DATE FOR PHASE I SOLICITATION DOCUMENTS IS ON OR ABOUT 12/22/99. -- The
work shall include design, construction and revitalization of up to 186
housing units and improvements to associated infrastructure in
Forrestal Village, in accordance with sound and efficient construction
practices. The project objective is to upgrade family housing units to
a level comparable to new construction standards. Specific attention
shall be given to energy efficiency, sustainable design, reduced
maintenance, and compatibility with the environment and existing
architectural character of NTC Great Lakes. -- Estimated cost range is
more than $14,000,000. -- This solicitation is being issued on an
UNRESTRICTED basis inviting full and open competition. -- The SIC code
is 1521; size standard is $17.0 million; the FSC Code is Z161. -- The
Government will award a contract resulting from this solicitation to
the responsible proposer whose proposal conforming to the solicitation
will be 'BEST VALUE' to the Government, price and technical factors
considered. This solicitation will consist of TWO (2) PHASES. PHASE I
is pre-qualification and submittals will be evaluated to determine
which offerors may submit proposals for PHASE TWO. Up to five (5) firms
will be pre-qualified to participate in PHASE TWO. The
pre-qualification notice for this project will be posted on or about
12/6/99. Prospective offerors should carefully review the notice. The
pre-qualification notice will inclue evaluation factors and submittal
instructions. Proposers may be evaluated on FACTOR A-Past
Performance/(1) Design and (2) Construction; FACTOR B-Technical
Approach, and FACTOR C-Small Business Subcontracting Effort, and
applies to small/large businesses. The highest rated offerors,
typically 3 to 5 (not to exceed 5), for PHASE I will advance to PHASE
II only, and the Government will then request PHASE II proposals. FIRMS
SUBMITTING TECHNICAL AND PRICE PROPOSALS WILL NOT BE COMPENSATED FOR
SPECIFICATION DOCUMENTS. PHASE II SOLICITATION DOCUMENTS WILL BE ISSUED
AT A LATER DATE. Posted 11/19/99 (W-SN402458). (0323) Loren Data Corp. http://www.ld.com (SYN# 0110 19991123\Y-0009.SOL)
Y - Construction of Structures and Facilities Index Page
|
|