|
COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 1,1999 PSA#2486Commander, Naval Air Systems Command (Code 2.4), 47123 Buse Road,
Building 2272, Patuxent River, MD 20670-1547 C -- TCS LIFECYCLE COST ESTIMATE POC Mary Lee Schuck, Fax:
301-757-5956, Email: schuckml@navair.navy.mil Naval Air Systems Command
intends to issue a sole source procurement to Summit Engineering Group,
Waldorf, MD, under contract N00019-99-M-1097, to continue their
development of the TCS life cycle cost estimate incorporating those
changes required by the program office, as well as, those changes
necessitated by programmatic updates to the Predator, VTUAV, and TUAV
air vehicle programs. Summit Engineering Group has been working on the
initial TCS Program Office Life Cycle Cost Estimate (POE) since
February 1998 and during that time, has developed a cost model for the
TCS program and become an integral member of the TCS life cycle cost
IPT. The life cycle cost model developed by Summit Engineering, forms
the basis of the TCS (POE) and it will be incorporated into the life
cycle costs estimate for milestone II. Over the past twelve months,
Summit Engineering Group has developed the necessary expertise needed
to further develop the TCS life cycle cost model required for the
Program's milestone II decision. Failure to retain Summit engineering
group's expertise during this critical phase of the TCS acquisition
process could seriously jeopardize TCS's ability to reach a favorable
milestone II decision. This synopsis is published for information
purposes only. Responses to this synopsis should be in writing; no
telephone responses will be accepted. Responses mail be mailed:
Commander, Naval Air Systems Command, Attn: M. Schuck, AIR-2.4.2.1.1,
Bldg. 2272, Suite 256, Naval Air Systems Command, 47123 Buse Road, Unit
IPT, Patuxent River, MD 20670-1547. Facsimile number and email address
are shown above. Note 22. Posted 11/29/99 (W-SN404129). (0333) Loren Data Corp. http://www.ld.com (SYN# 0014 19991201\C-0006.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|