COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 3,1999 PSA#2488USDA, Forest Service, Clearwater National Forest, 12730 Highway 12,
Orofino, Idaho 83544 56 -- CULVERTS SOL R1-5-00-4 DUE 122899 POC Contracting, (208)
476-8378 E-MAIL: Clearwater National Forest, 12730 Highway 12,
Orofino,, ddodson/r1_clearwater@fs.fed.us. Supply two culverts to the
Clearwater National Forest, Clearwater County, Idaho. Badger Creek
Culvert: 120" CSP .138 3" x 1" aluminized.type 2 arch pipe -- 142" x
91" x appx. 70' -- with 11 sets of 1/4" x 8" high galvanized
herringbone baffles installed (welded) on 6' centers. Wendover Creek
Culvert: 120" CSP .138 3" x 1" alzd.type 2 arch pipe -- 128" x 83" x
appx. 60' -- with 10 sets of 1/4" x 8" high galvanized herringbone
baffles installed (welded) on 6' centers. Additional materials should
include 12" wide neoprene gaskets, 24" wide .064 aluz. dimple B/C and
welded flanges for watertight, bolted joint connection (including
gaskets and bolting hardware). Posted 12/01/99 (W-SN404957). (0335) Loren Data Corp. http://www.ld.com (SYN# 0173 19991203\56-0001.SOL)