|
COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 3,1999 PSA#2488Federal Bureau of Prisons, Construction Contracting Section, 320 First
Street, NW, Washington, DC 20534 Y -- DESIGN-BUILD CONSTRUCTION OF A FEDERAL CORRECTIONAL INSTITUTION
AND FEDERAL PRISON CAMP TO BE LOCATED NEAR HERLONG, CALIFORNIA SOL RFP
X00-0394 POC Rich Formella, Contracting Officer, Construction
Contracting Section, at (202) 307-0954 This is a Pre-Solicitation
Notice. The Federal Bureau of Prisons (BOP) anticipates award of a
Firm-Fixed Price Design/Build contract for the design and construction
of a Federal Correctional Institution (FCI) and a minimum security
Federal Prison Camp (FPC) to be located near Herlong, California. The
scope of work includes all architectural, engineering, construction,
and other related services necessary to provide the new federal
correctional facility. The proposed medium security FCI and FPC is
currently planned to consist of a group of buildings in a a "campus
plan" arrangement with related site development and site utilities. The
medium security facility will have a gross building area of
approximately 45,000 square meters and be designed to house
approximately 1,200 inmates. The minimum security FPC will have a gross
building area of approximately 6200 square meters and be designed to
house approximately 125 inmates. The Design-Build contract of the
FCI/FPC will provide for issuance of task ordersfor performance and
subject to funding availability. The estimated magnitude of this
project is expected to exceed $10,000,000. The estimated performance
period is 915 calendar days after the Notice to Proceed is issued. For
consideration on this project, the offeror at a minimum must be a firm
or joint venture with experience, individually or as a member of a
team, in successfully and satisfactorily completing a project of
similar size and scope. All responsible sources may submit a proposal
which will be considered. For the design member of the design-build
team, the Architect/Engineer (A/E) firm or the principal or lead A/E
firm of a joint venture must have an existing active office, which will
have responsibility for the plans and specifications, located within
the State of California. The design of the architectural, structural,
mechanical, electrical, civil, or other engineering features of the
project shall be accomplished or reviewed and approved by architects
and engineers registered in the State ofCalifornia to practice in the
particular professional field involved. Participation by architects,
engineers, consultants, and subcontractors located within the State of
California is encouraged. Participation by small, small-disadvantaged,
HUBZone small businesses and small woman-owned businesses is
encouraged. The successful offeror will be required to submit a
subcontracting plan for this procurement regarding the utilization of
small, small-disadvantaged, and small woman-owned businesses. The BOP
will be utilizing two-phase Design-Build selection procedures. This
notice is not a request for proposals. Interested offerors may request
and obtain a Phase One solicitation of the two-phase process. Phase
One solicitations will be issued on or about December 22, 1999. The
Phase One proposal due date will be identified in the Phase One
solicitation. The Phase One solicitation will provide the scope of
work, evaluation factors, and submission information for interested
Design-Build firms to prepare their Phase One qualification proposals.
Phase One proposal participants will submit past performance
information, and technical proposals as defined in the Phase One
solicitation. Phase One qualification proposals will be evaluated to
determine which firms will be selected as offerors for Phase Two. The
evaluation criteria for the Phase One proposals will consist of a
combination of past performance, and technical proposals. The
evaluation criteria for the Phase Two proposals will consist of a
combination of past performance, technical and pricing proposals. Phase
Two proposals participants will submit past performance information,
competitive technical and price proposals as defined in the Phase Two
solicitation. Requests for Phase One solicitations should be MAILED to
Rich Formella, Contracting Officer, at the address and phone numbers
noted below. Point of contact for inquiries and clarifications is Rich
Formella, Contracting Officer, Federal Bureau of Prisons, Construction
Contracting Section, 320 First Street, NW, 500-6, Washington, DC 20534.
(Send Express Mail to 500 First Street, NW, remainder of address
above). The point of contact can be reached at (202) 307-0954 and faxed
at (202) 616-6055. No collect calls will be accepted. No telephone
calls for solicitations will be accepted. Posted 12/01/99 (W-SN404628).
(0335) Loren Data Corp. http://www.ld.com (SYN# 0097 19991203\Y-0006.SOL)
Y - Construction of Structures and Facilities Index Page
|
|