COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 8,1999 PSA#2491ASC/GRA, 2590 Loop Road West, Wright-Patterson AFB OH, 45433 K -- C-5 RELIABILITY ENHANCEMENT AND RE-ENGINING PROGRAM SOL
F3365799R0043 DUE 010300 POC Lt Col Gregg A. Sparks,937-656-9475, DSN
986-9475 WEB: C5RERP-C-5 Reliability Enhancement and Re-engining,
http://www.pixs.wpafb.af.mil/pixslibr/C5RERP/C5RERP.asp. E-MAIL:
sparksga@c17.wpafb.af.mil, sparksga@c17.wpafb.af.mil. Background " The
C-5 RERP Request for Proposal (RFP) will be available on the PIXS
website on or around 5 Jan 00. The PIXS web page address is:
http://www.pixs.wpafb.af.mil/pixslibr/C5RERP/C5RERP.asp CONTACT MS MARY
K. ROUTHIER, CONTRACTING OFFICER, (937) 255-8689 OR MAJOR GEORGE
SARMIENTO, C-5 RERP PROGRAM MANAGER, (937) 255-9292!! The C-5 RERP
Request for Proposal (RFP) will be available in the PIXS website on or
around 3 Dec 99. The PIXS web page address is:
http://www.pixs.wpafb.af.mil/pixslibr/C5RERP/C5RERP.asp. The need for
a modernized, cost-effective, and reliable C- 5 fleet has long been
recognized. The C-5 RERP will significantly contribute to meeting
established war- fighting strategic airlift requirements. Besides the
Propulsion System replacement, improvements in structural integrity and
an improved product support structure constitute a large step towards
increasing fleet availability. Other hardware, operational,
maintenance, and logistics management improvements will be considered
to enhance reliability. The purpose of this Pre-EMD phase is to
identify the most cost effective and operationally efficient solution.
The Operational Requirement Document (ORD), AMC 006-97- I/II/III,
draft Rev#1, identifies all the C-5 RERP threshold/objective parameters
along with the Key Performance Parameters (KPP's). To meet several of
these KPP's the aircraft must be equipped with higher thrust propulsion
system. The contractor shall select a propulsion system for the C-5
that will allow the C-5 to meet the KPP's for Critical Field Length,
Time to Climb and Stage III Noise Compliance per 14 CFR Part 36. As a
minimum the trade study process shall identify a sufficient number of
improvement candidates to ensure all the KPP's are met. Also,
identification of improvement items must continue until all threshold
values have been met, unless there is strong justification of the
unreasonableness of the threshold or it is shown to be cost or
operationally prohibitive. Also, structural integrity improvements must
be identified that are needed to insure the integrity of the airframe
beyond the year 2040. The Government anticipates to award an
Undefinitized Contractual Action (UCA) to Lockheed Martin Aeronautical
Systems (LMAS) on or around 31 Jan 00. The Air Force's (AF's) minimum
needs are only satisfied by one source, LMAS. As a result of a
definition phase, which ended in Sep 99, the C-5 DSO determined that
full and open competition is not a viable alternative. The C-5 DSO also
determined that it would not be cost effective to develop a second
source for this effort. LMAS is the only aircraft manufacturer that has
the existing capability to modernize the C-5 as they own/control the
C-5 source data. Mr. Steve Plaisted has been appointed as Ombudsman to
hear concerns from offerors, or potential offerors, during the
proposal development. The purpose of the Ombudsman is to communicate
contractor concerns, issues, disagreements and recommendations to the
appropriate government personnel. Existence of the Ombudsman does not
diminish the authority of the program director or the Contracting
Officer. Accordingly, the Ombudsman does not participate in the
preparation of solicitations, evaluation of proposals or the source
selection process and therefore, for routine matters on individual
solicitations please contact Ms. Mary K. Routhier, (937) 255-8689. When
requested, the Ombudsman will maintain strict confidentiality as to the
source of concern. Should you desire to contact the Ombudsman, Mr.
Plaisted can be reached at (937) 255-9095. Direct all requests for
solicitations and routine communication concerning this acquisition to
Ms. Mary K. Routhier, Contracting Officer, ASC/GRA, Building 558, 2590
Loop Road West, Wright-Patterson AFB OH 45433-7142, (937) 255-8689, or
e-mail: Mary.Routhier@wpafb.af.mil. Contractor capability response
should be submitted to ASC/GRA no later than 15 days from the date of
this CBD notice. See Note 22. ***** " Posted 12/06/99 (D-SN406037).