|
COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 8,1999 PSA#2491Red River Army Depot, Contracting Directorate, 100 Main Drive,
Texarkana, TX 75507-5000 S -- LANDFILL FOR WASTE GENERATED AT RED RIVER ARMY DEPOT SOL
DAAE32-00-T-0506 DUE 121399 POC Cppt Christopher Greene (903) 334-3337
WEB: http://www.redriver.army.mil/contract.html-ssi,
http://www.redriver.army.mil/contract.html-ssi. E-MAIL:
greeneck@redriver-ex.army.mil, greeneck@redriver-ex.army.mil.
Solicitation number DAAE32-00-T-0506 Request for quotation for use of
a landfill for the disposal of the following (estimated annual
amounts): A. Paper/Cardboard 1200 tons B. Household garbage 19 tons C.
Wood scrap 5 tons D. Non-hazardous containers 3 tons E. Mixed waste
1000 tons (rubber and metal) F. Construction Debris 150 tons G. Fluid
bed waste (sand) 235 tons H. Blast Media 70 tons I. Phosphate Sludge 27
tons J. Sewer Sludge 50 tons K. Boiler Ash 1200 tons Total estimated
annual tonnage 3959 tons The following is a profile analysis approved
by Texas Natural Resources Conservation Commission through August 2003:
Parameters TNRCC limit RRAD actual Cadmium 0.5 mg/l 0.06 mg/l Chromium
5.0 mg/l Below Detection Lead 5.0 mg/l Below Detection TPH 1500 mg/kg
109 mg/kg Benzene 0.5 mg/l Below Detection Landfill accessible
Monday-Friday between 0800-1700 hours. Self-dumping trucks including
roll-off containers, front-load compactors, unitized compactor
containers, conventional dump, rear load luggers,and conventional
housing trucks will deliver to the landfill. No assistance is required
for dumping unless mud at the landfill during inclement weather
requires the trucks to be towed. Plan to award a fixed price contract
to the lowest responsive, responsible bidder for the evaluated price.
The contract- period will run for one year plus three option years.
Execution of the option years are at the sole discretion of the
government. Critical evaluation factor is the cost of hauling from Red
River Army Depot (RRAD) to the landfill. The evaluated price will be
calculated by adding the transportation cost to the total price of the
contract. Hauling costs are $3.00 per mile (one-way only) for an
estimated 100 trips monthly. The total estimated annual tonnage is
3,959 tons. The provision at FAR, 52.212-2 Evaluation-Commercial Items,
applies to this acquisition. Evaluated price = (price per ton * total
estimated annual tonnage) + (transportation costs) Transportation costs
= (one-way distance to landfill * $3.00) * est. 100 trips per month *
12 months Please provide a written quote with the price per ton for
each type of waste above (or one price if it is the same for each type
of waste) and the distance from RRAD to the landfill. The provisions
at FAR 52.212-1, Instructions to Offerors-Commercial Items and FAR
52.212-5, Contract Terms and Conditions Required To Implement Statutes
Or Executives Orders-Commercial Items apply to this acquisition.
Anticipated award date is 17 Dec 1999. Performance shall begin on 1
January 2000. This is a combined synopsis/solicitation for commercial
items prepared in accordance with the format in the FAR, Subpart 12.6,
as supplemented with additional information included in this notice.
This announcement constitutes the only solicitation; bids are being
requested and a written solicitation will not be issued. All
responsible sources may submit a quotation which shall be considered by
the agency. Offerors must include a copy of the provision at FAR
52.212-3, Offeror Representations and Certifications-Commercial Items
with the offer. This solicitation document and incorporated provisions
and clauses are those in effect through Federal Acquisition Circular
97-14. Address any questions or requests pertaining to this synopsis to
CPT Chris Greene, (903) 334-3337, fax X2628, or
greeneck@redriver-ex.army.mil. Posted 12/06/99 (W-SN406081). (0340) Loren Data Corp. http://www.ld.com (SYN# 0071 19991208\S-0001.SOL)
S - Utilities and Housekeeping Services Index Page
|
|