COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 13,1999 PSA#2494J -- REPAIR/REFINISH FURNITURE The 12th Contracting Squadron at
Randolph AFB, TX, intents to award a firm fixed-price Purchase Order
pursuant to Air Force Manual (AFM) 64-302 and The Federal Acquisition
Regulation (FAR), to repair and refinish furniture to match existing
finish in selected VOQ rooms, Randolph AFB, TX. This is a combined
synopsis/solicitation for commercial services prepared in accordance
with the format in FAR Subpart 12.6, as supplemented, with additional
information included in this notice. This announcement constitutes the
only solicitation; quotes are being requested and a written
solicitation will not be issued. This is a Request for Quotation (RFQ),
Solicitation No. F41619-99-Q0908. The solicitation document,
incorporated provisions, and clauses listed in Air Force Form 2210
(will be provided upon request) as well as FAR Clauses 52.222-42
Statement of Equivalent Rates for Federal Hires (May 89) -- Code 23970,
Woodcraft Worker, $13.83 per hour) and 52.237-1 (Site Visit). This
acquisition is unrestricted. Thecontractor shall furnish all labor,
personnel, equipment, supervision and other equipment necessary to
perform and complete the following requirement: 1. SPECIFICATION OF
SERVICE: a. Scope: The Contractor shall provide all personnel,
equipment, tools, materials, supervision and other items and services
necessary to repair and refinish the furniture in 80 VOQ rooms,
Buildings 111 and 121, Randolph Air Force Base (AFB), Texas, in
accordance with this Statement of Work (SOW). The contractor shall
perform to the standards established in this SOW. b. Location: Randolph
AFB, TX. 2. PERSONNEL. a. The Contractor shall provide to the
Contracting Officer and the Contract Monitor the name and phone number
of the person who will be on-call for emergency services. b.
Contractor personnel shall present a neat appearance and be easily
recognized. This may be accomplished by wearing distinctive clothing
bearing the name of the company or by wearing appropriate badges, which
contain the company name and employee name. 3. QUALITY CONTROL. The
contractor shall insure that all work performed under this Statement of
Work meets the quality established in paragraph 9. 4. PHYSICAL
SECURITY. The Contractor shall obtain vehicle passes for each vehicle
used on Randolph AFB during the execution of this contract. The
necessary applications for vehicle passes can be obtained through the
Base Contracting Office and must be signed by the Contracting Officer.
The completed applications are then processed through Security Forces,
Building 1027. All vehicle passes shall be obtained prior to the start
of this contract. 5. HOURS OF OPERATION. a. Normal Hours. The
Contractor shall schedule the work between the hours of 7:30 A.M. and
4:30 P.M. Monday through Friday. b. Recognized Holidays: The Contractor
is not required to schedule work on Federal holidays. 6. CONSERVING OF
UTILITIES. The Contractor shall instruct employees in utilities
conservation practices. The Contractor shall be responsible for
operating under conditions which preclude the wasteof utilities. 7.
GOVERNMENT FURNISHED UTILITIES AND SERVICES. a. The Government shall
provide, without cost to the Contractor, the utilities necessary to
accomplish the tasks specified in paragraph 9. b. The Government shall
provide without cost to the Contractor, Security Forces and Fire
Protection. In the event that Security Forces or Fire Protection is
needed by the Contractor while on Randolph AFB, the Contractor shall
call the following numbers: Security Police 7-5700 Fire Department, 911
8. CONTRACTOR FURNISHED EQUIPMENT, PARTS MATERIALS, AND SERVICES. a.
Except for the utilities or services specifically stated to be
Government furnished in paragraph 7, the Contractor shall furnish
everything required to perform the work described in paragraph 9. b.
All equipment, parts, materials, and services supplied by the
Contractor shall conform to applicable safety and health standards as
established in the Federal Regulations Title 29, Chapter XVII,
Paragraph. 1910, Occupational Safety and Health Act of 1988. 9.
SPECIFIC TASKS. a. PRIOR TO REPAIRING/REFINISHING FURNITURE IN GUEST
ROOMS. Contractor will contact Mr. Tom Goodwin or Ms. Mary Eddy, (210)
652-1844, for assignment of room numbers which will be refinished on
any particular day. b. REPAIRING/REFINISHING FURNITURE SPECIFICATION
DATA. (1) All repair/refinish work will be accomplished within each
individual room of the project in order to minimize movement of
furniture. (2) Each room will be staged for operating by Contractor so
as to protect walls, floors, and contents. (3) All furniture will be
cleaned by Contractor with water-based cleaning solvent to remove dirt,
oxidation, oils, grease, wax, films, and foreign matter. (4) Contractor
will sand all furniture surfaces to appropriate smoothness using a
combination of suitable grades and grits or sandpaper and abrasive pads
in order to remove loose, flaked, cracked or damaged coatings. If
environmental conditions require such, a wet-sanding process will be
employed by Contractor to minimize excessive airborne dust particles.
(5) Contractor will fill all gouges and deep scratches to match
finished color. Heavily damaged, irreparable surfaces will be replaced
utilizing a high pressure, 0.050, satin, finish plastic laminate. (6)
Contractor will repair, smooth and pigment all cigarette burns to
match finished color. (7) Contractor will re-glue all loose joints as
needed. The bonding material utilized must have a block shear strength
of 2800 lbs./inch minimum. (8) Contractor will realign all drawers and
adjust drawer runners as necessary. (9) All hinges, pulls, and other
hardware will be tightened and realigned by Contractor. (10) Contractor
will color-tone, seal and stain all furniture surfaces according to
color specifications, using water-borne products. (11) Contractor will
topcoat all furniture surfaces with high-density, water and alcohol
resistant, water borne lacquers, using high volume compression system
with low pressure output. (12) Contractor will restore each room to
original order and arrangement. (13) Following a walk-through of the
room with Contractor, the Contract Monitor will confirm that all
scheduled items of furniture are in compliance with the quality
specifications. A pre-printed punch list will be supplied by the
Contractor for review and sign-off by the Contract Monitor. (14) Upon
completion of the initial room according to the color and finish
specified by the Government, and upon approval and acceptance of the
completed room by the Contract Monitor, said room will become the
quality standard for the entire scope of the project. All refinished
furniture pieces will comply with this standard of material,
workmanship, color, and lacquer gloss. (15) Contractor will complete a
minimum of ten (10) rooms per eight-hour workday. (16) Each room will
be available for occupancy ten (10) hours after completion of the
refinishing process. (17) All materials used by Contractor must be
water-based or water-borne and must be non-flammable, non-toxic,
non-odorous, and environmentally safe. (18) All materials andprocedures
used by Contractor must conform to all fire code safety procedures as
outlined by N.F.P.A. #0807000 General Safety Orders. (19) Contractor
must warrant all workmanship and finishes from cracking, peeling,
bubbling and any other failure of workmanship or materials for a period
of two years, or industry standard, from the date of completion of
refinishing. Warranty does not include normal wear of finishes in
day-to-day use or extreme abuse on behalf of the user. 10. PERIOD OF
PERFORMANCE. Repairing/refinishing of furniture shall not exceed 30
days. 11. CLEANUP. Upon completion of project, Contractor to return
work site to safe and orderly status for acceptance by the Contract
Monitor. 12. REMOVAL/DISPOSAL All residue will be transported and
disposed of at Contractor's expense. 13. CONTRACTOR MONITOR: Primary:
MS Mary Eddy, (210) 652-1844 ext. 5522. Alternate: Mr.. Jack Hayes,
(210) 652-1844 ext. 2042. The period of performance is 10 January 2000
through 9 February 2000. OFFERORS OR QUOTERS ARE URGEDAND EXPECTED TO
INSPECT THE SITE WHERE SERVICES ARE TO BE PERFORMED AND TO SATISFY
THEMSELVES REGARDING ALL GENERAL AND LOCAL CONDITIONS THAT MAY AFFECT
THE COST OF CONTRACT PERFORMANCE, TO THE EXTENT THAT THE INFORMATION IS
REASONABLY OBTAINABLE. IN NO EVENT SHALL FAILURE TO INSPECT THE SITE
CONSTITUTE GROUNDS FOR A CLAIM AFTER CONTRACT AWARD. OFFERORS ARE
ENCOURAGED TO SUBMIT COMMERCIAL LITERATURE DESCRIBING THEIR OPERATIONS
AND HOW THEY MEET THE PROFESSIONAL REQUIREMENTS OF THIS SOLICITATION.
OFFERORS MUST PROVIDE INFORMATION ON THEIR PAST PERFORMANCE TO INCLUDE
CONTRACT OR ORDER NUMBER, REFERENCES (NAMES AND PHONE NUMBERS).
OFFERORS MUST SUBMIT A TECHNICAL PROPOSAL DESCRIBING PROCEDURES AND
PLANS FOR CONDUCTING THE REPAIR/REFINISH OF THE FURNITURE AND
DEMONSTRATE HOW THEIR PROCEDURES MEETS THE REQUIREMENT OF THE STATEMENT
OF WORK. THE AWARD WILL BE MADE TO THE RESPONSIBLE OFFEROR WHOSE OFFER
CONFORMS TO THIS REQUIREMENT AND IS CONSIDERED TECHNICALLY ACCEPTABLE,
CONSIDERING PRICE AND PAST PERFORMANCE AS FOLLOWS: 1) A DECISION ON THE
TECHNICAL ACCEPTABILITY SHALL BE MADE. ONLY THOSE OFFERORS DETERMINED
TO BE TECHNICALLY ACCEPTABLE WILL BE CONSIDERED FOR AWARD. 2) ALL
TECHNICALLY ACCEPTABLE OFFERORS WILL THEN BE RANKED BY EVALUATED PRICE.
3) FINALLY ALL TECHNICALLY ACCEPTABLE OFFERORS WILL RECEIVE A PAST
PERFORMANCE RISK ASSESSMENT RATING OF EXCEPTIONAL, VERY GOOD,
SATISFACTORY, NEUTRAL, MARGINAL OR UNSATISFACTORY. 4) IF THE LOWEST
PRICED TECHNICALLY ACCEPTABLE OFFER HAS RECEIVED AN EXCEPTIONAL
PERFORMANCE RISK RATING, THAT OFFER REPRESENTS THE BEST VALUE FOR THE
GOVERNMENT. AWARD SHALL BE MADE TO THAT OFFERORS WITHOUT FURTHER
CONSIDERATION OF ANY OFFERS. THE FOLLOWING FACTORS WILL BE USED TO
EVALUATE QUOTES: (1) PRICE (2) ABILITY TO PERFORM AND (3) PAST
PERFORMANCE. THE GOVERNMENT RESERVES THE RIGHT TO AWARD A PURCHASE
ORDER TO OTHER THAN THE LOWEST PRICED OFFER IF THAT OFFERORS IS JUDGED
TO HAVE A PERFORMANCE RISK RATING OF VERY GOOD OR LOWER. IN THAT
EVENT, THE CONTRACTING OFFICER SHALL MAKE AN INTEGRATED ASSESSMENT BEST
VALUE AWARD DECISION. ALL RESPONSES RECEIVED BY THE DUE DATE WILL BE
CONSIDERED. OFFER MUST BE SENT TO THE CONTRACT ADMINISTRATOR LISTED
ABOVE NOT LATER THAN 4 JANUARY 2000 AND SHOULD REFERENCE THE
SOLICITATION LISTED. Award will be made on or about 10 January 2000.
This is a non-appropriated fund purchase and it does not obligate
appropriated funds of the United States Government. Non-appropriated
funds are generated by he military community through the sale of goods
and services and the collection of fees and charges for participation
in military community programs. This purchase does not involve federal
tax dollars. The following is a list of the furniture requiring
repair/refinish: ITEM AND QUANTITIES ARE AS FOLLOWS: Night Stands: 160
each, Desks: 80 each, Headboards: 80 each, Two Drawer Dresser: 80
each, Desk Chairs: 80 each, Bar Stools: 160 each, Kitchen Cabinets: 160
each, Mirror Frames: 80 each. NOTE: CONTRACTORS ARE REQUIRED TO SUBMIT
THEIR OFFERS BASED ON EACH INDIVIDUAL ITEM LISTED, TOTAL OF EACH LINE
ITEM AND THE GRAND TOTAL FOR ALL LINE ITEMS. WEB: Visit this URL for
the latest information about this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=S&ProjID=F41691-99Q090
8&LocID=464. E-MAIL: Ernesto Cruz, ernesto.cruz@randolph.af.mil. Posted
12/09/99 (D-SN407347). Loren Data Corp. http://www.ld.com (SYN# 0474 19991213\SP-0025.MSC)
SP - Special Notices Index Page
|
|