Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 20,1999 PSA#2499

Bureau of Reclamation, PO Box 1017, Bismark, ND 58502-1017

Z -- LAKE AUDUBON ISLAND STABILIZATION, ISLAND REPAIR PROJECT, MCLEAN COUNTY SOL 00SQ620023 DUE 011800 POC Elaine Felchle, Contracting Officer, 701-250-4242, X3306 E-MAIL: Contracting Officer, Bureau of Reclamation, Bismarck,, efelchle@gp.usbr.gov. Principal components of the work: (a) delivery of all construction materials and equipment across the frozen water surface of Lake Audubon to the construction sites on islands 8, 9, 10, 34, 38, 39, 41, 42, 43, 49, 50, 51, 52, 55, and 56; (b) construction of approximately 510 linear feet of dumped riprap revetment at 3 locations and filling 9 empty concrete culvert bulkhead section with 6-12" rock on island 8; (c) construction of 100 linear feet of dumped riprap revetment at the SW corner of island 9; (d) construction 150 linear feet of dumped riprap revetment, 140 linear feet of riprap windrow, and filling 7 breakwater gaps with riprap on island 10; (e) construction of 130 linear feet of dumped riprap revetment on island 34; (f) construction of 150 linear feet of dumped riprap revetment, 240 linear feet of riprap windrow, and filling 5 breakwater gaps with riprap on island 38; (g) construction of 280 linear feet of dumped riprap revetyment on island 39; (h) construction of 530 linear feet of riprap windrow on island 41; (i) construction of 100 linear feet of riprap windrow on island 42; (j) construction of 175 linear feet of riprap windrow on island 43; (k) construction of 90 linear feet of riprap windrow on island 49; (l) construction of 250 linear feet of riprap windrow on island 50; (m) construction of 100 linear feet of riprap windrow on island 51; (n) construction of 100 linear feet of riprap windrow and placing riprap at low area of existing windrow on island 52; (o) construction of 170 linear feet of riprap windrow on island 55; and (p) construction of 75 linear feet of riprap windrow on island 56. Work shall be completed by March 15, 2000. Road maintenance, if required, shall be completed by June 1, 2000. Request copy of RFQ from contact point identified in item 11 above. Estimated award 1/20/00. Posted 12/16/99 (W-SN409346). (0350)

Loren Data Corp. http://www.ld.com (SYN# 0117 19991220\Z-0003.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page