COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 28,1999 PSA#2504URS Greiner Woodward Clyde, Stanford Place 3, Suite 1000, 4582 South
Ulster Street, Denver, CO 80237 F -- ENVIRONMENTAL REMEDIATION IN UTAH SOL GM0206 POC No telephone
inquiries will be accepted until publication of the CBD Solicitation
PRESOLICITATION NOTICE, NO RESPONSE ALLOWED. Announcement has also been
submitted under Classification Code C, Architect and Engineering
Services (Construction). Utah Department of Environmental Quality will
enter into a contract for construction services to excavate, remove,
and dispose of lead- and arsenic-contaminated soil on residential and
commercial properties and municipal right-of-way in a residential area
in Utah. The soil in the area has been previously characterized for
lead and arsenic concentration. Excavated soil meeting Federal Land
Disposal Restrictions will be disposed of in a permitted, Subtitle D
(Utah Class IV or V) landfill. Excavated soil from four properties will
be disposed of in a permitted Subtitle C hazardous waste landfill. The
selected Contractor will provide staff or licensed, approved
subcontractors for all construction services, including, but not
limited to, debris and fence removal, clearing, grubbing, excavating,
loading, hauling, backfilling, compacting, and soddingor seeding each
contaminated property. In addition, the selected Contractor will
contract with each landfill for soil and debris disposal; obtain
approved, clean backfill and topsoil; remove, repair, or replace
concrete flatwork; form concrete walls and floors or shotcrete hand-dug
basements; replace sheds, fences, retaining walls, septic tank
leachfields, and any other damaged or demolished exterior structure or
utility line; excavate and backfill unpaved alley and street
right-of-way with compacted roadbase; repair all construction-damaged
asphalt paving on existing paved streets; plant trees and shrubs; and,
after all construction is complete, clean the interior and exterior of
each residential structure. Single-step, lump-sum bids will be accepted
from qualified bidders possessing a valid General Contractor's License
in the State of Utah by the date of Bid submittal. BOD 55 days after
published CBD Solicitation for Bids (currently scheduled for 01/03/00).
Contract Award NLT 70 days after publication of CBD Solicitation for
Bids. Selected Contractor will complete all construction and
relandscaping in one construction season. Federal Davis-Bacon wage
rates apply. All on-site personnel and subcontractors will be
OSHA-certified under 29 CFR 1910 and 1926. The selected Contractor will
be expected to have full-time Health and Safety and Community Relations
personnel on site during all remedial activities. A complete set of
Design Specifications and Design Drawings will be available after
publication of the CBD Solicitation for Bids. These will be provided in
both printed form and on a read-only CD for a one-time fee of $100. The
Design Drawings in printed format will be available only on half-size
(11 inches by 17 inches) sheets and the Design Drawings in CD format
will be available only in AutoCad Release 14. The CD-ROM will not be
available separately. Posted 12/23/99 (W-SN411247). (0357) Loren Data Corp. http://www.ld.com (SYN# 0022 19991228\F-0007.SOL)
F - Natural Resources and Conservation Services Index Page
|
|