COMMERCE BUSINESS DAILY ISSUE OF JANUARY 5,2000 PSA#2509U.S. Information Agency, International Broadcasting Bureau, Contracts
and Procurement Division, B/PA/AC, Room 2517, 330 C St, SW, Washington,
DC 20547 Z -- UPGRADE OF ELECTRICAL POWER DISTRIBUTION SYSTEM AT IBB'S SPAIN
TRANSMITTING STATION SOL 10710-11007 POC Contact Point: Gary Hosford,
Contracting Officer; Office of Contracts (CON); Telephone: (202)
619-2946; Facsimile: (202) 260-0855 The International Broadcasting
Bureau (IBB) has a requirement to refurbish and upgrade the electrical
distribution system at its Spain Transmitting Station (STS), located
at Platja de Pals, within the autonomous region of Catalunya, province
of Girona, Spain; using Government Furnished Equipment/Material
(GFE/GFM) for the below-listed major equipment items. The proposed work
consists of upgrading STS' existing 2.4 kV electrical distribution
system to 4.16 kV in order to provide electric power to six-each,
short-wave 250 kW broadcast transmitters to be installed or modified at
STS. The upgraded electrical distribution system will include such
major equipment items as two-each, 25 kV -- 4.16 kV main power
transformers; 4.16 kV metal-clad switchgear; 25 kV metal-enclosed load
interrupter switchgear; two-each, 25 kV -- 380 V auxiliary
transformers; 4.16 kV feeders connecting to the six-each, 250 kW
transmitters; and several underground distribution cables. The STS is
an active high frequency radio transmission station, which requires
that the Contractor perform its work without interfering with the
Station's daily broadcast schedule. The estimated price of this work is
between $25,000 and $100,000. The performance period for this work is
completion within four (4) months from issuance of the
Notice-to-Proceed. All work shall be coordinated with the local utility
company, ENHER, to ensure compliance with national (Spain and U.S.),
regional (Catalunya), and provincial (Girona) design and construction
laws, rules, codes, and/or regulations. All documentation required by
the contract (e.g., test plans, technical manuals, "as-built" drawings,
etc.) shall be written in the Spanish, Catalan, and English languages.
As required by the U.S. Federal Acquisition Regulation (FAR) Subpart
13.106 (Soliciting Competition, Evaluation of Quotations or Offers,
Award and Documentation); Offerors are herein notified that award will
be made on the basis of price and other factors, with price being the
significantly predominant factor. To be considered for this work,
interested companies/firms shall: (a) have demonstrated experience in
the installation of high voltage electrical power distribution systems
at overseas (preferably Spain) locations; (b) be fully qualified,
properly licensed, and duly certified to perform this specific high
voltage electrical installation, testing, and related services work for
the STS site located in the Catalunya region of Girona province, Spain,
in full accordance with the above-stated applicable U.S. and Spanish
design and construction codes and standards; (c) possess the capacity
to accomplish the work in the required time (i.e., not later than four
(4) months from issuance of the Notice-to-Proceed; and (d) provide
verifiable past experience in successfully obtaining all the necessary
written approvals, certifications, and/or licenses for electrical
utility system designs that are fully compliant with all national
(Spain and U.S.), regional (Catalunya), and provincial (Girona) laws,
rules, codes,and/or regulations applicable in the above-stated Spanish
locality of this project. U.S. firms are herein notified that the IBB
expects to receive offers from local electrical construction firms
(i.e., Catalunya region of Girona province, Spain). The IBB intends to
issue a solicitation document (RFP) for this negotiated
firm-fixed-price procurement in February 2000, with a proposal response
date of 30 calendar days after the RFP issuance. All Offerors are
strongly encouraged to visit the STS location, at their 100% own
expense, to verify the existing local electrical system and other site
conditions. STS facilities will be made available for pre-proposal
site visits by interested Offerors, and these site-visit dates will be
stated in the forthcoming Solicitation (RFP) document. The RFP
document will contain the IBB-approved "Final Design", to include, but
not be limited to, the Technical Specifications, Engineering Analyses,
set of Construction Drawings, and estimated Construction Schedule.
Negotiation and award of a firm-fixed-price construction contract
resulting from the forthcoming RFP is presently planned to be
accomplished at the STS. Qualified Offerors desiring to submit a
proposal should request a copy of the RFP by submitting a written
request to the above-listed address. All responsible sources may submit
a proposal in response to the forthcoming solicitation document, and
all proposals will be considered by the IBB. This is not a RFP.*****
Posted 01/03/00 (W-SN412453). (0003) Loren Data Corp. http://www.ld.com (SYN# 0086 20000105\Z-0002.SOL)