|
COMMERCE BUSINESS DAILY ISSUE OF JANUARY 11,2000 PSA#2513U.S. Army Corps of Engineers, Philadelphia Wanamaker Building, Room
643, 100 Penn Square East, Philadelphia, Pennsylvania 19107 29 -- OVERHAUL AND REBUILD ALCO WIDE CAM FUEL PUMP SOL
DACW61-00-B-0009 DUE 021000 POC Gwendolyn V. McBride, (215) 656-6917 or
Ernest Savoy, (215) 656-6913 This is a combined synopsis/solicitation
for commercial items prepared in accordance with the format in FAR
Subpart 12.6, as supplemented with additional information included in
this notice. This announcement constitutes the only solicitation;
proposals are being requested and a written solicitation will not be
issued. This solicitation is being issued as an Invitation for Bid
(IFB). The incorporated provisions and clauses for this solicitation
are those in effect through Federal Acquisition Circular (FAC) Number
97-14. This acquisition is NOT set-aside and is open to all interested
parties. The Standard Industrial Classification (SIC)Code for this
project is 3731 with a small business size standard of 1000 people.
REQUIREMENTS: The U.S. Army Corps of Engineers, Philadelphia District,
intends to award a firm, fixed priced contract from Solicitation
Number DACW61-00-B-0009 to acquire all the necessary labor, parts,
materials and services required to overhaul and rebuild 36 total units
of ALCO Diesel Engine wide cam fuel pump support assemblies with
crosshead lifters as specified herein to include packaging and
markings. The complete work is to be delivered to Fort Mifflin
Distribution Center, U.S. Army Reservation, Fort Mifflin, Philadelphia,
Pennsylvania 19153. All responses must include a physical address,
telephone number, fax number, DUNS number, cage code, tax
identification code, point of contact and size of business. INTENT: It
is the intent of this request to have 36 wide cam style fuel pump
support assemblies with cross heads, cleaned, examined, repaired and
reassembled using new genuine FM/ALCO parts. All units shall be made
ready for immediate installation, and be packaged and marked as
specified herein. Contractor shall be responsible for all pick up and
delivery charges. SCOPE: The Corps of Engineers shall provide to the
successful contractor, 36 ALCO style wide cam fuel pump support
castings, which have been previously disassembled to the basic casting.
Upon receipt of the castings the contractor shall thoroughly clean the
units either by sand or water blasting, or dipping in a solvent
solution. If sand blasting is chosen then the castings shall be flushed
with a solution to remove all sand residue. The casting shall be
checked for cracks, breaks, defects and wear. Any casting not meeting
the criteria for re-buildability shall be identified, marked, tagged
and set aside. The government shall be furnished a written report
explaining what problems exists and why the units cannot be rebuilt. At
this time the government may choose to send additional units to the
contractor, at no additional cost to the contractor. Once the casting
have been cleaned and examined the contractor shall prepare the
castings for refurbishing in accordance with FM/ALCO requirements and
specifications. The contractor shall provide and install all new
genuine OEM ALCO parts, as specified. Aftermarket parts such as Preco
are not acceptable. The contractor must verify in writing to the
government before commencing any work, thatall parts, except for
hardware items, used in the repairs shall be genuine ALCO. The final
product to be furnished the government shall be FM/ALCO P/N 23202410,
to include the perimeter gasket which is to be tied to each finished
casting. All finished castings shall be set up for immediate
installation. It is the desire of the government to have at a minimum
the following parts installed on the finished castings, and as detailed
in DRP 14429E. The government is furnishing the parts numbers available
at this time, for the parts required. It is the contractors
responsibility to adjust or correct any superceded or misprinted part
numbers using the most current DRP 14429E publication available as a
reference. The contractor shall furnish all parts required to complete
the assemblies, and the parts may not be limited to just those listed
below, to furnish a complete unit under part number 2320410 "Fuel Pump
Support w/crossheads and lifters". P/N 2321564-1 Adjusting Screw 36
total; P/N 2322532 Adjusting Screw Seat36 total; P/N 2241281-1 Snap
Ring 36 total; P/N 2153271 Nut Special Adj. Screw 36 total; P/N 4321041
F.P. Crosshead Cam Roller 36 total; P/N 4320012-1 F.P. Crosshead Lifter
36 total; P/N 4321-51 Cam Roller Bushing 36 total; P/N 4321061 Cam
Roller Pin 36 total; P/N 2322671-1 Locking Plate for Cam Roller Pin 36
total; P/N 21549617 Capscrew Locking Plate 72 total; P/N 2157001
Lockwire 36 total (approx.); P/N 2321598 Floating Bushing Wide 36
total; P/N 4321063 Fulcrum Pin for F.P. Lifter 36 total; P/N 2322672
Locking Plate 36 total; P/N 21549613 Capscrew Locking Plate 72 total;
P/N 2151491-1 Washer 3/8 inch 72 total; P/N 23202820-1 Air & Exhaust
Pushrod Lifter 72 total; P/N 22414-91 Bushing in Lifter 72 total; P/N
2241261 Pushrod Lifter Seat 72 total; P/N 2241342 Cam Roller 72 total;
P/N 23202819 Cam Roller Pin 72 total; P/N 2241032 Retaining Ring for
Cam Roller Pin 154 total; P.N 241354-1 Fulcrum Pin F/Pushrod Lifter 36
total; P/S 21528312 Taper Dowel 36 total; P/N 2241501 Spacer f/Pushrod
Lifter 36 total; Gasket for Support Casting Mounting 36 total. All
hardware not listed, such as cotter pins, grease fitting cap screws,
washers and etc., as applicable. All components and parts shall be
assembled to the castings. All adjustments spacing, and clearances
shall be in accordance with FM/ALCO requirements. All loose parts that
cannot be permanently affixed, being needed at time of installation at
time of assembly to other major engine components shall be tied, taped,
or put into packages and attached to the castings. Upon completion of
the assembled unit a separate quality assurance person shall check and
verity that all adjustments and clearance have been accomplished and
shall be certified. Each assembled unit shall be marked as been checked
and certified and shall be followed up by written certification for all
units. Once all adjustments and verifications have been completed each
unit shall be given a protective coating of a light lubricant then
wrapped in either moisture proof or barrier type paper or wrapping.
PACKAGING: The contractor shall, upon completion of all wrapping, pack
the assemblies into heavy-duty solidly enclosed wooden crates. Crates
can either contain six (6) or twelve (12) units per crate. Wooden
spacers and dividers shall section off the various layers or levels for
the finished and wrapped castings, if the contractor chooses to use a
multi-level stacking within the crate. It is critical that the finished
casting does not ride directly on top or rub the other castings while
in transit. The wooden crates shall be constructed of inch exterior
grade plywood, with nominal two-inch thick material for
chocking-blocking-supporting. The nominal 4-inch x 4-inch material for
skids or runners. Lids shall be secured with wood screws or lag bolts,
to allow periodic inspection and reuse. The government will furnish the
contractor well built heavy-duty crates for the majority of the
assemblies being provided for repairs. If suitable and adaptable, the
contractor may utilize these crates for the finished product provided
that the requirement modifications are completed to provide the
government it's desired finished package. MARKINGS: Each crate shall be
stenciled in at least 1-inch lettering and numbers with the following
information, and shall be stenciled on the lid and two long sides of
the crates. Spares Designation Number (which is) MD-09-05-20; Alco Part
Number for Finished Assembly (should be) 23202410; Contract Number
(DACW61-00-C-____); Nomenclature (example: Alco Fuel Pump Support
Casting Wide Cam Complete; Quantity and Gross Weight of Each Package
(To be determined by contractor and specifications). All contractors
are advised that the following clauses/provisions applies to this
acquisition: 52.212-1, Instructions to Offerors Commercial 52.212-3,
Offeror Representations, and Certifications Commercial Items; 52.212-4
Contract Terms and Conditions Commercial Items and 52.212-5, Contract
Terms and Conditions Required to Implement Statues or Executive Orders
Commercial Items. Contractors are also advised that you must be
registered in the Central Contractor Registration Database as outlined
in 252.204-7004, in order to be eligible to receive an award. Offerors
and contractors may obtain information on registration and annual
confirmation requirements by calling 1-888-227-2423, or via the
Internet at http://www.ccr2000.com. The government intends to award a
contract resulting from this solicitation to the lowest responsible,
responsive offeror whose offer conforms to the specifications and
delivery and is in the best interest of the government. DELIVERY: The
completed work is to be delivered to Fort Mifflin Distribution Center,
U.S. Army Reservation, Fort Mifflin, Philadelphia, Pennsylvania 19153.
Bid opening for this acquisition will take place on 10 February 2000 at
2:15 p.m. Bids are to be received by Gwendolyn V. McBride or Ernest
Savoy at the Corps of Engineers, Wanamaker Building -- Room No. 643,
100 Penn Square East, Philadelphia, Pennsylvania 19107. All questions
are to be directed to the attention of Mrs. McBride at (215) 656-6917
or Mr. Savoy at (215) 656-6913. Award of the contract will be made as
a whole to one bidder. Affirmative action to ensure equal employment
opportunity is applicable to the resulting contract. This is an
unrestricted acquisition. Posted 01/07/00 (W-SN414185). (0007) Loren Data Corp. http://www.ld.com (SYN# 0175 20000111\29-0004.SOL)
29 - Engine Accessories Index Page
|
|