|
COMMERCE BUSINESS DAILY ISSUE OF JANUARY 12,2000 PSA#2514USAED, Sacramento, Corps of Engineers, Contracting Division, 1325 J
Street, Sacramento, CA 95814-2922 Z -- AMERICAN RIVER WATERSHED PROJECT(COMMON FEATURES), CALIFORNIA
LEFT (SOUTH) BANK LEVEE STRENGTHENING -- CONTRACT 1, AMERICAN RIVER,
CALIFORNIA SOL DACW05-00-R-0004 DUE 012500 POC Contract Specialist:
Linda Hales (916)557-5156 This is an amendment. Please see
Subcontracting goals. PROJECT TITLE: American River Watershed Project
(Common Features), California Left (South) Bank Levee Strengthening --
Contract 1, American River, California. This proposed contract is
Unrestricted. JOB DESCRIPTION: The project consists of all necessary
construction and relocations related to the installation of 7,900
meters of impervious cutoff wall along the South Bank Levee of the
lower American River from H Street to 4,000 meters upstream of Watt
Avenue in the City and County of Sacramento. The design requires
installation of a soil-cement-bentonite slurry cutoff wall with a
maximum depth of 21 meters and a minimum width of 0.61 meters. The type
of utility relocations include drain pipes, sewer and water lines. SIC
CODE: This procurement will be conducted under SIC code:1629. The size
standard for this SIC code is: $17,000,000.00. REQUEST FOR PROPOSAL:
The acquisition method is negotiated procurement. A technical andcost
proposal will be required. Evaluation by the Government will result in
selection of firm that represents the best value to the Government.
Large businesses competing for this project must comply with the FAR
52.219-9 clause regarding the requirement for a subcontracting plan on
the part of the work it intends to subcontract. The recommended goals
for subcontracting are 61.2% for small business, 9.1% for small
disadvantaged business, and 5% for small business/woman-owned. A firm
that submits a plan with lesser goals must submit written rationale to
support goals submitted. Estimated cost is between $5,000,000.00 and
$10,000,000.00. For more information on the solicitation please contact
the Contract Specialist, Linda Hales at (916)557-5156. ORDERING PLANS
AND SPECIFICATIONS: (AVAILABLE ON CD ROM; NO CHARGE) Plans and
specifications for this project must be ordered by the CUT OFF DATE of
11/19/99 to ensure receipt of bid sets (FREE OF CHARGE). Plans and
Specifications can only be ordered electronically by accessing internet
address http://ebs.spk.usace.army.mil/ Please complete the requested
information to avoid a delay in your order. Orders received beyound the
CUT OFF DATE of 11/19/99 will not be honored. Plans and specifications
will be mailed out on or about 12/1/99. Because a limited number of
sets will be reproduced, copies are limited to one set per firm.
Payment by company check, certified check or money order made payable
to the Finance and Accounting Officer, USAED, Sacramento. Requests must
be submitted along with payment by mail, or in person to USAED,
Sacramento, ATTN: Plan Room, 1325 J Street, Sacramento, CA 95814-2922.
Do not address to the contract specialist for this will delay your
order. Firms are requested to provide their: name; physical address;
mailing address; E-mail address; telephone number; facsimile number;
and the solicitation number of the project. All responsible sources may
submit a bid or proposal which will be considered by the agency. See
Note 26 (See Commerce Business Daily, Monday Edition) For a listing of
all Sacramento District projects, see Contracting Division's Internet
Home Page at http://ebs.spk.usace.army.mil/ which is updated daily.
Please note that all contractors and potential contractors must be
registered with the Central Contractor Registration (CCR) database
effective May 31,1998. For instructions on registering with the CCR
please see our webpage. Posted 01/10/00 (W-SN414494). (0010) Loren Data Corp. http://www.ld.com (SYN# 0109 20000112\Z-0013.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|