COMMERCE BUSINESS DAILY ISSUE OF JANUARY 19,2000 PSA#2518Department of the Army, Baltimore District, Corps of Engineer, 10 South
Howard Street, Room 7000, Baltimore, MD 21201-1715 Z -- BOILER REPLACEMENT H.D. COOKE ELEMENTARY SCHOOL, KETCHAM
ELEMENTARY SCHOOL, AND SLOWE ELEMENTARY SCHOOL, DISTRICT OF COLUMBIA
PUBLIC SCHOOLS, WASHINGTON, DC SOL DACW31-00-R-0017 DUE 030200 POC
Betty Schneider, Esther Foster or Tom Milligan, (410)962-5638 or 3464
This proposed Design-Build procurement is unrestricted, SIC 1711, $7.0
million. Estimated cost of construction is between $1,000,000.00 and
$5,000,000.00. Work consists of work related to installation of steam
central heating plant at H.D. Cook Elementary School, Ketcham
Elementary School, and Slowe Elementary School. Asbestos abatement, and
lead paint abatement work may be required within the boiler room at the
schools. Demolition and installation work is associated with the
requirement to all piping and accessories relating to the boiler plant
operation. New DDC based boiler/burner management controls will be
installed for all new boilers. Construction substantial completion will
be 120 days from receipt of the Notice to Proceed. Heat, either from
the installed boilers or from temporary means shall be available for
the entire school starting 15 October 2000 and continuing until 15
April 2001. Lead abatement and asbestos abatement work is required to
be completed in accordance with the NESHAP report. Significant major
project features of this work include but are not limited to: a) In
general terms, investigating the current functionality of the heating
system to determine how to make the system functional, safe, and energy
efficient; b) Recommending the most timely and effective approach to
achieve full system functionality and safe and efficient operation; c)
Investigating and providing for the demolition of all mechanical
equipment that must be removed to accomplish the work. Demolition is
expected to be required for all equipment within the boiler room and
all steam, condensate and hot water piping within the boiler room; d)
Removal of all debris; e) Replacing all existing equipment within the
boiler room and replacement of all steam condensate, and hot water
piping within the boiler room is expected to be necessary to provide
full functionality. Debt Collection Improvement Act of 1996, effective
March 31, 1998 all contractors must be registered in the Central
Contractor Registration (CCR) to be considered for award of a Federal
contract. Contact CCR Web site at http: //www.acq.osd.mil/ec.
Registration can also be accomplished via dial up modem at 614-692-6788
(User ID: ccrpub; Password: pub2ccri), or through any DOD Certified
Value Added Network. Additionally, a paper form for registration may be
obtained from the DoD Electronic Commerce Information Center at
1-800-334-3414. All responsible sources may submit a proposal which
shall be considered by the agency. Competitive proposals will be
evaluated on the evaluation criteria as set forth in the solicitation
package. The evaluation criteria may consists of the following factors:
Prime Contractors Experience/Past and present; A/E Qualifications --
SF254/255; Technical Approach (a) Schedule (b) QC and Safety (c) Key
Personnel (Design and Construction). Large Business firms are required
to submit a Subcontracting Plan with their proposal. The
Subcontracting goals are 65% for small business, 15% for small
disadvantage business, and 8% for women-owned business. Specifications
are $10.44 each Non-Refundable. WE DO NOT ACCEPT PERSONAL CHECKS, ONLY
COMPANY CHECKS OR MONEY ORDERS. Make check or money order payable to
USAED Baltimore and mail to the attention of CENAB-CT-O (Business
Support Team). No cash accepted. Issuance o/a 01 February 2000;
proposal due date 02 March 2000 Posted 01/14/00 (W-SN416292). (0014) Loren Data Corp. http://www.ld.com (SYN# 0126 20000119\Z-0001.SOL)