COMMERCE BUSINESS DAILY ISSUE OF JANUARY 19,2000 PSA#2518Department of the Army, Baltimore District, Corps of Engineer, 10 South
Howard Street, Room 7000, Baltimore, MD 21201-1715 Z -- BOILER REPLACEMENT C.W. HARRIS ELEMENTARY SCHOOL, MALCOLM
ELEMENTARY SCHOOL, AND SAVOY ELEMENTARY, DISTRICT OF COLUMBIA PUBLIC
SCHOOL, DISTRICT OF COLUMBIA PUBLIC SCHOOLS, WASHINGTON, DC SOL
DACW31-00-R-0016 DUE 030200 POC Betty Schneider, Esther Foster, Tom
Milligan (410)962-5638 or 3464 This proposed Design-Build procurement
is unrestricted, SIC 1711, $7.0 million. Estimated cost of construction
is between $1,000,000.00 and $5,000,000.00. Work consists of work
related to installation of steam central heating plant at C.W. Harris
Elementary School, Malcolm Elementary School, and Savoy Elementary
School. Asbestos abatement, and lead paint abatement work may be
required within the boiler room at the schools. Demolition and
installation work is associated with the requirement to all piping and
accessories relating to the boiler plant operation. New DDC based
boiler/burner management controls will be installed for all new
boilers. Construction substantial completion will be 120 days from
receipt of the Notice to Proceed. Heat, either from the installed
boilers or from temporary means shall be available for the entire
school starting 15 October 2000 and continuing until 15 April 2001.
Lead abatement and asbestos abatement work is required to be completed
in accordance with the NESHAP report. Significant major project
features of this work include but are not limited to: a) In general
terms, investigating the current functionality of the heating system to
determine how to make the system functional, safe, and energy
efficient; b) Recommending the most timely and effective approach to
achieve full system functionality and safe and efficient operation; c)
Investigating and providing for the demolition of all mechanical
equipment that must be removed to accomplish the work. Demolition is
expected to be required for all equipment within the boiler room and
all steam, condensate and hot water piping within the boiler room; d)
Removal of all debris; e) Replacing all existing equipment within the
boiler room and replacement of all steam condensate, and hot water
piping within the boiler room is expected to be necessary to provide
full functionality. Debt Collection Improvement Act of 1996, effective
March 31, 1998 all contractors must be registered in the Central
Contractor Registration (CCR) to be considered for award of a Federal
contract. Contact CCR Web site at http: //www.acq.osd.mil/ec.
Registration can also be accomplished via dial up modem at 614-692-6788
(User ID: ccrpub; Password: pub2ccri), or through any DOD Certified
Value Added Network. Additionally, a paper form for registration may be
obtained from the DoD Electronic Commerce Information Center at
1-800-334-3414. All responsible sources may submit a proposal which
shall be considered by the agency. Competitive proposals will be
evaluated on the evaluation criteria as set forth in the solicitation
package. The evaluation criteria may consists of the following factors:
Prime Contractors Experience/Past and present; A/E Qualifications --
SF254/255; Technical Approach (a) Schedule (b) QC and Safety (c) Key
Personnel (Design and Construction). Large Business firms are required
to submit a Subcontracting Plan with their proposal. The
Subcontracting goals are 65% for small business, 15% for small
disadvantage business, and 8% for women-owned business. Specifications
are $10.44 each Non-Refundable. WE DO NOT ACCEPT PERSONAL CHECKS, ONLY
COMPANY CHECKS OR MONEY ORDERS. Make check or money order payable to
USAED Baltimore and mail to the attention of CENAB-CT-O (Business
Support Team). No cash accepted. Issuance o/a 01 February 2000;
proposal due date 02 March 2000. Posted 01/14/00 (W-SN416336). (0014) Loren Data Corp. http://www.ld.com (SYN# 0134 20000119\Z-0009.SOL)