Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JANUARY 21,2000 PSA#2520

U.S. Army Communications-Electronics Command Acquisition Center -- Washington Operations Office, 2461 Eisenhower Ave., Alexandria, VA 22331-0700

39 -- LOAD BANK DUE 013100 POC Susie Shupe, 703-325-2856 E-MAIL: Click here to contact the buyer., sshupe@hoffman-issaa2.army.mil. The US Army CECOM intends to award contract for a Load Bank with the following requirements: (1) Load Capacity; max total rating shall be at least 66 kW (100 kW desired) Note: 60 kW required at 0.8 through 1.0 power factor loading; (2) Portability: The load bank shall be configured in one of the two following options: Integral forklift openings for lifting or wheel mounted; (3) Configuration; Single housed unit desired (reactive, resistive & controls in one enclosed unit); (4) Environment: Indoor/Outdoor operation required; (5) Input: 3-phase AC input required; (6) Control: Single remote control required; Infinitely adjustable load settings required; (7) Voltage Input requirements: 120V line-to-neutral, 208V line-to-line, 240V line-to-neutral and 416V line-to-line; and (8) Frequency Input Requirements: 50 or 60 Hz, 400 Hz (desired). Desired Delivery: 30 April 2000. To be eligible for award, registration in the Centralized Contractor Registration database is mandatory. This effort will be performed under a fixed price purchase order. A request for quotation will be made available on 31 January 2000. Award will be made IAW Simplified Acquisition Procedures. Posted 01/19/00 (W-SN416881). (0019)

Loren Data Corp. http://www.ld.com (SYN# 0134 20000121\39-0002.SOL)


39 - Materials Handling Equipment Index Page