Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 4,2000 PSA#2530

Officer in Charge of Construction, Naval Facilities Engineering Command, Contracts Marianas (Guam), PSC 455 Box 175, FPO 96540-2200

Z -- REPLACE WASH WATER TROUGHS AT FENA WATER TREATMENT PLANT FACILITY, U.S. NAVY PUBLIC WORKS CENTER, GUAM, M.I. SOL N62766-99-B-2931 POC Laura T. Wilhite, Contract Specialist, Tel: (671) 339-4130 or B. Terlaje, Contracting Officer, Tel (671) 339-8387 The work includes the following and incidental related work: (a) Replace Wash Water Troughs at Fena Water Treatment Plant Facility: The Fena Water Treatment Plant Facility is above ground potable (drinking) water holding/filtration tank facility. This facility contains a total of six (6) filter tank cells. It is a fully operational facility and will remain in operation during the duration of this contract. Construction work schedule shall be limited to one (1) filter tank cell at a time. Each filter tank cell must be completely repaird, accepted and brought back on-line before starting work on another filter tank cell. (1) Remove existing pre-cast concrete wash water trough. Eight (8) per filter tank cell forty-eight (48) total and replace with new pre-molded manufactured fiber glass troughs. (2) Remove existing access ladder, platform grating and cover plate one (1) each per filter cell six (6) total and replace with new stainless steel access ladder, fiber reinforced platform grating and stainless steel cover plate. (3)Remove existing manhole access cover in gullet, one (1) each per filter cell six (6) total and replace with new watertight access manhole frame cover. (4) Prepae and resurface existing deteriorated filter tank cell concrete wall surfaces with epoxy coating. (5) Remove and replace approximately 550 linear feet of existing 4" diameter header piping. (6) Remove and replace existing rotating agitator assembly, four (4) each per filter tank cell, twenty-four (24) total. (7) Remove and replace approximately 200 linear feet of existing 6" diameter wash piping, control gate valves, valve extension rod and floor stand assembly six (6) total. Estimated cost range between $1,000,000.00-$5,000,000.00. SIC 1629. Business Size: $17.0 MIL. Plans and specifications will be made available for downloading from the OICC EBS Webpage:http//:209.22.36.44/idex.htm on 22 February 2000. Bid opening date: 24 March 2000, 2:00 p.m.(Guam Time). Follow all instructions on the OICC EBS Webpage relating to registering, viewing and downloading of contract documents. This project is 100% SET-ASIDE FOR SMALL BUSINESS. Posted 01/31/00 (W-SN420466). (0031)

Loren Data Corp. http://www.ld.com (SYN# 0140 20000204\Z-0029.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page