COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 9,2000 PSA#2533U.S. Army Corps of Engineers, Contracting Division, 190 Fifth Street
East, St. Paul, MN 55101-1638 Y -- BANK STABILIZATION RIVERSIDE DAM, RED RIVER OF THE NORTH, GRAND
FORKS, ND & EAST GRAND FORKS, MN SOL DACW37-00-B -- 0003 DUE 041100 POC
POC Bruce Stephenson 651-290-5418 Contracting Officer Fred Mitchell
651-290-5763 WEB: St. Paul District Home Page,
http://www.mvp.usace.army.mil. E-MAIL: Contact Bruce Stephenson,
bruce.r.stephenson@mvp02.usace.army.mil. Principle features of this
project include providing all plant, labor, materials and supplies
required to accomplish sheet pile cut-off to the Riverside Dam across
the Red River of the North, placement of riprap along approximately
4000' of riverbank, placement of more than 1,000 large stones, each
between 4 foot and 5 foot in diameter to create a fish passageway, and
repairs or extensions to pipes outletting into the river. Specific
work required includes, but is not limited to, the placement of
approximately 110,000 tons of riprap, granular fill or bedding, 5,000
tons of lightweight fill, 19,000 square feet of sheet piling and 400
linear feet of 6" PVC Waterline. This procurement is 100% set-aside for
small businesses. SIC Code: 1629. Small Business Size Standard: $17
Million. ESTIMATED MAGNITUDE OF CONSTRUCTION IN TERMS OF PHYSICAL
CHARACTERISTICS AND ESTIMATED PRICE RANGE IS BETWEEN $100,000 AND
$250,000. Solicitations will be available on approximately 08 March
2000 on CD-ROM. To order, register via the St. Paul District web site
at www.mvp.usace.army.mil (click on Contracting, then Advertised
Solicitations). There is no charge for the CD. Telephone requests will
not be accepted. Posted 02/07/00 (W-SN422542). (0038) Loren Data Corp. http://www.ld.com (SYN# 0109 20000209\Y-0008.SOL)