|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 10,2000 PSA#2534Zion National Park, Springdale, Utah 84767 Z -- MAINTENANCE, REPAIR OR ALTERATION OF REAL PROPERTY SOL IFB
1590-AO-005 POC Malinda A. Flatray, FAX Number (435) 772-3337 Provide
bituminous hot plant mix (pavement) for the Bus Maintenance Facility
and Watchman Campground Road in Zion Canyon, Zion National Park. The
Bus Maintenance Facility is under construction and pavement shall be
placed on constructed aggregate base course. The Watchman campground
road pavement is both overlay existing pavement and new pavement on
constructed aggregate base course. The government shall provide edge of
pavement layout. Contractor sahll not disrupt Bus Maintenance Facility
contractor. Contractor shall provide traffic control along Watchman
Campground road. Pavement work consists of providing tack coat on
existing asphalt surfaces and constructing one or more surface courses
composed of a mixture of aggregate, filler if required and bituminous
material, placed on existing base. Posted 02/08/00 (W-SN423357).
(0039) Loren Data Corp. http://www.ld.com (SYN# 0166 20000210\Z-0024.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|