Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 11,2000 PSA#2535

Officer in Charge of Construction, Naval Facilities Engineering Command, Contracts Marianas (Guam), PSC 455 Box 175, FPO 96540-2200

C -- INDEFINITE QUANTITY ARCHITECT-ENGINEERING CONTRACT FOR ENVIRONMENTAL ENGINEERING SERVICES, VARIOUS LOCATIONS, GUAM, M.I. SOL N62766-00-D-0012 POC Contact Ms. Doris Castro at (671) 339-8465 or FAX 339-4248 E-MAIL: click here to contact the contract specialist via, castrodr@pwcguam.navy.mil. THIS SOLICITATION IS 100% SET-ASIDE FOR SMALL BUSINESS CONCERNS. The standard industrial classification code is 8711 with a size standard of $4.0 MIL. In accordance with FAR 52.219-14, Limitations on Subcontracting at least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the small business concern. The Seed Project identified for this indefinite quantity Architect-Engineering (A-E) contract is Work Request 65466. The scope of work for the Seed Project is an engineering investigation and report in accordance with PACNAVFACENGCOM P-74 to accomplish a Comprehensive Performance Evaluation (CPE) Study of the Fena Water Treatment Plant (WTP). The CPE evaluation will identify causes of insufficient or poor plant performance and assess the capability of existing WTP's performance-based capabilities and associated administrative, operation and maintenance practices to meet current and future requirements of 40 CFR Part 141, National Primary Drinking WaterRegulations and GEPA Primary Drinking Water Regulations. The CPE shall be conducted in accordance with the guidelines specified in Handbook: Optimizing Water Treatment Plant Performance Using the Composite Correction Program, EPA/625/6-9 1/027 and includes but not limited to the following: 1) Assessment of plant performance, 2) Evaluation of major unit processes, 3) Identification and prioritization of performance limiting factors, 4) Assessment of the applicability of comprehensive technical assistance, 5) Preparation of a CPE report and 6) Provision of cost estimate of the recommended upgrade and/or corrective measures to comply with 40 CFR Part 141. The meeting and submittal schedule is "kick off" meeting within 10 calendar days from date of contract award, 80% Submittal within 80 calendar days from date of contract award, 100% Submittal within 30 calendar days after receipt of 80% Government review comments, and Final Submittal within 21 calendar days following receipt of 100% Government review comments.The estimated A-E fee for this project is between $100,000 and $250,000. The selection criteria to be used in the evaluation of A-E firms remain the same. The due date for submission of Standard Form (SF) 254/255 is extended to 15 March 2000. This is not a request for a proposal. Posted 02/09/00 (W-SN423929). (0040)

Loren Data Corp. http://www.ld.com (SYN# 0014 20000211\C-0004.SOL)


C - Architect and Engineering Services - Construction Index Page