|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 15,2000 PSA#2537U. S. Army Engineer District, Savannah, P.O. Box 889, Savannah, Georgia
31402-0889 C -- 15TH AIR SUPPORT OPERATIONS SQUADRON FACILITY, FORT STEWART, GA
SOL DACA21-00-R-0017 POC POC -- Mr. Craig Harrell at 912/652-5150
(Technical Questions); Dee O. Henderson (Contractual Questions) WEB: U.
S. Army Corps of Engineers, Savannah District, Contracting,
www.sas.usace.army.mil. E-MAIL: Dee O. Henderson,
dee.o.henderson@sa02.usace.army.mil. The Savannah District, U.S. Army
Corps of Engineers, requires the services of an Architect-Engineer firm
to prepare the plans, specifications, design analysis, and cost
estimates for construction of a 2,715 sq.m. Air Support Operations
Squadron Facility at Fort Stewart, GA. This will be a firm fixed price
contract. The contract is anticipated to be awarded in April 2000 and
completed in December 2000. The estimated construction cost range is
$1,000,000.00 to $5,000,000.00. This announcement is open to all firms
regardless of size. **** 2. PROJECT INFORMATION: The selected firm
will be required to perform the following services: prepare the plans,
specifications, design analysis, and cost estimates for the
construction of a 2,715 sq.m. Air Support Operations Squadron Facility
at Fort Stewart, GA. The project consists of a multi-purpose facility,
which includes office and training space, shop-maintenance space, and
vehicle storage and maintenance bays. Supporting facilities include
utilities and electricservice; fire protection and alarm systems;
paving walks, curbs, and gutters; storm drainage; information systems;
HVAC; site improvements; and demolition. A Comprehensive Interior
Design package may be required. Architect-Engineer services during
construction (shop drawing review and field visits) may also be
required. All design files must originate in and be delivered in the
(*.dgn) format. Exceptions may be granted if the use of scanned files
is required. In this case the scanned files must be converted to
(*.dgn) format for delivery. All design files will be developed using
the Tri Service AEC Standard as supplemented by the Savannah District
instructions. The standards include naming convention, file and
directory structure, line weights, levels and color. Any deviation
shall be approved by the Contracting Officer. **** 3. SELECTION
CRITERIA: See Note 24 for general A-E selection process. The selection
criteria are listed below in descending order of importance (first by
major criteria and then by eachsub- criterion). CRITERIA A-F are
primary. Criteria G thru I are secondary and will only be used as
"tie-breakers" among technically equal firms. **** A. Specialized
Experience and technical competence in (1) Design of Air Force squadron
operations facilities. (2) Knowledge of, and experience with Air Force
design criteria procedures. (3) Knowledge of, and experience with US
Army Corps of Engineers and Savannah District Corps of Engineers design
criteria and procedures. (4) Security Systems (Intruder & Smoke
Detection). (5) Originating designs in (*.dgn) format. (6) Use of
MCACES cost estimating. **** B. Past performance on DOD and other
contracts with respect to cost control, quality of work and compliance
with performance schedules. **** C. Capacity to accomplish the work in
the stated contract period and to provide the following professional
disciplines: architecture, structure, civil, electrical, mechanical,
engineering, topographic surveys, interior design, cost estimating, and
fire protection engineering. These disciplines must be shown in Block
4 of SF 255. Please disregard the "to be utilized" statement at Block
4 of SF 255 and show the total strength of each discipline. **** D.
Professional Qualifications of key management and professional staff
members. The design team must include a Registered Fire Protection
Engineer whose principle duties are fire protection engineering or a
Registered Architect or Registered Engineer who is a full member in
good standing of the Society of Fire Protection Engineers (SFPE). Block
7 must contain resumes for all required disciplines. **** E. Knowledge
of locality as it pertains in design and construction methods of
projects in the geographic area of this contract. **** F. Demonstrated
success in sustainable design and construction techniques Using U.S.
Green Building Council -- LEED Green Building Rating System. ****
SECONDARY CRITERIA **** G. Extent of participation of Small Business
(SB) including (Women Owned Small Business (WOSB)), Small Disadvantaged
Business (SDB), historically black colleges and universities, and
minority institutions in the proposed team, measured as a percentage of
the total estimated effort. **** H. Proximity to the project site, ****
I. Volume of DOD contract awards in the last 12 months as described in
Note 24. **** 4. SUBMISSION REQUIREMENT: See Note 24 for general
submission requirements. Interested firms must submit ONE (1) copy of
SF 255 (11/92 edition) for prime and ONE (1) copy of SF 254 (11/92) for
prime and all consultants to the following address: US Army Engineer
District, Savannah, ATTN: CESAS-EN-ES (Karen Cooper), 100 W. Oglethorpe
Ave., Savannah, GA 31401-3640, not later than close of business the
30th day after the date of this announcement. If the 30th day is a
Saturday, Sunday, or Holiday, the deadline is the close of business of
the next business day. BLOCK 10 OF SF 255 SHALL NOT EXCEED 10 PAGES
PRINTED ONE SIDE OR 5 DOUBLE SIDED PAGES -- FONT SIZE SHOULD NOT BE ANY
SMALLER THAN 10. NO FAXED SUBMITTALS WILL BE ACCEPTED. FIRMS MUST
INCLUDE PRIME's ACASS NUMBER in BLOCK 3 of SF 255. For ACASS
INFORMATION: call 502/808-4591. Cover letters and extraneous materials
(Brochures, etc.) are not desired and will not be considered, PHONE
CALLS are DISCOURAGED unless ABSOLUTELY necessary. PERSONAL VISITS for
the purpose of discussing this announcement WILL NOT BE SCHEDULED.
This is NOT a REQUEST for a PROPOSAL. Posted 02/11/00 (W-SN424513).
(0042) Loren Data Corp. http://www.ld.com (SYN# 0019 20000215\C-0005.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|