COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 18,2000 PSA#2540USAID/Honduras/Office of Contract Management, Unit 2927, APO AA 34022 C -- INVITATION TO PREQUALIFICATION FOR CONSULTING FIRMS FOR THE
DESIGN AND SUPERVISION OF ROAD, BRIDGES AND DRAINAGE WORKS IN HONDURAS
(RECAP) SOL SOL 00-023 DUE 030600 POC Mr. Tim Truitt, Manager and
Chief of Party, Special Executing Unit, FHIS, Tel: 011-504-236-7281,
Fax: 011-504-236-8104, E-mail: ttruitt@usaid.gov WEB:
http://www.info.usaid.gov/procurement_bus_opp/procurement/announce/cbd,
http://www.info.usaid.gov. E-MAIL: http://www.info.usaid.gov,
ttruitt@usaid.gov. The Government of Honduras, acting through the
Honduran Social Investment Fund (FHIS), with the financial support of
the United States Agency for International Development (USAID) Mission
in Honduras, is asking for expressions of internest and applications
for pre-qualification with the purpose of forming a roster of
consulting companies in the United States of America and Honduras, that
may demonstrate sufficient experience and capacity in the area of road
and bridge design and supervision. The Government of Honduras (GOH) is
initiating the permanent rehabilitation of the highways and bridges
damaged by Hurricane Mitch. The rehabilitation program will be
implemented by FHIS and directly managed by a special executing unit.
The funding for this acivity originates in the Unites States Agency for
International Development (USAID) and the Government of Honduras (GOH).
All the contracting processes under RECAP activity shall be in
accordance with the USAID Host Country Contracting Procedures and the
GOH contracting procedures. The RECAP Project will rehabilitate roads
and bridges located in the Departments of Atlantida, Yoro, Colon,
Choluteca and Valle. The total combined value will be approximately
fifty million Dollars (US$ 50 million). Only pre-qualified firms from
Honduras and the United States of America are eligible for bidding on
these works. The rehabilitation works financed by RECAP shall include
the following: a) 2000 kilometers of upaved roads; b) 2000 lineal
meters of bridges (most of them less than 25m long); c) 30 km. of paved
highways (in dispersed sections); and d) 20 km. of cobblestone roads
using labor-based techniques. RECAP intends to tender separate
contracts for the supervision and design of the works. All the works
will have on-site supervision that will include quality control,
measurement of quantities and minor design activities. Design contracts
will principally focus on bridge designs, a few minor road realignments
and slop stabilization. The completed pre-qualification and
certifications-related information should be received not later than
March 6, 2000, at 2:00 p.m., at the following address: c/o Tim Truitt,
Manager and Chief of Party, Special Executing Unit, RECAP Project,
Colonia San Carlos, Calle Ecuador, No. 318, Tegucigalpa, M.D.C.,
Honduras. If it is sent by mail within the United States it should be
addressed to: Tim Truitt (C), USAID/Honduras, Washington, D.C. 20523.
The preferred distribution method for the pre-qualification documents
is via the Internet, from the Internet address indicated below, or
asing a flexile 3.5" diskette to the RECAP Office, located in Colonia
San Carlos, Calle Ecuador, No. 318, Tegucigalpa MDC, Tel.
(504)236-7281, fax: (504) 236-7272. If a printed copy of the documents
is required, it should be specifically requested to this same office,
but both a printed copy and a diskette copy will not both be issued.
The announcement of this invitation for pre-qualification appears in
the Commerce Business Daily (CBD), Official Gazette of the United
States Federal Government and may be seen and downloaded from Internet
using the USAID Web site. The Web address at the world levelis
http://www.info.usaid.gov. Select the option "Business and Procurement
Opportunities" of the Web Main Page, then select "USAID Procurements".
In the following screen, select "Download Available USAID
Solicitations"; locate the number of this invitation and download the
prequalification questionnaire. If you wish to be notified of any
amendment made to the pre-qualification document, you should confirm
receipt of the pre-qualification application through Internet, by
sending a written notification to the contact person indicated at the
receiver of the Pre-qualification Base Document to be sure that the
same has been received in total through Internet and USAID does not
assume responsibility for errors in the information that may result
from the transmission or conversion process. Posted 02/16/00
(W-SN425996). (0047) Loren Data Corp. http://www.ld.com (SYN# 0029 20000218\C-0005.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|