COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 24,2000 PSA#2543Coastal Systems Station, Dahlgren Division, 6703 W. Highway 98, Panama
City, FL 32407-7001 58 -- CONSTRUCTION OF MK -- 86 MOD 0 NAVIGATION DIRECTOR ENCLOSURES
SOL N61331-00-R-0019 DUE 040500 POC Contract Specialist, Mike Wheeler,
850-234-6745; Contracting Officer, Carol Dreger, 850-234-4863 WEB:
www.ncsc.navy.mil/contracts/synopsis/syntable.htm, www.ncsc.navy.mil.
E-MAIL: Wheeler_Michael@ncsc.navy.mil, Wheeler_Michael@ncsc.navy.mil.
The Coastal Systems Station has a requirement for the fabrication of
forty (40) production electronic enclosures. The Enclosures will be
used with the U.S. Navy Airborne Mine Countermeasures (AMCM)
community's new navigation director. As part of this effort, the
contractor will discuss any perceived problems with the drawing package
with the appropriate Government representative. The contractor must
then prepare preliminary revision notices using the Notice of Revision
form provided as Government Furnished Information. Upon completion of
fabrication of the first enclosure, the contractor shall conduct a
Physical Configuration Audit (PCA) on the first enclosure with
Government representation. The unit shall be fully assembled for this
PCA. The contractor, with the government, shall accomplish this PCA
using Section 5.6.3 of MIL-STD-973 for guidance. The hardware shall
conform to the drawings. The contractor shall record the results of the
PCA and provide the results to the government in report form. After
successful acceptance testing of the first enclosure, the contractor
shall deliver 40 complete enclosures within 75 days after contract
award. A technical proposal is required. Requests for the solicitation
shall be referred to the Contract Specialist referenced above. This is
a 100% Small Business set-aside. Note 1 applies. Posted 02/22/00
(W-SN427342). (0053) Loren Data Corp. http://www.ld.com (SYN# 0183 20000224\58-0006.SOL)