|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 1,2000 PSA#2547Huntington District Corps of Engineers, 502 Eighth Street, Huntington,
WV 25701-2070 Z -- BLUESTONE LAKE, DAM SAFETY ASSURANCE, PHASE I SOL
DACW69-00-B-0005 DUE 042100 POC Cheryl D. Parsons, 304-529-5006 Work
consists essentially of removal of existing bulkheads, placement of new
penstock extensions and new mass concrete thrust blocks. Installations
of hydraulically actuated release bulkhead, new hydraulic power unit,
remove and replace existing steel door and frame with watertight door.
The estimated cost range of this project is between $10,000,000.00 and
$25,000,000.00. Solicitation documents will be available 14 March
2000. There will be no charge for solicitation documents. Delivery
shall be completed within 1095 calendar days after date of receipt of
notice to proceed. The solicitation and drawings may be requested by
FAX at(304)529-5281. Funding for this project is not currently
available. Contract will not be awarded until funding is received in
the Huntington District. Posted 02/26/00 (W-SN428869). (0057) Loren Data Corp. http://www.ld.com (SYN# 0146 20000301\Z-0020.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|