COMMERCE BUSINESS DAILY ISSUE OF MARCH 8,2000 PSA#2552Department of Property and Procurement, Division of Procurement,
Building #1, Third Floor, Room 316, Subbase, St. Thomas, Virgin Islands
00802 Y -- CONSTRUCTION SOLICITATION AND SPECIFICATION FOR THE MANGROVE
LAGOON REGIONAL PLANT SOL IFB-11-DPW-T-2000 (CC) DUE 042600 POC Mrs.
Olga Meyers -- 1340774-0828 ;Mr. Mirko M. Restovic 13407731290X2260
SECTION 00100 INVITATION FOR BIDS GOVERNMENT OF THE VIRGIN ISLANDS OF
THE UNITED STATES DEPARTMENT OF PROPERTY AND PROCUREMENT SUBBASE,
BUILDING NO. 1 Invitation No:IFB-11-DPW-T-2000 (CC)________
Date:___FEBRUARY 24 2000______________ Pursuant to the laws of the
Government of the Virgin Islands, sealed bids, for the work described
herein will be received at The Department of Property and Procurement,
Procurement Division, Building 1, Third Floor, Subbase, St. Thomas,
U.S. Virgin Islands 00801 until 1:00 p.m. on April 26, 2000 and at that
time publicly opened. Any bid received after the time and date
specified shall not be considered. Description of Work This project,
located in the Bovoni/Long Point Peninsula area of St. Thomas, USVI, is
the construction of the Mangrove Lagoon Regional Wastewater Treatment
Plant and Lift Station. The lift station features coarse screening and
submersible pumps, along with a standby generator and odor control
facilities. The wet well is constructed of reinforced concrete. The
electrical/generator building is constructed of reinforced masonry on
a reinforced concrete foundation. The firm peak flow capacity of the
station is 2.4 million gallons per day. The wastewater treatment plant
features fine screening, metering, and grit removal at the head works.
Wastewater is then treated in a 3-tank sequencing batch reactor.
Effluent from the tank is disinfected by ultraviolet radiation before
being pumped to the outfall. Sludge from the sequencing batch reactor
is held in a sludge holding tank. Sludge is dewatered in a belt filter
press. Dewatered sludge is trucked to the landfill for disposal. The
design also features a lime storage tank and feeding equipment to
control the alkalinity of the wastewater, a back-up chlorination
system, a septage holding tank and pumps, a plant water system, a plant
drainage system, and odor control facilities. The control building
houses an office, a control room, a laboratory, and a meeting room. The
utility building houses the blowers, stand-by generator, electrical
equipment, lime storage, the chlorination system, and a tool room,
along with various pumps. The belt filter press building houses the
filter press, a screw conveyor, the polymer system and the plant water
control panel. All the buildings are constructed of reinforced
masonry. The major tanks are constructed of reinforced concrete. The
system is controlled through a PLC-based system with a personal
computer operator interface. Work shall be completed within 550
calendar days from receipt of Notice to Proceed. Information regarding
bidding documents Bidding Documents include the Public Notice, this
Invitation for Bids, Instructions to Bidders, Contractor's
Qualification Statement, the Contract, Performance & Payment Bonds,
General Conditions, Supplemental General Conditions, Plans,
Specifications, and other documents bound herein. Bidding documents can
be obtained from Department of Property and Procurement, Procurement
Division, Third Floor, Subbase, St. Thomas, Virgin Islands, at a cost
of $100.00 PER SET. The documents consist of Contract Document Books,
TWO volumes, one entitled Construction Solicitation and Specifications
Volume 1 of 2 Mangrove Lagoon Regional Wastewater Treatment Plant and
the other entitled Construction Solicitation and Specifications Volume
2 of 2 Mangrove Lagoon Regional Wastewater Treatment Plant One compact
disc containing the drawings and an Acrobat Readera in electronic
form, and One half-size set of drawings (18" x 12") Bidder is
responsible for printing out hard copies from the compact disc. All
documents contained in the Contract Document Books are made a part of
this Invitation and by this reference incorporated herein as fully and
effectively as if set forth in detail. The bidder's attention is
directed to the fact that all applicable municipal ordinances, and the
rules and regulations of all authority having jurisdiction over
construction of the project shall apply to Contract throughout, and
they will be deemed to be included in the Contract the same as though
herein written out in full. Bidders must return the following
documents, properly executed as required by the appropriate
instructions, to the Department of Property and Procurement at the
address cited above. Return the original documents, PLUS 10 COPIES. 1.
Invitation for Bids Section 00100 2. Bid for Lump Sum Construction
Contract Section 00410 3. Unit Price Form Section 00430 4. Bid Bond
Section 00435 5. Non-collusion Affidavit Section 00451 (DPP-NCA-52-75)
6. Certification Regarding Debarment, Suspension, Ineligibility and
Voluntary Exclusion Section 00452 7. Eligibility Affidavit Section
00453 8. Contractor's Qualification Statement Section 00454
(P&P-CQS-1973) 9. Financial Statement Section 00455 (DPP-FS-4-75) 10.
Certification of Bidder Regarding Equal Employment Opportunity Section
00456 11. Affidavit of Individual Surety Section 00460 (P&P-AIS-1-73)
Bonds Each bid must be accompanied by a bid guarantee payable to the
Government of the U.S. Virgin Islands. The bid guarantee shall be in an
amount of not less than five percent (5%) of the total bid. The five
percent (5%) Bid Bond will only be accepted in the form of a firm
commitment, such as a Bid Bond, Postal Money Order, Certified Check,
Cashier's Check or Irrevocable Letter of Credit. If Individual Sureties
execute the Bid Bond, they shall be two or more responsible persons. A
complete Affidavit of Individual Surety (Standard Form P & P AIS-1-73)
shall accompany the bond. Corporations executing the bond must be duly
licensed to do business in the Territory of the Virgin Islands.
Following award of contract, the successful bidder shall execute the
construction contract, and shall provide performance and payment bonds,
each in an amount not less than one hundred percent (100%) of the
contract value. Pre-Bid Conference Pre-Bid Conference will be held on
March 28, 2000 at 10:00 a.m. at the Department of Property and
Procurement conference room. Written questions during the bid period
shall be submitted in writing to the Department of Property and
Procurement. A copy of the questions shall be submitted to: Parsons
Engineering Science 8000 Centre Park Drive, Suite 200 Austin, TX 78754
Attention: Kenneth Kuhr, P.E. The last day for receipt of questions
will be April 10, 2000. Questions received after this date will not be
answered. Bid Withdrawal No Bidder will be allowed to withdraw his bid
within a period of Sixty (60) calendar days following the date set for
the opening thereof. Right of Rejection The Government of the Virgin
Islands reserves the right to reject any or all bids if deemed to be in
the best interest of the Government. Posted 03/06/00 (W-SN431610).
(0066) Loren Data Corp. http://www.ld.com (SYN# 0116 20000308\Y-0004.SOL)
Y - Construction of Structures and Facilities Index Page
|
|