|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 15,2000 PSA#2557National Institute of Standards & Technology, Acquisition & Assistance
Div.,100 Bureau Drive Stop 3572, Bldg. 301, Rm B117, Gaithersburg, MD
20899-3572 66 -- FORCE TRANSFER STANDARD GTM VN SOL 53SBNB060064 DUE 032800 POC
Carolyn Wilder,Contract Specialist, (301) 975-8332; Joan Smith,
Contracting Officer, (301) 975-6458 WEB: NIST Contracts Homepage,
http://www.nist.gov/admin/od/contract/contract.htm. E-MAIL: NIST
Contracts Office, Contract@nist.gov. The U.S. Department of Commerce,
National Institute of Standards and Technology (NIST), has a
requirement for a Force Transfer Standard GTM VN. The Force Transfer
Standard GTM VN must meet NIST's obligation as the pivot laboratory for
the CIPM key comparison for force in the 4 MN force range in accordance
with the following specifications: (1) compression mode capacity
between 4 MN and 5 MN, (2)6-wire cable of 6-m length, with 15-pin
D-connector for connection to a DMP-40 indicator, (3) 2 mV/V output,
(4) a maximum repeatability error for different mounting position of
0.0005%, (5) a maximum temperature sensitivity (at both zero load and
at maximum load of 0.0001% / 0C over a temperature range from 18 0C to
22 0C, and (6) a maximum creep error over a 15-menuite time period of
0.008.%. It is the Government's intent to negotiate with GTM Gassman
Theiss Messtechnik GmbH, Phillipp-Reis-Strasse 6, 64404 Bickenback
Germany, the only responsible source that can satisfy the agency's
requirements. Delivery is required 240 days after receipt of order. The
Government anticipates the award of a fixed price purchase order. The
proposed requirement is for equipment for which the Government intends
to solicit and negotiate with only one source under authority of FAR
6.301-1. Interested persons may identify their interest and capability
to respond to the requirement or submit proposals. This notice of
intent is not a request for competitive quotation. However, the
government will consider all proposals received within five (5) days
after date of publication of this synopsis. A determination by the
Government not to compete this proposed requirement based upon
responses to this notice is solely within the discretion of the
government. Information received will normally be considered solely for
the purpose of determining whether to conduct a competitive
procurement. A Request for Quotation (RFQ) package is not available.
Posted 03/13/00 (W-SN433787). (0073) Loren Data Corp. http://www.ld.com (SYN# 0230 20000315\66-0002.SOL)
66 - Instruments and Laboratory Equipment Index Page
|
|