|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 17,2000 PSA#2559USAED, Sacramento, Corps of Engineers, Contracting Division, 1325 J
Street, Sacramento, CA 95814-2922 C -- STRUCTURAL ENGINEERING TO SUPPORT IN-HOUSE STRUCTURAL DESIGN
SECTION WITHIN THE SACRAMENTO DISTRICT. SOL DACW05-00-R-0015 DUE 033000
POC Ken Parkinson (916)557-7477 This is a Sources Sought Synopsis to
identify Small Business concerns capable of performing the work for
this proposed contract action. Businesses must qualify under SIC Code
8712. The U.S. Army Corps of Engineers, Sacramento District, is
considering offering the above project to firms capable of providing
Structural Engineering to support Structural Design Section within the
Sacramento District. A-E services may be required for field
investigations, preparation of reports, alternative design evaluations,
and construction plans and specifications of structural engineering
freatures and related work associated with civil works projects located
in the Sacramento District's area of design responsibility (CA, NV, UT,
CO and parts of other western states). For more information contact Ken
Parkinson, A-E Negotiations Unit, at (916)557-7477. SUBMISSION
REQUIREMENTS: Interested Architect-Engineer firms having the
capabilities to perform this work are invited to submit a completed
SF255(11/92 edition) US Government Architect-Engineer and Related
Services Questionnaire for Specific Project for themselves to USAED,
Sacramento District, ATTN: Contracting Div-Gail Weber, 1325 J Street,
Sacramento, CA 95814-2922. In block 7 of the SF 255 provide resumes for
all key team members, whether with the prime firm or a subcontractor;
list specific project experience for key team members; and indicate the
team members role on each listed project(i.e. project manager, design
engineer, etc.). In block 9 of the SF 255, responding firms must
indicate the number and amount of fees awarded on DoD (Army, Navy, and
Air Force) contracts during the 12 months prior to this notice,
including change orders and supplemental agreements for the submitting
office only. In block 10 of the SF 255, provide the quality management
plan and organization chart for the proposed team. A task specific
quality control plan must be prepared and approved by the Government as
a condition of contract award, but is not required with this
submission. Responses must be received by the close of business(4:30
pm) on March 30, 2000 to be considered Posted 03/15/00 (W-SN434870).
(0075) Loren Data Corp. http://www.ld.com (SYN# 0030 20000317\C-0004.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|