COMMERCE BUSINESS DAILY ISSUE OF MARCH 20,2000 PSA#2560Southwest Division, NAVFACENGCOM, Northbay Area Focus Team/5N Z -- MAINTENANCE, REPAIR OR ALTERATION OF REAL PROPERTY SOL
N69711-91-R-0207 DUE 042000 POC Contract Specialist, Steven Miliner,
619-532-3016 WEB: Miliner S, http//esol.navfac.navy.mil. E-MAIL:
Miliner S, miliners@efdsw.navfac.navy.mil. DESCRITION: MODIFICATION
0003. THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE ORIGINAL
SYNOPSIS ISSUED ON 17 FEBRUARY 2000, SUBMISSION NO. 426616. THE CHANGES
ARE AS FOLLOWS: 1. CHANGE THE TENTATIVE ISSUE DATE OF THE SOLICITATION
FROM 15 MARCH 2000 TO 21 MARCH 2000. 2. CHANGE THE TENTATIVE OPENING
/ RECEIPT DATE FROM 14 APRIL 2000 TO 21 APR 2000. 3. CHANGE THE SITE
VISIT FROM 29 MARCH 2000 AT 9:00 AM TO 5 APRIL 2000 AT 9:00 AM, LOCAL
TIME. DESCRITION: MODIFICATION 0002. THE PURPOSE OF THIS MODIFICATION
IS TO REVISE THE ORIGINAL SYNOPSIS ISSUED ON 17 FEBRUARY 2000,
SUBMISSION NO. 426616. THE CHANGES ARE AS FOLLOWS: 1. CHANGE THE
TENTATIVE ISSUE DATE OF THE SOLICITATION FROM 6 MARCH 2000 TO 15 MARCH
2000. 2. CHANGE THE TENTATIVE OPENING / RECEIPT DATE FROM 21 APRIL
2000 TO 14 APR 2000. 3. CHANGE THE SITE VISIT FROM 21 MARCH 2000 AT
9:00 AM TO 29 MARCH 2000 AT 9:00 AM, LOCAL TIME. DESCRIPTION:
MODIFICATION 0001. THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE
ORIGINAL SYNOPSIS ISSUED ON 17 FEBRUARY 2000, SUBMISSION NO. 426616.
THE CHANGES ARE AS FOLLOWS: 1. THE PROPOSAL EVALUATION CRITERIA IS
CHANGE TO READ: Factor 1 -- Past Performance (Subfactor 1.1 -- Prime
Contractor Past Performance, and Subfactor 1.2 -- Subcontracting Effort
Past Performance), Factor 2 -- Technical / Management (Subfactor 2.1
-Subcontracting Commitment, Subfactor 2.2 -- Past Experience, Subfactor
2.3 -- Maintain Utility Service, and Subfactor 2.4 -- Restrictive Time
Constraints), and Factor 3 -- Price. 2. THE APPROXIMATE RECEIPT DATE
OF PROPOSALS IS CHANGED FROM 21 APRIL 2000 TO 7 APRIL 2000. DESCRIPTION
OF WORK -- The work includes a Base Item 0001 and an Option Item 0001.
The work for Base Item 0001 includes providing all labor, materials
and equipment required to complete the construction of alterations and
additions for the Phase IV replacement of the MCRD steam tunnel
distribution system including demolition and removal of existing steam
tunnel and steam distribution piping. Removal and disposal of asbestos
containing piping insulation and debris, excavation and backfill,
surface repair, direct burial exterior steam distribution system and
appurtenances, concrete masonry and exterior cement plaster enclosures,
cast-in-place concrete pits for equipment and piping, metal enclosure
gates and pit covers, painting, cutting, patching and repair,
electrical, plumbing and incidental related work. Option Item
0001includes, as an option to the Government to award within 180
calendar days following contract award, all work related to demolition
of existing steam tunnel system to the officer housing area as
indicated in Areas 9, 59, 60, 61, 62, 63, 64, 65, and 66. The contract
is to be awarded to the responsible offeror who submits the proposal
considered most advantageous to the Government considering Factor 1 --
Past Performance (Subfactor 1.1 -- Prime Contractor Past Performance,
and Subfactor 1.2 -- Past Subcontracting Efforts), Factor 2 --
Technical / Management (Subfactor 2.1 -- Past Experience,Subfactor 2.2
-- Maintain Utility Service, and Subfactor 2.3 -- Restrictive Time
Constraints), and Factor 3 -- Price. When the proposal is evaluated as
a whole, Factors 1 and 2 (Past Performance and Technical/Management)
are equal in importance. When the proposal is evaluated as a whole,
Factors 1 and 2 combined are approximately equal in importance to cost
or price. The importance of price will increase if offerors in the
competitive range are considered essentially equal in terms of
technical capability, or if a price is so significantly high as to
diminish the value of technical superiority to the Government. Site
Visit will be scheduled for 21 March 2000 at 9:00 AM at the Marine Corp
Recruit Depot (MCRD), Building 224, 4600 Belleaum Avenue, MCRD, San
Diego, California. Immediately following the Site Visit, a Pre-Proposal
Conference will be held at 10:00 AM to 12:00 PM at the same location.
It is imperative a Security list of person(s) who will be participating
in the Site Visit / Pre-Proposal Conference is provided a minimum of
two (2) days in advance to: Ms. Jeannette Perez at fax number: (619)
524-2905. Ms. Perez may be reached at: (619) 524-3100, Ext: 149.
Failure to provide a security list may deny access to Building 224,
MCRD. Key subcontractors are encouraged to attend. Only one Site Visit
will be offered. For additional information, please contact Mr. Steven
Miliner at (619) 532-3016, or fax your inquiries to (619) 532-2469.
This is not a public bid opening. The estimated cost is between
$1,000,000 and $5,000,000. Firm Fixed Price Contract. Contract duration
is approximately 390 calendar days. Proposals will be considered from
all responsible sources. This project is unrestricted. The Standard
Industrial Code is 1623 and the annual size is $17 million. It is
recommended the subcontracting goals reflect a minimum goal of 5% for
Small Disadvantaged Business Subcontracting Effort. In accordance with
FAR 5.102(a)(7), availability of the solicitation will be limited to
the electronic medium; solicitation will be available for download free
of charge via the Internet World Wide Web at http:
esol.navfac.navy.mil. Hard copies (paper sets) or CD-ROM of
solicitation will not be provided by the Government. The official plan
holders list will be maintained and can be printed from the website.
All prospective offerors and plan rooms are encouraged to register as
plan holders on the website. Plan holders lists will not be faxed and
will only be available from the website. Registering offerers and plan
rooms must provide a complete name, complete mailing address, area
code and phone number, Offerer type (prime contractor, subcontractor,
supplier or plan room), email address and size (large business, small
business, small disadvantaged business, woman owned small business or
other). Notification of any changes (amendments) to the solicitation
will be made only on the Internet. It will be the contractor's
responsibility to check the website for any posted changes. Tentative
issue date is on or about 6 March 2000 with the opening / receipt date
approximately 21 April 2000. Posted 03/16/00 (D-SN435123). (0076) Loren Data Corp. http://www.ld.com (SYN# 0142 20000320\Z-0020.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|