COMMERCE BUSINESS DAILY ISSUE OF MARCH 21,2000 PSA#2561USDA Forest Service, Procurement Office, 1700 Bypass Road, Winchester,
Kentucky 40391 Y -- CONSTRUCTION OF CELINA DAM ACCESS ROAD SOL IFB R9-12-00-26 DUE
050200 POC Steven E. Mumford (606)745-3127; Russ Christensen
(812)547-7051 Contractor shall provide all labor, supervision,
equipment, materials and incidental supplies necessary to perform the
required work on the Celina Dam Access Road No. 501.500 on the Tell
City Ranger District of the Hoosier National Forest, Perry County,
Indiana. The project is located within the Indian/Celina Lakes
Recreation Area which is adjacent to State Highway 37, approximately
1.5 miles south of Interstate 64, Exit 80. The new Celina Dam Access
Road (Road No. 501.500) starts at approximately mile post 1.45 on
Indian Lake Road No. 501. A pre-bid meeting/site visit will be held on
or around April 13, 2000, depending upon the issue date of the
solicitation being on or around April 3, 2000. This project will
consist of construction of approximately 1.78 miles of new single lane
road, with turnouts, and obliteration of approximately 3,300 feet of
existing roadway. The new road construction will include clearing,
grubbing, preparation of roadbed and drainage structures, installation
of approximately 15-20 culverts and surfacing with 4 inches of No. 53
aggregate. The price range for this project is between $50,000 and
$150,000. This project will be solicited using Invitation for Bid
procedures on an unrestricted basis, i.e. there wll be no set-asides.
Posted 03/17/00 (W-SN435705). (0077) Loren Data Corp. http://www.ld.com (SYN# 0095 20000321\Y-0006.SOL)