COMMERCE BUSINESS DAILY ISSUE OF MARCH 21,2000 PSA#2561USDA, Forest Service, P.O. Box 25127, Lakewood, CO 80225 Z -- FDR 800, WEST DIVIDE ROAD RECONSTRUCTION SOL IFB RMAST-00-041 DUE
053100 POC Barbara Hayden 303/275-5273; Contracting Officer Byron B.
Brown This project involves the reconstruction and sediment control of
approximately 7.56 km of FDR 800, West Divide Road, under watershed
restoration. The entire project consists of clearing, road
conditioning, corrugated metal pipe replacement and installations, and
there are sections of aggregate placement, pitrun placement,
geotextile placement, realignment, ditch construction, culvert and
cattleguard cleaning, and signing. The project is located on the Rifle
Ranger District, Mesa County, Colorado. From I70, go south at the Silt
exit. Take a left onto the frontage road, then a right across the
Colorado River, then a right onto County Road 345, then a left onto
County Road 331, Dry Hollow Creek. Go until it ends at County Road 342
and take a right at the intersection. Go for about a mile on County
Road 342 until you reach the intersection of 344, West Divide. Make a
left hand turn, and go until you reach the Forest Boundary, the
beginning of FDR 800, which is where the project begins. Contract time
is 90 calendar days. Price range is between $100,000 and $250,000. All
responsible sources may submit an offer which will be considered.
Posted 03/17/00 (W-SN435669). (0077) Loren Data Corp. http://www.ld.com (SYN# 0128 20000321\Z-0025.SOL)