|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 22,2000 PSA#2562USACE Vicksburg District, 4155 Clay Street, Vicksburg, MS 39180-3435 Y -- FURNISH ALL NECESSARY PLANT, LABOR, AND MATERIALS TO REMOVE AND
REPLACE METAL ROOFING AND SIDING ON BUILDING 3051 LOCATED AT US ARMY
CORPS OF ENGINEERS WATERWAYS EXPERIMENT STATION, VICKSBURG, MS SOL
DACW42-00-B-0001 DUE 051800 POC Randy Brown 601 631-7249 WEB:
Contracting Division Homepage, http://www.mvk.usace.army.mil/contract/.
E-MAIL: Randy Brown 601-631-7249, Randy.R.Brown@MVK02.usace.army.mil.
The work consists of furnishing all plant, labor, materials, and
equipment necessary to replace all metal sheathing on roof and walls of
Building 3051 located at Waterways Experiment Station, Vicksburg, MS;
provide 3 new overhead coiling doors and provide 3' vinyl backed R-10
insulation on all walls and roof. The approximate dimensions of the
building are 149'x488'x45'. The estimated value of the proposed work is
between $250,000.00 and $500,000.00. Plans and specifications will be
available on the Vicksburg Consolidated Contracting Office WEB PAGE at
http://www.mvk.usace.army.mil/contract/ and on COMPACT DISC AT NO
CHARGE. Hardcopies will not be available. The CD-ROM May be requested
electronically by registering on our homepage or by mailing your
request to VCCO AT 4155 CLAY STREET, VICKSBURG, MS 39183-3455. Issue
date on or about April 14, 2000. Bid Opening Date on or about May 18,
2000. This procurement is 100% set-aside for Small Business. See
numbered Note 1 Posted 03/20/00 (W-SN435991). (0080) Loren Data Corp. http://www.ld.com (SYN# 0113 20000322\Y-0006.SOL)
Y - Construction of Structures and Facilities Index Page
|
|