|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 30,2000 PSA#2568U. S. Army Engineer District, Savannah, P.O. Box 889, Savannah, Georgia
31402-0889 C -- CENTRAL ENERGY PLANT MODERNIZATION -- PHASE III, FORT GORDON, GA
SOL DACA21-00-R-0021 POC Mr. Efrain Rosario at 912/652-6120 (Technical
Questions) or Rod Hill at 912/652-5301 (Contractural Questions) WEB:
U.S. Army Corps of Engineers, Savannah District, Contracting,
www.usace.army.mil. E-MAIL: Roderick Hill,
roderick.hill@sas02.usace.army.mil. The Savannah District, U.S. Army
Corps of Engineers, requires the services of an Architect-Engineer firm
to prepare the plans, specifications, design analysis, and cost
estimates for construction of a interconnection of the north and south
heating and cooling distribution zones and incorporation of the design
documents of Phases I and II currently being prepared by an A-E firm
into a single, biddable design package at Fort Gordon, GA. This will be
a firm fixed price contract. The contract is anticipated to be awarded
in June 2000 and completed in December 2000. The estimated
construction cost range is $1,000,000.00 to $5,000,000.00. This
announcement is open to all firms regardless of size. **** 2. PROJECT
INFORMATION: The selected firm will be required to perform the
following services: prepare the plans, specifications, design analysis,
and cost estimates for the construction of a interconnection of the
north and south heating and cooling distribution zones and
incorporation of the design documents of Central Energy Plant
Modernization, Phase I and II at Fort Gordon, GA. The project consists
of a heating and cooling distribution systems, retrofit of existing
Central Energy Plants. Architect-Engineer services during construction
(shop drawing review and field visits) may also be required. All
design files must originate in and be delivered in the (*.dgn) format.
Exceptions may be granted if the use of scanned files is required. In
this case the scanned files must be converted to (*.dgn) format for
delivery. All design files will be developed using the Tri Service AEC
Standard as supplemented by the Savannah District instructions. The
standards include naming convention, file and directory structure, line
weights, levels and color. Any deviation shall be approved by the
Contracting Officer. **** 3. SELECTION CRITERIA: See Note 24 for
general A-E selection process. The selection criteria are listed below
in descending order of importance (first by major criteria and then by
each sub- criterion). CRITERIA A-F are primary. Criteria G thru I are
secondary and will only be used as "tie-breakers" among technically
equal firms. **** A. Specialized Experience and technical competence in
(1) Design of Central Energy Plants. (2) Knowledge of, and experience
with Army design criteria procedures. (3) Knowledge of, and experience
with US Army Corps of Engineers and Savannah District Corps of
Engineers design criteria and procedures. (4) Originating designs in
(*.dgn) format. (5) Use of MCACES cost estimating. **** B. Past
performance on DOD and other contracts with respect to cost control,
quality of work and compliance with performance schedules. **** C.
Capacity to accomplish the work in the stated contract period and to
provide the following professional disciplines: architecture,
structure, civil, electrical, mechanical, engineering, topographic
surveys, interior design, cost estimating, and fire protection
engineering. These disciplines must be shown in Block 4 of SF 255.
Please disregard the "to be utilized" statement at Block 4 of SF 255
and show the total strength of each discipline. **** D. Professional
Qualifications of key management and professional staff members. The
design team must include a Registered Fire Protection Engineer whose
principle duties are fire protection engineering or a Registered
Architect or Registered Engineer who is a full member in good sanding
of the Society of Fire Protection Engineers (SFPE). Block 7 must
contain resumes for all required disciplines. **** E. Knowledge of
locality as it pertains in design and construction methods of projects
in the geographic area of this contract. **** SECONDARY CRITERIA ****
F. Extent of participation of Small Business (SB) including (Women
Owned Small Business (WOSB)), Small Disadvantaged Business (SDB),
historically black colleges and universities, and minority institutions
in the proposed team, measured as a percentage of the total estimated
effort. **** G. Proximity to the project site, **** H. Volume of DOD
contract awards in the last 12 months as described in Note 24. **** 4.
SUBMISSION REQUIREMENT: See Note 24 for general submission
requirements. Interested firms must submit ONE (1) copy of SF 255
(11/92 edition) for prime and ONE (1) copy of SF 254 (11/92) for prime
and all consultants to the following address: US Army Engineer
District, Savannah, ATTN: CESAS-EN-ES (Karen Cooper), 100 W. Oglethorpe
Ave., Savannah, GA 31401-3640, not later than close of business the
30th day after the date of this announcement. If the 30th day is a
Saturday, Sunday, or Holiday, the deadline is the close of business of
the next business day. BLOCK 10 OF SF 255 SHALL NOT EXCEED 10 PAGES
PRINTED ONE SIDE OR 5 DOUBLE SIDED PAGES -- FONT SIZE SHOULD NOT BE ANY
SMALLER THAN 10. NO FAXED SUBMITTALS WILL BE ACCEPTED. FIRMS MUST
INCLUDE PRIME's ACASS NUMBER in BLOCK 3 of SF 255. For ACASS
INFORMATION: call 502/808-4591. Cover letters and extraneous materials
(Brochures, etc.) are not desired and will not be considered, PHONE
CALLS are DISCOURAGED unless ABSOLUTELY necessary. PERSONAL VISITS for
the purpose of discussing this announcement WILL NOT BE SCHEDULED.
This is NOT a REQUEST for a PROPOSAL Posted 03/27/00 (W-SN438373).
(0087) Loren Data Corp. http://www.ld.com (SYN# 0032 20000330\C-0007.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|