COMMERCE BUSINESS DAILY ISSUE OF APRIL 6,2000 PSA#2573Directorate of Contracting, Attn: AFRC-FM-DC, 2103 South 8th Avenue,
Fort McCoy, WI 54656-5153 54 -- FURNISH AND INSTALL THREE (3) PICNIC SHELTERS TO INCLUDE SITE
WORK, SLAB CONSTRUCTION, AND ERECTION OF SHELTERS ON SITE. SOL
DAKF61-00-Q-0042 DUE 042600 POC Dawn M. Sharp, Contract Specialist,
608-388-8459 or Brenda Heuer, Contracting Officer, 608-388-3203 WEB:
Click here to access DBS,Contracting Web Page,
http://www.mccoy.army.mil/garrison/DBS/DOC. E-MAIL: Click here to
e-mail Contract Specialist, dawn.sharp@emh2.mccoy.army.mil. This is a
COMBINED SYNOPSIS/SOLICITATION for commercial items prepared in
accordance with the Simplified Acquisition Procedures in FAR 13 and the
format in subpart 12.6, as supplemented with additional information
included in this notice. This announcement constitutes the only
solicitation; quotes are being requested and a written solicitation
will not be issued. This solicitation is issued as a Request for
Quotation (RFQ), DAKF61-00-Q-0042 and is due by COB 26 April 2000. This
RFQ is set aside 100% for small business, the SIC code is 3448, and the
small business size standard is 500 employees. A fixed price contract
is anticipated with one line item. CLIN 0001 Furnish and install three
(3) picnic shelters to include site work, slab construction, and
erection of the shelters on site. 1 JOB @ $_____________._____. SUMMARY
OF WORK (Request drawings via FAX 608-388-7080) 1.1.1 Provide and
install three (3) picnic shelters to include site work, slab
construction, and erection of shelters on site. Actual performance on
site totals 45 calendar days. 1.1.2 Contractor to provide all tools,
materials, and labor to install slabs and erect shelters. Drawings
showing location of shelter are provided. Drawings showing basic
structure, footings, and slab requirements are provided. 1.2 REMOVAL:
1.2.1 Remove 6" of surface material at each site. Haul material to
designated location (round trip will not exceed 16 miles). In areas
needing fill surface material must be removed first. Fill to be
provided by contractor. 1.3 NEW WORK: 1.3.1 Establish elevation of slab
so top of slab is at 4" above grade. Excavate and pour frost footers
for each support column. Prepare sub-grade for slab utilizing compacted
crushed gravel/sand. Concrete slab to be 6" thick utilizing a 6 bag mix
with fiber reinforcement to a ratio of one 5# bag per cubic yard. Slab
to extend 3 feet beyond finished roofline in all directions and slope
to outside edge. Slab to have expansion/control joints at points per
manufacturers instructions. 1.3.2 Furnish, assemble and install each
shelter per manufacturers instructions. Location/orientation of
shelters to be marked by the COR. 1.3.3 Place black dirt around
perimeter of shelter, landscape/re-seed area. Slope to edge of slab.
1.3.4 Stub in 1-1/4" PVC conduit for future electrical service next to
corner column. 1.4 DETAIL INFORMATION: 1.4.1 Shelters for Pine View
Recreation Area beach, campground and picnic area. Requirement is for
three (3) shelters, approximately 36' wide x 10' high, in an octagonal
shape with a two roof system on a concrete slab. 1.5 MATERIAL: 1.5.1
Picnic shelter, the government is looking for low maintenance,
well-constructed, and attractive picnic shelters. Vendors are not
required to quote the exact model, however, they should offer a product
with similar features. Based upon Pittsburgh Octagonal Duotop Model
8532D, By Litchfield Industries, Inc, Litchfield, MI 49252, telephone
1-800-542-5282. The government is interested in the following features:
Steel roof decking and steel structure. Roof decking/structure shall be
able to withstand a 40 lb. live load and 20 lb. (95-100 MPH) wind load.
Roof panels shall be of 24 gauge steel panels, featuring a galvalume
substrate and Kynar 500 coating with matching fascia and trim, color of
one (1) shelter roof Red, one(1) shelter roof green, and one (1)
shelter roof blue. The frame of the shelter shall be ASTM A-500 grade
B tube steel, factory welded per latest AWS standards. Field welding
will not be required. The steel frame shall be factory prime painted
and one coat of durable finish paint applied (color Black). The shelter
shall be designed to the current UBC Building Code. 1.5.2 Concrete, 6
bag mix containing 3/4 aggregate and fiber reinforcement with light
broom finish. 1.5.3 Submittals: Required for shelter and slab detail
for approval. 2 complete sets of product manuals/drawings for each
shelter. 1.6 Additional information: 1.6.1 No electric is available at
the building sites. 1.6.2 Site visits are available and encouraged if
set up through the POC: 1.6.3 Point of Contract (POC) for additional
information is Doug Anderson, Bldg. 2187, Fort McCoy, WI, Phone
608-388-4613. 1.6.4 Contractor is responsible for coordinating with
government as to utility location prior to digging. Offerors DUNS
#___________________CAGE Code_________. All responsible sources may
submit a bid, which shall be considered. This solicitation document
incorporates provisions and clauses in effect through Federal
Acquisition Circular 97-13. FAR clauses may be accessed at
http://farsite.hill.af.mil. The following Provisions and Clauses are
applicable: 52.212-1, Instruction to Offerors-Commercial;. 52.212-2
Evaluation of Commercial Items (i) technical capability of the item to
meet stated requirement, (ii) Price, (iii) past performance; para (b)
technical capability and past performance when combined are equally as
important as price. To evaluate the technical, offeror must submit
product literature demonstrating the products features and
performance.; 52.212-3 Offeror Representationsand Certifications --
Commercial Items; 52.212-4 Contract Terms and Conditions -- Commercial
Items; 52.212-5 Contract Terms and Conditions Required to Implement
Statutes or Executive Orders -- Commercial Items with 52.222-21
Prohibition of Segregated Facilities, 52.222-26 Equal Opportunity,
52.222-35 Affirmative Action for Disabled Veterans and Veterans of the
Vietnam Era, 52.222-36 Affirmative Action for Workers with
Disabilities, and 52.222-37 Employment Reports on Disabled Veterans and
Veterans of the Vietnam Era; 52.237-2 Protection of Government
Buildings, Equipment, and Vegetation; 52.211-6 Brand name or equal.
DFAR Clauses 252.212-7001 Contract Terms and Conditions Required to
Implement Statues or Executive Order Applicable to Defense Acquisitions
of Commercial items; 252.225-7000 Buy American Act-Balance of Payments
Program Certificate; 252.225-7002 Qualifying country sources as
subcontractors; 252.204-7004 Required Central Contractor Registration
(NOTE: YOU MUST BE CENTRAL CONTRACTOR REGISTERED (1-888-227-2423 OR
www.ccr2000.com IN ORDER TO BE CONSIDERED FOR AWARD). In accordance
with FAR 39.106, the contractor shall ensure that the offered product
is Year 2000 compliant. PARTIES INTERESTED IN RESPONDING TO RFQ may
submit their quote in accordance with standard commercial practice
(i.e. quote form, letterhead, etc.) and MUST INCLUDE THE FOLLOWING
INFORMATION: solicitation number, (DAKF61-00-Q-0042), offeror's
complete mailing and remittance address, discount terms, unit price,
warranty information, product literature, DUNS number, and completed
FAR 52.212-3. Quotes and applicable literature must be received at DBS,
Contracting, 2103 South 8th Avenue, Fort McCoy, WI 54656-5153 NO LATER
THAN 1630 HOURS (CST) 26 APRIL 2000. POC for additional information is
Dawn M. Sharp, Contract Specialist, (608)388-8459, fax (608)388-7080,
dawn.sharp@emh2.mccoy.army.mil. Numbered Note 1-100% SB Set-aside
applies. Posted 04/04/00 (W-SN441199). (0095) Loren Data Corp. http://www.ld.com (SYN# 0182 20000406\54-0001.SOL)