COMMERCE BUSINESS DAILY ISSUE OF APRIL 6,2000 PSA#2573

Bechtel Nevada, Mail Stop NLV 018, Post Office Box 98521, Las Vegas, NV 89193-8521

Y -- CONSTRUCTION UPGRADE OF EXISTING 138KV POWER SUBSTATION SYSTEM SOL 1000-gm-00 DUE 041300 POC gary morrison, 702-295-7602 E-MAIL: click here to contact the procurement representative, morrisgl@nv.doe.gov. Sources Sought/Request for Information. Bechtel Nevada is currently upgrading the Nevada Test Site 138kV power system. Existing electromechanical relays are to be replaced with modern solid-state microprocessor based relays and existing 138kV Circuit Switchers are to be replaced with 138kV SF6 Gas Insulated Circuit Breakers. The design requirements are provided by Bechtel Nevada and will require installation and construction by a sub-contractor. Construction will be in accordance with applicable codes and standards. Interested parties should submit a brief experience statement showing (1) multidisciplinary team experienced in the installation of solid-state microprocessor based relays; i.e. Schweitzer Engineering Laboratories (SEL) type relays in 138kV substation environments and installation of 138KV SF6 Gas Insulated Circuit Breakers. (2) specific examples of experience in the area of 138kV substation construction including structural concrete foundations, steel support structures, and 138kV bus modifications. Provide individual or corporate experience in excess of five years. Interested parties should submit experience statement in completing this type of work (limited to 5 pages) to Bechtel Nevada Corporation, Attention: Gary Morrison via fax at (702) 295-1702 no later than 04/13/00. Posted 04/04/00 (W-SN440924). (0095)

Loren Data Corp. http://www.ld.com (SYN# 0096 20000406\Y-0016.SOL)


Y - Construction of Structures and Facilities Index Page