Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF APRIL 7,2000 PSA#2574

1822 VAN PATTON WPAFB OH, 45433

J -- PEACE SUN IX UPGRADE OF BASE SEWER LINES SOL F33657-00-R-0011 DUE 050500 POC EARLE D. MUNDELL/CAPT. MIKE BEACH,937-257-7298 EXT. 4083/937-257-7103 WEB: 00R0011PK-PEACE SUN IX UPGRADE OF BASE SEWER LINES, http://www.pixs.wpafb.af.mil/pixslibr/00R0011PK/00R0011PK.asp. E-MAIL: EARLE.MUNDELL@WPAFB.AF.MIL, EARLE.MUNDELL@WPAFB.AF.MIL. Background "A requirement exists on King Abdulaziz Air Base, Dhahran, Kingdom of Saudi Arabia (KSA) to provide materials, equipment and labor necessary to install the following: 1) a new Glass Reinforced Plastic (GRP) sewer line 2) connect the existing branch sewers to the new sewer line and 3) demolish the existing sewer line. (See Section 3 of Statement of Work for further instructions) The new sewer line will provide the necessary capacity to handle the current building requirements. All prospective contractors shall review all requirements during a site visit scheduled for three weeks before the issuance of the Request for Proposal (RFP). The government prior to the submission of the contractor's proposal will incorporate all clarifications or changes to the original Statement of Work (SOW) made during the site visit. Each contractor shall be required to confirm any measurements, quantities, shapes, locations or sizes during the site visit. The contractor shall coordinate all work with the Royal Saudi Air Force (RSAF) to minimize mission disruption. Overall contract performance period will be 240 days following the notice to proceed. All items provided by the contractor will include the applicable manufacturer's warranty and contract warranties for one year. The contractor shall be liable for any damage to RSAF property caused by them during the contract duration. The contractor shall be responsible for obtaining and tracking all passes for the life of the contract. The contractor shall determine the need for a staging area at the pre-construction meeting. The contractor shall obtain permission form the Base Operations and Maintenance (O&M) Department to connect with the existing utilities and absorb all costs associated with those connections. The contractor shall perform all work in accordance with the most recent editions of the national and international codes, standards, regulations, technical orders and safety and health manuals listed in Section 2 of the attached Statement of Work (SOW).The contractor shall be responsible for all construction management and quality control. This shall be performed in accordance with Section 1.13 of the attached SOW. All submissions must be approved by the Administrative Contracting Officer (ACO). The following is a list of the appropriate submissions further elaborated on in Section 4 of the attached Statement of Work (SOW): 1) Materials 2) Equipment 3) Shop Drawings 4) Testing schedule 5) As-Built Drawings and O&M manuals 6) Two-years worth of spare parts. " Posted 04/05/00 (D-SN441383). (0096)

Loren Data Corp. http://www.ld.com (SYN# 0041 20000407\J-0007.SOL)


J - Maintenance, Repair and Rebuilding of Equipment Index Page