COMMERCE BUSINESS DAILY ISSUE OF APRIL 11,2000 PSA#2576U.S. Army Engineer District, Chicago, Corps of Engineers, 111 North
Canal Street, Chicago, Illinois 60606-7206 C -- INDEFINITE DELIVERY ARCHITECT ENGINEER (A-E) CONTRACT FOR
ENGINEERING SERVICES FOR THE CHICAGO SHORELINE STORM DAMAGE REDUCTION
PROJECT, CHICAGO DISTRICT, US ARMY CORPS OF ENGINEERS POC For technical
information contact Joseph Schmidt (312)353-6400 X3070; for contractual
information contact Katherine L. McClendon (312)353-6400 X1701.
CONTRACT INFORMATION: Engineering services, procured in accordance with
PL 92-582 (Brooks A-E Act) and FAR Part 36, are required for the
Chicago Shoreline Storm Damage Reduction Project, a civil works project
within the Chicago District boundaries. One Indefinite Delivery Type
contract will be negotiated and awarded, with a base period of one year
from the date of award with options to extend for up to two additional
one year periods. An additional contract with a second firm may be
negotiated and awarded under this announcement should the Chicago
District require the additional resource. Work will be assigned by
negotiated delivery orders. Individual, fixed-price delivery orders
will not exceed $1,000,000 and the annual ceiling for the base year and
any option year is $1,000,000. Minimum guaranteed amount for the base
year is $20,000.00 and $10,000 for each individual option year. The
estimated award date of the contract is November 2000. This
announcement is open to all businesses regardless of size.If a large
business is selected for this contract, it must comply with FAR
52.219-9 regarding the requirement for a subcontracting plan on that
part of the work it intends to subcontract. The subcontracting goals
are that a minimum of 40% of the contractor's intended subcontract
amount be placed with small business (SB), including small
disadvantaged businesses (SDB) and women owned small business (WOSB),
and 8% be placed with SDB and 5% with WOSB. The plan is not required
with this submittal. The wages and benefits of service employees (see
FAR 22.10) performing under this contract must be at least equal to
those determined by the Department of Labor under the Service Contract
Act. PROJECT INFORMATION: The Project is for major reconstruction of
the Lake Michigan shoreline of the City of Chicago to prevent further
storm damage and flooding along the lakefront as described in House
Document 103-302 and the Illinois Shoreline Interim III -- Final
Feasibility Report and Environmental Assessment, available for viewing
in the Chicago District Library. The project limits for this contract
are from Wilson Avenue, near Montrose Harbor, on the north to 57th
Street on the south, consisting primarily of steel sheetpile stepstone
revetment reconstruction. The contract requires engineering services
including: architectural, civil, coastal, cost, geotechnical,
hydraulic, and structural engineering necessary to analyze data,
prepare technical reports, design memoranda, plans and specifications,
and engineering services during construction. Each of these elements
may be required separately or together for the project. SELECTION
CRITERIA: See Note 24 for general selection process. Firms must
demonstrate in their submittal the ability to meet the selection
criteria. The selection criteria are listed below in descending order
of importance. Criteria a-e are primary factors. Criteria f-h are
secondary factors and will only be used as "tie-breakers" among
technically equal firms and are of equal value. a) Specialized
Experience and Technical Competence in evaluation, design, cost
estimating, and constructibility of constructed projects consisting of:
(1) anchored and cantilevered vertical sheetpile walls; (2) other
concrete and steel shore protection systems; (3) rubble mound shore
protection structures; and (4) beach systems. b) Experience in the
design of constructed shoreline protection structures in marine
environments similar to Lake Michigan at Chicago. c) Professionals in
the following key disciplines: coastal, structural, cost, geotechnical,
civil, architectural, and hydraulic. The evaluation will consider
education, training, registration in the State of Illinois, and
relevant experience in the projects presented. d) Past performance on
DoD and other contracts with respect to cost control, quality of work,
and compliance with performance schedules. e) Capacity to perform two
concurrent $500,000 work orders within a 6 month period. The
evaluation will consider the experience of the firm and any consultants
in similar size projects, and the availability of an adequate number of
personnel in key disciplines. f) Geographic location of the principal
design office within the Chicago District boundaries. g) Extent of
participation of SB (including woman-owned), SDB, historically black
colleges and universities, and minority institutions in the proposed
contract team, measured as a percentage of the total estimated effort.
h) Volume of DoD contract awards in the last 12 months as described in
Note 24. SUBMISSION REQUIREMENTS: See Note 24 for general submission
requirements. Interested firms having the capabilities to perform this
work must submit six copies of SF 255 (11/92 edition), and two copies
of SF 254 (11/92 edition) for the prime firm and all consultants, to
the US Army Corps of Engineers, Chicago District, 111 North Canal
Street, Suite 600, Chicago, IL 60606-7206 ATTN: Contracting, not later
than the close of business on the 30th day after the date of this
announcement. If the 30th day is a Saturday, Sunday, or Federal
holiday, the deadline is the close of business of the next business
day. Include the firm's ACASS number in the SF 255, Block 3b. For ACASS
information call 503-326-3459. In SF 255, Block 10 describe
MicroStation J compatible CADD capabilities. The SIC Code for this
procurement is 8711. Solicitation packages are not provided. This is