COMMERCE BUSINESS DAILY ISSUE OF APRIL 12,2000 PSA#2577US Army Materiel Command Acquisition Center, White Sands Contracting
Division, AMSSB-ACW (Bldg 126W), White Sands Missile Range, New Mexico
88002-5201 23 -- TRAILER MOUNTED FIELD CONDITIONING UNIT (TMFCU) SOL
DAAD07-00-R-0212 DUE 042800 POC Natividad Cereceres 505-678-1931
E-MAIL: Contract Specialist, cereceresnc@wsmr.army.mil. i) This
synopsis is a streamlined solicitation for commercial items prepared in
accordance with FAR Subpart 12.6, as supplemented with additional
information included in this notice. This announcement constitutes the
only solicitation; quotations are being requested and a written
solicitation will not be issued. (ii) The solicitation number is
DAAD07-00-R-0212. The solicitation is issued as a Request for Proposal
(RFP). (iii) This solicitation document and incorporated provisions
and clauses are those in effect through Federal Acquisition Circular
97-15. (iv) This solicitation is unrestricted. The Standard Industrial
Classification Code is 3569. (v) U S Army Materiel Command Acquisition
Center, White Sands Division, White Sands Missile Range, New Mexico,
solicits proposals for one (1) each Trailer-Mounted Field Conditioning
Unit (TMFCU). This is an initial requirement to replace equipment that
can no longer be repaired. One other TMFCU may be purchased at a later
time, but it is not currently included or provided for in any White
Sands financial plan. (vi) The TMFCU shall include all equipment and
controls necessary to temperature condition two (2) test articles with
dimensions each of 40" width by 31" height by 166" length and
weighting 5000 pounds each in a 10'W x 8"H x 20'L test chamber to
temperatures from 50 to 200 degrees Fahrenheit, for periods of up to 72
hours. The test chamber is an exposed Government building at White
Sands, built at grade, without insulation. [a] The complete TMFCU shall
satisfy all Department of Transportation (DoT) requirements for highway
travel without the use of any special permits. The trailer shall have
a mounted 2 5/16" ball hitch, and shall be configured to be towed by
standard commercial ton and ton "pickup" trucks. A spare tire (mounted
on a wheel) shall be included, and shall be identical to the tires on
the trailer. The trailer shall include a mechanical parking brake that
can be operated manually. The trailer shall not be "packaged." The
complete TMFCU shall be towed to White Sands in a manner consistent
with its intended operation and delivered in operating condition. [b]
The TMFCU shall include a temperature control system that monitors and
controls the temperature of the air in a test chamber. The test volume
air temperature shall be automatically controllable by the air
temperature controller to temperatures ranging from 50 degrees
Fahrenheit (+/-3 degrees Fahrenheit) to 200 degrees Fahrenheit (+/-3
degrees Fahrenheit), with relative humidity uncontrolled, at random
locations inside the test volume. This shall be achieved by adjusting
only one temperature controller set point. The test volume air
temperature controller shall be programmable, and shall specify to the
test volume any and all diurnal test cycles consisting of temperature
ranging from 85 degrees to 160 degrees Fahrenheit. The air temperature
controller shall control by output of a 4 to 20 milliamp signal. A
signal greater than 12 mA shall demand heating, and a signal less than
12 mA shall demand cooling. The air temperature controller shall
employ a type "T" thermocouple sensor to sample the air within the test
volume and shall be digitally displayed on the controller face to a
resolution of 0.1 degrees, and shall operate in either degrees
Fahrenheit or Celsius. The control of the test volume air temperature
shall be selectable from local to remote operation. A set of terminals
shall be provided near the location of the air temperature controller
such that the leads of a remote controller with 4-20 mA signal can be
connected to control the test volume air temperature. A switch shall
be provided which transfers control of the test volume conditions to
either local or remote operation. The remote temperature controller is
not a part of this specification. The test volume air temperature
shall also be monitored by an over and under temperature safety device,
separately independent from the air temperature controller. This device
shall employ a type "T" thermocouple sensor to sample the air in the
test volume, shall be provided with sufficient wire to allow
positioning of the sensor at random locations inside of the test
volume, and shall digitally display the sensor temperature, and the
over and under temperature limits upon demand. The over and under
temperature safety device shall be wired such that when an over or
under temperature condition exists within the test volume, test volume
air circulation and all heating and cooling actions within the test
volume and conditioning ducts shall be terminated and shall be
resetable by manual means only. The contractor shall deliver a complete
set of wiring schematics with the TMFCU. [c] The electric heating
elements shall operate at a sheath temperature below 228 degrees
Fahrenheit. There shall be a separate sheath temperature cut-off device
with a manual reset which is independent from all other safeties. The
heating capacity shall be 24 kW, Silicon Control Rectifier (SCR)
controlled. [d] The refrigeration system capacity shall employ a direct
expansion vapor compression cycle, with an air cooled condenser. The
refrigerant utilized shall be either an HFC or HCFC. The refrigeration
system shall be equipped with all protective devices required for
safeguarding the system against excessive pressures and temperatures.
Suction, discharge, and oil pressure gauges that monitor the operation
of the refrigeration systems shall be mounted on the control panel.
The refrigeration system shall be designed with automatic load controls
which regulate the cooling effect by means other than by stopping and
starting the system compressors, or by stopping the air circulation
fans. The refrigeration system shall include a suction accumulator,
appropriately sized according to the manufacturer's recommendations,
for the capacity of the compressors. The refrigeration system shall be
provided with refrigeration sight glasses. The refrigeration system
shall include a cartridge type liquid line filter and dryer, with a
schrader valve pressure tap. The system shall be automatically pumped
down, with the refrigerant stored in refrigerant receivers, when the
compressors are turned off. Discharge line oil separators, for the
compressor shall be provided and connected as recommended by the
compressor manufacturer. The refrigeration compressor shall be
removable from the unit by way of access doors to the equipment. [e]
The TMFCU shall include one set of discharge and return ducts [to and
from the test chamber]. The ducts shall be 17 " outside diameter, and
shall be positioned on the driver's side of the TMFCU. The control
panel shall be provided with an all-weather enclosure. The weather
cover shall be constructed so as to protect the TMFCU from rain, and
permit at least 18 inches between the TMFCU and the perimeter cover of
the TMFCU. A lighting system which includes perimeter lights shall be
provided for the control console and inside the weather cover to allow
night starting and routine maintenance. The power required shall be
208/230 VAC, 3 phase, with a 100' power cord. A main power disconnect
shall be provided. [f] The contractor shall provide 2 sets of operation
and maintenance manuals, a demonstration plan, and a demonstration
report. The government may choose to witness an in-plant contractor
demonstration. The TMFCU shall remain intact and undamaged after being
towed over surfaced roads with a speed capability of 65 mph and over
graded dirt roads with a speed capability of 25 mph. The conditioning
equipment section and control panel shall be provided with vibration
isolators. The TMFCU shall operate in sand and dust with constant 35
miles per hour wind, with gusts up to 75 miles per hour, for up to 12
hours. The TMFCU shall operate in rainfalls of 3 inches per hour for up
to 4 hours with wind gusts up to 75 miles per hour. The TMFCU shall
operate without degraded performance at temperatures between 0 degrees
Fahrenheit with no solar radiation input and 115 degrees Fahrenheit
with a peak solar radiation intensity of 355 BTU per hour per square
foot. The TMFCU shall operate in altitude varying between sea level and
5500 feet. (vii) FOB is Destination, Building 1840, White Sands Missile
Range, New Mexico. Delivery shall be within 120 days of award. Upon
delivery, the TMFCU will be driven to a test chamber, and set up. A
72-hour test will be conducted. Twenty (20) days are allowed for
inspection, test and acceptance. (viii) The provisions at 52.212-1,
Instructions to Offerors Commercial, applies to this acquisition.
Potential offerors shall contact the acquisition office identified
elsewhere on this synopsis to receive answers to pre-proposal
questions. Proposals shall include concept drawings, identification of
included equipment, and specifications for the system and equipment.
Offers shall provide a cost proposal which includes a detailed bill of
material. Offers shall include your firm's Tax Identification Number
(TIN), Corporation Status, DUNS Number and Commercial and Government
Entity (CAGE) Code if one has been assigned. (ix) Clause 52.212-2,
Evaluation Commercial Items, applies to this acquisition. Proposals
shall include concept drawings, identification of included equipment,
and specifications for the system and equipment. The proposed system
design and specifications shall meet or exceed all requirements in part
vi, above. The three cost trade-off factors are the durability of
system construction and design, reliability and reparability of
included equipment, and ease of operation.(x) Offeror must include a
completed copy of the provisions at 52.212-3, Offeror Representations
and Certifications Commercial Item with his offer. (xi) Clause
52.212-4, Commercial Terms and Conditions Commercial Items, applies to
this acquisition and there are no addendum to this clause. (xii)
Clause 52.212-5, Contract Terms and Conditions Required to Implement
Status or Executive Orders Commercial Items; Clause 52.222-26 Equal
Opportunity; Clause 52.222-35 Affirmative Action for Special Disabled
and Vietnam ERA Veterans; Clause 52.222-36, Affirmative Action for
Handicapped Workers; Clause 52.222-37 Employment Reports on Special
Disabled Veterans & Veterans of the Vietnam Era applies to this
acquisition and there are no addendum's to these clauses. (xiii) The
following additional clauses apply to this action: 252.204-7004 --
Required Central Contractor Registration (Mar 1998) and 252.212-7001 --
Contract Terms and Conditions Required to implement Statutes or
Executive Orders Applicable to Defense Acquisition of Commercial Items
(Jan 1999) and 252-225-7001 -- Buy American Act and Balance of Payment
Program (41 U.S.C 10 E.O. 10582). (xiv) The Defense Priorities and
Allocation System does not apply to this action. (xv) There are no CBD
numbered notes. (xvi) Offers are due 28 Apr 2000, 1400 hours MTZ.
(xvii) For information regarding this solicitation, contact Nati
Cereceres at (505) 678-1931, e-mail cereceresnc@wsmr.army.mil. Posted
04/10/00 (W-SN443029). (0101) Loren Data Corp. http://www.ld.com (SYN# 0265 20000412\23-0002.SOL)