Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF APRIL 13,2000 PSA#2578

1822 VAN PATTON WPAFB OH, 45433

Y -- POLICE TRAINING SCHOOL AND CORPS CENTER OBSTACLE COURSE KING KHALID AIR BASE KHAMIS MUSHAYT SAUDI ARABIA SOL F33657-00-R-0030 DUE 042700 POC EARLE D MUNDELL/CAPT. MICHEAL BEACH,937-257-7298 EXT. OR 937-257-7103 WEB: 00R0030WP-POLICE TRAINING SCHOOL AND CORPS CENTER OBSTACLE, http://www.pixs.wpafb.af.mil/pixslibr/00R0030WP/00R0030WP.asp. E-MAIL: EARLE.MUNDELL@WPAFB.AF.MIL, EARLE.MUNDELL@WPAFB.AF.MIL. Background "A requirement exists on King Khalid Air Base, Khamis Mushayt, Kingdom of Saudi Arabia (KSA) to provide materials, equipment and labor necessary for both design and construction of Air Police Training School & Corps Center Obstacle Course. The scope of this project contains these primary tasks: 1) site survey 2) site documentation and 3) design and construction of obstacle course. (See Section 3 of Statement of Work for further instructions) These requirements are to be reviewed by each contractor during the site visit. A site visit will be arranged within three weeks from the date of the Request for Proposal for the successful offeror. The government prior to submission of the contractor's proposal shall incorporate all clarifications or changes to the original Statement of Work (SOW) made during the site visit. The contractor shall be required to confirm any measurements, quantities, shapes, locations, or sizes during the site visit. The contractor shall coordinate all work with the Royal Saudi Air Force (RSAF) to minimize mission disruption. Overall contract performance period will be 180 days following the notice to proceed (or six months after NTP). All items provided by the contractor will include the applicable manufacturer's warranty and contract warranties for one year. The contractor shall be liable for any damage to RSAF property caused by them during the contract duration. The contractor shall be responsible for obtaining and tracking all passes for the life of the contract. The contractor shall determine the need for a staging area at the pre-construction meeting. The contractor shall obtain permission form the Base Operations and Maintenance (O&M) Department to connect with the existing utilities and absorb all costs associated with those connections. The contractor shall perform all work in accordance with the most recent editions of the national and international codes, standards, regulations, technical orders and safety and health manuals listed in Section 2 of the attached Statement of Work (SOW). The contractor shall be responsible for all construction management and quality control. This shall be performed in accordance with Section 1.13 of the attached SOW. All submissions must be approved by the Administrative Contracting Officer (ACO). The following is a list of the appropriate submissions further elaborated on in Section 4 of the attached Statement of Work (SOW): 1) Materials 2) Equipment 3) Shop Drawings 4) Testing schedule 5) As-Built Drawings and O&M manuals 6) Two-years worth of spare parts. " Posted 04/11/00 (D-SN443496). (0102)

Loren Data Corp. http://www.ld.com (SYN# 0136 20000413\Y-0011.SOL)


Y - Construction of Structures and Facilities Index Page