COMMERCE BUSINESS DAILY ISSUE OF APRIL 14,2000 PSA#2579United States Property and Fiscal Office, P.O. Box 40748, Powell
Avenue, Nashville, TN 37204-0748 Y -- CONSTRUCT KC135 HYDRANT FUELING SYSTEM SOL DAHA40-00-B-0001 DUE
041400 POC Barry Baxter, 615-313-2654 or CPT Sammy Beard, 615-313-2650
E-MAIL: Click here to contact the Contract Specialist via,
baxterbl@tn-arng.ngb.army.mil. The United States Property & Fiscal
Office for Tennessee to construct a KC-135 Aircraft Hydrant Fueling
System for the Tennessee Air National Guard, McGhee Tyson ANG Base,
Knoxville, Tennessee. Work includes providing all labor, materials,
equipment, incidentals, and perform all work as required to construct
a new 3,750 SF POL pumphouse facility for a Type III aircraft hydrant
refueling system complete with pumps, controls, and underground piping
tie-ins to the existing fuel storage tanks and the eight (8) each
hydrant pits in the aircraft parking apron. The hydrant pits are being
furnished and installed by others as part of the aircraft parking
apron currently under construction. The new POL pumphouse will be fully
integrated into the existing POL facility. New underground POL lines
will be required to connect existing hydrant piping loop under apron
with the new pumphouse. Contractor will be required to make the new
Type III hydrant system complete and fully operational. Modifications,
repairs, and inspections of tanks and other equipment to remain will
be required at the POL tank farm. Construction will include demolition
of a small concrete block building and all above ground piping and
associated equipment, including deactivation and abandonment of
underground POL piping and seven (7) existing in-slab fuel hydrant pits
north of project site. Other demolition work includes asphalt/concrete
pavement removal, including underground and above ground utility lines
in some areas. New construction/site improvement work also includes the
relocation of a two-lane bi-directional road for the southwest end of
the base, mass grading and earthwork operations, and storm drainage
collection and detention. Other site improvements consist of upgrading
and relocating government owned underground water, electric, natural
gas, and communications utility lines. Other new construction work
includes new permanent chain link security fencing and new apron pole
lighting. Lawn seeding of all new finished grade work is required.
Contractor will be required to provide gate security within and
external to the project site for the duration of the contract and in
accordance with Metropolitan Knoxville Airport Authority and Air
National Guard security regulations. Magnitude of construction is
between $5,000,000 and $10,000,000. Solicitation documents to include
plans and specifications will be available o/a 12 May 00 with bid
opening occurring o/a 14 Jun 00. Documents may be obtained by remitting
a certified check or money order (NO COMPANY CHECKS)(NON-REFUNDABLE)in
the amount of $275.00 made payable to the US Treasury. This
solicitation will be issued unrestricted therefore bids will be
accepted from small as well as large business firms. Be advised that
contractors seeking award of Department of Defense contracts must be
registered in the Central Contractor Registration (CCR) database prior
to award. Posted 04/12/00 (W-SN444224). (0103) Loren Data Corp. http://www.ld.com (SYN# 0111 20000414\Y-0004.SOL)
Y - Construction of Structures and Facilities Index Page
|
|