Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF APRIL 19,2000 PSA#2582

U.S. Army Aviation and Missile Command, Acquisition Center, Bldg 4488, Redstone Arsenal, AL 35898-5280

56 -- SOUND CONTROL BLANKET SOL DAAH23-00-R-0288 DUE 060200 POC Patti Page, (256) 842-7638, or 955-9196 SYNOPSIS: Request for Proposal (RFP) Number: DAAH23-00-R-0288; PRON: AX0C0171AX; NSN: 5640-01-146-6507; Quantity: 40 each, with 100 percent option to be exercised within 365 days; Part Number: AV145E4019-23; Restricted to Boeing Helicopter, and Fabritech, Incorporated; Noun: Sound Control Blanket; SIC Code: 2399; Closing Date: 2000 June 02; Applicable to the CH-47 Aircraft. Deliveries are F.O.B. Destination to Texarkana, TX. Required delivery with First Article Testing (FAT) is 40 each 333 Days after contract award (DACA). First Article Test Report (FATR) is due 198 DACA. Required delivery without FAT is 40 each 210 DACA. Point of Contact: Patti Page, Telefax: (256) 842-7638, or 955-9196; Office: AMSAM-AC-AL-C. To obtain this solicitation package, send a telefax to the person shown above, being sure to include company name, address, telephone number, and solicitation/RFP number. Only approved sources are Boeing Helicopter, and Fabritech, Incorporated. This part must be acquired from a manufacturing source(s) specified on a source control or selected item drawing as defined by the current version of DOD-STD-100. All responsible sources may submit an offer which will be considered. Firms are encouraged to seek source approval in order to compete for future solicitations by submitting a source approval request (SAR) package to AMCOM, AMSAM-AR-EI-FS/James Procyk, (256) 313-4907, Building 5681, Redstone Arsenal, AL 35898-5000. Item Number 0001AA requires two bids, (1) Bid A, with First Article Test Report (FATR), and (2) Bid B, No FATR required. See Numbered Notes 23, and 26. Posted 04/17/00 (W-SN445732). (0108)

Loren Data Corp. http://www.ld.com (SYN# 0196 20000419\56-0002.SOL)


56 - Construction and Building Materials Index Page